Pilaster
A pilaster is a flat, rectangular projection from a wall that is treated like a column and has a capital and a base.
A pilaster is a flat, rectangular projection from a wall that is treated like a column. It projects only slightly from the surface and stays bonded to the wall behind it. The Slovak term is pilaster.
What is a pilaster in architecture?
A pilaster is a shallow rectangular projection that looks like a column. The Medieval Art glossary at the University of Pittsburgh defines a true pilaster as "a rectangular element of vertical masonry which projects only slightly from the wall" and says it "has both a capital and a base". The Looking at Buildings guide puts it more briefly: a pilaster is "a column represented in relief". The same guide calls it a flat representation of a classical column in shallow relief.
A free-standing column can be walked around. A pilaster cannot, because it remains bonded to the wall behind it. This is why you read a pilaster on the wall surface and not as a separate support in front of it.
Where did the pilaster come from?
The pilaster borrows its form from the classical orders. Looking at Buildings says that the classical orders share certain codified forms. Their shafts taper upward within fixed or limited proportions. They have distinctive capitals and usually a distinctive base. A pilaster on a facade therefore carries the same vocabulary as a column in a colonnade.
The History of Art says that Renaissance architects studied and systematised ancient precedents on urban palace facades, and that ancient examples were later reinterpreted in Renaissance and later revivals. Its examples include the Temple of Portunus, the Colosseum, the Palazzo Rucellai and the east front of the Louvre. For the Renaissance tradition, see Renaissance architecture.
How is a pilaster different from an engaged column?
Both elements sit against a wall, so the difference is easy to miss in an elevation. The History of Art says an engaged column is "round or polygonal and partly embedded in a wall", while a pilaster is flat-faced. In other words, a pilaster is a column in relief, and an engaged column keeps a curved shaft. The table below sets out the differences that matter when you survey an existing facade.
| Feature | Pilaster | Engaged column |
|---|---|---|
| Plan shape | Shallow rectangle | Round or polygonal shaft |
| Face | Flat | Curved |
| Relation to the wall | Stays bonded to the wall behind | Partly embedded in the wall |
Looking at Buildings adds that where free-standing columns do not suit a building, columns are "sometimes engaged", so that they appear as if set into the wall. It names half-columns, three-quarter columns and quarter-columns for inner corners. It adds that "still more common is the use of the pilaster". It also notes that pilasters can be made to "overlap with each other, or with engaged columns".
Does a pilaster carry load?
Not always. The History of Art says that a pilaster or engaged column "may be structural, partly structural or applied". It can carry load, partly carry it, or serve only as decoration. The same source warns that projection alone cannot prove structural action. To tell which case you have, examine the material continuity, the bonding and the frame behind the order, not the projection alone.
This matters in a renovation. Before cutting into, removing or re-facing a pilaster on an existing building, have a structural engineer confirm the load path. A surface finish can hide the difference between a decorative element and a bearing one.
Which parts make up a pilaster?
A pilaster follows the column it imitates. The Pittsburgh glossary names two parts that a true pilaster has, a capital and a base, and the shaft lies between them. The table summarises each part.
| Part | Position | What the sources say |
|---|---|---|
| Base | Foot of the element | A true pilaster has one, according to the Pittsburgh glossary |
| Shaft | Body between base and capital | In the classical orders the shaft tapers upward within fixed or limited proportions, according to Looking at Buildings |
| Capital | Top of the element | A true pilaster has one, and classical capitals are distinctive for each order |
Do pilasters appear on historicist and secession facades?
Historicism reworked forms of earlier styles in new buildings, and the pilaster is one of those forms. The historicism entry notes giant pilasters on one hotel. For the wider styles, see also Vienna Secession. The sources used for this entry describe the pilaster in general terms. They do not date its use on any particular Slovak building and do not say how common it is on secession facades. Verify a claim that a house is historicist because of its pilasters against the building's drawings and the regional heritage records.
Why does it matter whether a facade element is a pilaster or a column?
The label changes how you read the building. A column in the structural sense is a load-carrying member. A pilaster is a wall element that may or may not carry load. Mislabelling one as the other can lead to the wrong work. The column entry covers the structural member, and the rustication entry covers a different way of treating a classical wall surface.
In practice, record the element on the survey drawing as a pilaster or an engaged column, and note whether it is bonded to a masonry wall. Flag any crack that runs through its base or capital for a structural check.
Frequently asked questions
- What is the difference between a pilaster and a column?
- A column is a free-standing support that you can walk around. A pilaster is a shallow rectangular projection treated like a column, and it stays bonded to the wall behind it. Where free-standing columns do not suit a building, designers use engaged columns or, more often, pilasters.
- Is a pilaster always structural?
- No. A pilaster may be structural, partly structural or applied. Projection alone cannot prove that it carries load, so check the material continuity, the bonding and the structure behind it.
- How can I tell a pilaster from an engaged column?
- Look at the plan. A pilaster has a flat face and a shallow rectangular plan. An engaged column is round or polygonal and partly embedded in the wall, so it keeps a curved shaft.
- Where does the pilaster come from?
- It comes from classical architecture, where the orders share codified forms. The History of Art says Renaissance architects studied ancient precedents and used them on urban palace facades. Historicism later reworked such forms, as the historicism entry explains.
- Can a pilaster have a base and a capital?
- Yes. The University of Pittsburgh glossary says a true pilaster has both a capital and a base. The shaft lies between them.
- Should a pilaster be removed during a renovation?
- Not without checking first. Have a structural engineer confirm whether the element carries load before you cut into it or remove any part of it.
Sources
- Pilasters and engaged columns · The History of Art · Definition, engaged column, structural or applied, bonded to the wall, Renaissance precedents, examples
- The orders · Looking at Buildings (Historic England education resource) · Classical styles, the orders, glossary entry
- Glossary of Medieval Art and Architecture: pilaster · University of Pittsburgh, Department of History of Art · Pilaster entry