Corinthian order
The Corinthian order is the classical column order with a tall capital of carved acanthus leaves and small volutes at the corners.
What is the Corinthian order?
The Corinthian order (korintský rád) is the third classical column order, after the Doric and the Ionic. Vitruvius is the Roman author of the oldest surviving text on the orders. He says the Corinthian column has the same proportion as the Ionic one everywhere except in the capital. The capital is what sets it apart. An open textbook from the University of Illinois says the column has leaves carved or cast to resemble those of the acanthus plant. The Encyclopaedia Romana, a University of Chicago reference, describes two rows of acanthus leaves. Stalks sprout into spirals, called volutes, at the angles.
A flat slab, the abacus, sits on top of the capital. The Encyclopaedia Romana says it carries an acanthus flower in the centre of each side.
Where does the Corinthian order come from?
Vitruvius gives the origin as a story, not a record. A Corinthian girl of marriageable age died. After the burial her nurse put the girl's favourite things in a basket, carried it to the tomb and put a tile on top. The basket stood on the root of an acanthus plant. In spring the plant pushed up stems and large leaves, and as they grew they reached the corners of the tile and curled into volutes. The sculptor Callimachus, whom the Athenians called Catatechnos, passed by and saw the basket and the leaves around it. He used the form to build columns of this kind in the country around Corinth. Vitruvius says he fixed their proportions by rule.
The story explains the look of the capital. It does not give a date, so this page gives none. The Encyclopaedia Romana entry gives no date of origin either.
What are the proportions of the Corinthian column?
Vitruvius measures in diameters, meaning multiples of the thickness of the shaft at its foot. His figures describe a model he sets out, not a particular building. In Book IV, chapter 1, he says the first Doric columns were six diameters high and the first Ionic ones eight. Later builders, he says, preferred a more slender look and gave the Doric seven diameters and the Ionic eight and a half. The table lists what he states about the Corinthian and its neighbours. The last row is arithmetic, not a quotation.
| Element | Vitruvius rule | Section |
|---|---|---|
| Doric column height | 7 diameters | IV.1.8 |
| Ionic column height | 8.5 diameters | IV.1.8 |
| Corinthian shaft | Same proportion as the Ionic | IV.1.1 |
| Ionic capital height | One third of the shaft diameter | IV.1.1 |
| Corinthian capital height | Equal to the thickness of the shaft | IV.1.1 |
| Corinthian column height | About 9 1/6 diameters (calculated: 8.5 plus the two thirds that the taller capital adds) | derived from IV.1.1 and IV.1.8 |
Vitruvius says the two thirds of the thickness that the capital adds make the column taller and more graceful. He does not state the total in diameters, so the 9 1/6 above is a sum of two of his figures.
Other authors draw other figures. The Illinois textbook shows the five orders as Vignola drew them, and in that drawing the Corinthian column is ten diameters high. The textbook also says the proportions of the orders vary from structure to structure and from age to age. A figure for an order therefore always needs the name of the author who gave it.
How is the Corinthian capital built up?
Vitruvius sets out the capital step by step in IV.1.11 and IV.1.12. The height of the capital, abacus included, equals the diameter of the lower part of the column. The width of the abacus follows from its diagonal, which equals twice its height. The four faces of the abacus curve inwards from the extreme angles by one ninth of their extent. The abacus itself is one seventh of the height of the whole capital.
Vitruvius divides the rest of the height into three parts. The lower leaf takes the first third and the middle leaf the next third. The stalks, called caulicoli, take the last third and carry the leaves up to the abacus. Large volutes branch from them towards the angles and smaller volutes spread towards the flowers. A flower sits in the middle of each face of the abacus, and its diameter equals the height of the abacus. Vitruvius adds that capitals of other kinds were also set on these columns. He says they fit no other class, and he traces their origin to the Corinthian, Ionic and Doric.
How is the Corinthian order different from the Doric and Ionic?
The capital is the quickest way to tell the three apart. The Illinois textbook says that observing the capital is the easiest way to tell an order. The table sets out what Vitruvius says about each order.
| Feature | Doric | Ionic | Corinthian |
|---|---|---|---|
| Column height | 7 diameters (14 modules of half a diameter, IV.3.4) | 8.5 diameters | Ionic proportion, plus a taller capital |
| Capital | One module high: abacus, echinus and neck (IV.3.4) | Volutes, one third of a diameter high | Acanthus leaves and volutes, one diameter high |
| Entablature | Triglyphs and metopes (IV.3.4) | Sculptured frieze, dentils and a cornice (IV.1.2) | No rules of its own, borrowed from the Doric or Ionic (IV.1.2) |
The Composite order is a later combination of the Corinthian leaves with the Ionic volutes. For the general parts of a column, see column. For the horizontal band the Corinthian column carries, see entablature.
How did the Corinthian order spread in Roman architecture?
The Encyclopaedia Romana calls the Corinthian the most common Roman order, especially for temples. The Illinois textbook says tradition recognizes three orders as Greek, the Doric, Ionic and Corinthian. The Romans adopted these three and created two more, the Tuscan and the Composite. The textbook also says Renaissance architects began to revive classical columns and arches. Neither source gives a date for the first Corinthian capital.
The classicist revival is covered in its own entry.
Frequently asked questions
- What is the Corinthian order?
- The Corinthian order is the third classical column order. Vitruvius gives it the Ionic shaft proportion and a tall capital carved with acanthus leaves and volutes at the corners.
- Who invented the Corinthian capital?
- Vitruvius tells a story about a basket on a tomb in Corinth with an acanthus plant growing round it. He names the sculptor Callimachus as the man who turned the form into columns. He gives no date.
- How tall is a Corinthian capital?
- Vitruvius says the capital is as high as the thickness of the shaft, abacus included, while the Ionic capital is one third of that thickness. The abacus is one seventh of the capital height.
- How tall is a whole Corinthian column?
- Vitruvius does not state a total. Adding the two thirds of a diameter that the taller capital contributes to his Ionic height of 8.5 diameters gives about 9 1/6 diameters. The Illinois textbook shows Vignola's Corinthian column at ten diameters.
- How is the Corinthian order different from the Ionic order?
- The shaft follows the Ionic proportion, so the difference lies in the capital. The Corinthian capital is taller and covered in acanthus leaves, while the Ionic capital has volutes.
- Is the Corinthian order Greek or Roman?
- Tradition counts it as one of the three Greek orders. The Encyclopaedia Romana calls it the most common Roman order, especially for temples.
Sources
- Vitruvius, On Architecture, Book IV (English translation) · LacusCurtius, University of Chicago (Thayer) · Book IV, chapter 1, sections 1, 2, 8 to 12, and chapter 3, section 4
- Corinthian Capital (Encyclopaedia Romana entry) · University of Chicago (Penelope, Encyclopaedia Romana)
- The Orders (open textbook chapter, Design and the Built Environment) · University of Illinois Urbana-Champaign, Illinois Open Publishing Network · The Orders, introduction and the Corinthian Order