Composite order

The Composite order is the Roman column order whose capital combines the volutes of the Ionic with the acanthus leaves of the Corinthian.

What is the Composite order?

The Composite order (kompozitný rád) is a classical column order whose capital combines the Ionic volutes with the Corinthian acanthus leaves. The University of Illinois open textbook on the orders puts it in one line: the order "has both Ionic volutes and the Corinthian acanthus leaves". The Metropolitan Museum of Art holds a print dated ca. 1537 and titled Composite of Corinthian and Ionic. Its title names the two parent orders. In this article the term means the capital, because the shaft follows the Corinthian and Ionic proportion.

Does Vitruvius describe the Composite order?

No. In Book IV, chapter 1, Vitruvius names three kinds of column, the Doric, Ionic and Corinthian. He says the Corinthian column is, except in its capital, of the same proportion as the Ionic. He treats the Tuscan temple later, in chapter 7. The Composite appears in neither place.

Vitruvius does make one remark that comes close. At the end of his Corinthian capital rules he says that capitals of other kinds were also set on these columns. He says they fit no other class and traces their origin to the Corinthian, Ionic and Doric. He does not call them an order and does not give them rules.

OrderNamed in Vitruvius, Book IV?What the text says
DoricYes, chapter 1 and chapter 3Rules for the Doric temple in chapter 3
IonicYes, chapter 1Capital one third of the shaft diameter
CorinthianYes, chapter 1Same proportion as the Ionic except in the capital
TuscanYes, chapter 7Tuscan temples
CompositeNoNot named. Other mixed capitals are mentioned without rules

Where does the Composite order come from?

The Illinois textbook says tradition recognizes three orders as Greek. The Romans adopted these and created two more, the Tuscan and the Composite. The Encyclopaedia Romana, a University of Chicago reference, describes the Arch of Titus in Rome. It says the capitals of the engaged fluted columns on each side of the arch are the earliest example of the Composite style. The entry does not date the capitals beyond the arch itself, so this page gives no year for them.

The Illinois textbook also shows a Composite capital and entablature from the Arch of Septimius Severus in Rome. Both examples are Roman, which fits the Roman origin the textbook gives.

Who made the Composite a named order?

The sources I opened point to Sebastiano Serlio. Francesco Marcolini printed his book on the orders, Regole generali di architettura, in Venice in 1537. The Columbia University Avery Library lists the title page of that edition. It names five manners of building: Tuscan, Doric, Ionic, Corinthian and Composite, in that order. The Metropolitan Museum of Art holds a copy of the 1537 book.

An exhibition page of the KU Leuven Libraries says Serlio dealt with the four classical orders. It says he added the Composite as an extra order, a mix of Ionic and Corinthian elements. The same page says he was the first to catalogue the five orders. A Dutch translation of the book already listed the five names in its title by 1539.

SourceWhat it says about the Composite
Vitruvius, Book IVNot named. Other mixed capitals mentioned, with no rules
Encyclopaedia Romana, Arch of TitusEarliest example of the Composite style, in the arch capitals
Serlio, 1537, via Columbia Avery LibraryTitle page lists Composite as the fifth kind
KU Leuven exhibitionSerlio added it as an extra order and catalogued the five

Take care with the word first. Those pages show that Serlio printed the five orders as one set. I did not open an earlier writer on the Composite, so this page does not claim that nobody named it before 1537.

How does the Composite capital differ from the Ionic and Corinthian capitals?

The Composite takes one element from each parent. The Ionic capital gives the volutes, the scrolls at the top. The Corinthian capital gives the acanthus leaves, the carved foliage on the body. The Illinois textbook says the capital is the easiest way to distinguish an order. It describes one stylized Composite capital with Ionic volutes decorated with acanthus leaves. Acanthus leaves sit below the volutes.

The shaft does not change the picture. Vitruvius gives the Corinthian shaft the Ionic proportion, and the Composite is a variant of the Corinthian capital. In the Vignola drawing in the Illinois textbook, the Corinthian and Composite columns are both drawn at a ratio of one to ten.

What do people commonly get wrong about the Composite order?

  • That it is a Greek order. Tradition counts three Greek orders, and the Illinois textbook says the Romans created the Composite.
  • That Vitruvius describes it. Book IV names the Doric, Ionic and Corinthian in chapter 1 and the Tuscan in chapter 7, and does not name the Composite.
  • That it is only a large Corinthian capital. The Met print title names two parent orders, and the Illinois textbook describes both Ionic volutes and Corinthian leaves in the capital.
  • That Serlio invented the capital. The Encyclopaedia Romana places the earliest example on a Roman arch. Serlio's role in the sources I opened is that of printing it as the fifth order.

For the parent orders, see Corinthian, Ionic, Doric and Tuscan. The wider style has its own entry, classicism.

Frequently asked questions

What does the Composite order combine?
It combines the volutes of the Ionic capital with the acanthus leaves of the Corinthian capital. The term usually means the capital alone.
Is the Composite order Greek or Roman?
Roman. The University of Illinois textbook says tradition counts three Greek orders and that the Romans created the Tuscan and the Composite.
Is the Composite order in Vitruvius?
No. Book IV, chapter 1, names the Doric, Ionic and Corinthian orders, and chapter 7 treats Tuscan temples. Vitruvius only mentions other mixed capitals, without rules.
Who codified the Composite order?
Sebastiano Serlio printed it as the fifth order in his book of 1537 on the five orders. The sources I opened do not rule out an earlier writer who named it.
What is the earliest known Composite capital?
The Encyclopaedia Romana calls the capitals of the Arch of Titus in Rome the earliest example of the Composite style. It gives no year for them.
How can I tell a Composite capital from a Corinthian one?
Look at the upper zone of the capital. A Composite capital shows large Ionic volutes above its acanthus leaves. A Corinthian capital has leaves and small volutes at the corners.

Sources

  1. Vitruvius, On Architecture, Book IV (English translation) · LacusCurtius, University of Chicago (Thayer) · Book IV, chapter 1, sections 1 to 3, 11 and 12, and chapter 7
  2. The Orders (open textbook chapter, Design and the Built Environment) · University of Illinois Urbana-Champaign, Illinois Open Publishing Network · The Orders, introduction and the Composite Order
  3. Arch of Titus (Encyclopaedia Romana entry) · University of Chicago (Penelope, Encyclopaedia Romana)
  4. Digital Serlio: Published Editions · Columbia University Libraries, Avery Architectural and Fine Arts Library · Book IV, 1537
  5. Sebastiano Serlio, Vitruvius, breeding ground for Renaissance architecture · KU Leuven Libraries, Special Collections
  6. Composite of Corinthian and Ionic, from Speculum Romanae Magnificentiae · The Metropolitan Museum of Art, Open Access collection API
  7. Regole generali di architettura (Sebastiano Serlio) · The Metropolitan Museum of Art, Open Access collection API