URBION Information System
URBION is the name used for the Office's information system. Its builder-facing part, the Portál výstavby, launched on 1 April 2025.
What is URBION?
URBION is a name that people use for the electronic system of the Office for Spatial Planning and Construction (the Office). The official name of the part that builders use is Portál výstavby (Construction Portal).
The name URBION does not appear in the Building Act 25/2025 Z. z. It is also absent from decree 60/2025 Z. z., from the portal page and from the Office annual report for 2025. The act speaks of "informačný systém" (§ 8 ods. 3).
Press articles in 2023 used the name Urbion for the system that was then planned. The system in use today is the Portál výstavby.
What does the system contain?
Decree 60/2025 Z. z. says the Portál výstavby is a part of the information system of spatial planning and construction (§ 1 ods. 1). It names six components (§ 1 ods. 2).
- a repository for building documentation.
- the construction register (register výstavby).
- the register of buildings.
- the list of affected authorities.
- the list of affected legal entities.
- the list of associations of owners of information devices.
The register of buildings is not public. The Office operates the system and makes data from it available to the public in its public part (25/2025 Z. z. § 13 písm. t).
What is done in the system?
Building documentation is usually prepared electronically and stored there (25/2025 Z. z. § 8 ods. 3). The builder or the designer makes the project documentation available in the system and asks for the binding opinions (§ 20).
The application for the building intent is filed electronically on a set form. If the attachments are already in the system, the application links to them (§ 50 ods. 1 a 2). The building authority can deliver a document by sending a link to the place where it is available in the system (§ 81 ods. 6).
During construction, the builder or the site manager records the inspection minutes there (§ 43 ods. 4). At handover, the contractor must record the handover protocol in the system (§ 32). The construction diary is kept in electronic form as a rule (§ 10 ods. 2).
Do I have to use URBION?
No. Electronic submission is the rule, but the act allows paper. Any person may perform any procedural act on paper until 31 March 2029. A natural person may do so after that date too (25/2025 Z. z. § 84 ods. 15).
A paper notification is converted to electronic form by the authority and stored in the system (§ 63 ods. 3). The Office annual report says that natural and legal persons may also file applications and notifications on paper. For the later check of the finished building, see occupancy approval.
How do I log in and submit?
You register as a user first. You can then log in with a name and password, with an electronic ID card or by another supported method. Some functions require the electronic ID card or a similar method (decree 60/2025 Z. z. § 1 ods. 6).
An electronic submission has all parts in electronic form, and its limit is 100 MB with the attachments. A submission with any part on paper counts as a paper submission (decree 60/2025 Z. z. § 2 ods. 2 až 4). Documentation that is already stored in the repository does not count toward the limit.
When did the system start and how much is it used?
The Office opened the Portál výstavby on 1 April 2025, the day the Building Act took effect. By 31 December 2025 the portal had 20,223 registered users, 10,311 created projects and 22,813 submitted requests (Office annual report 2025, p. 40).
The portal page lists release notes dated 5 June, 23 September and 29 September 2026. A schedule in the 2023 press named versions 1.0 to 4.0 with dates from 2024 to 2032. The portal started a year later than that schedule, so this page does not repeat its dates.
Does the system replace the territorial and building procedures?
No. The system stores and moves the documents. The act sets the procedures. Under § 84 ods. 11 the old territorial procedure is now the building intent proceeding, and the old building procedure is now the verification of the building project.
| Name until 31 March 2025 | Name from 1 April 2025 |
|---|---|
| územné konanie | konanie o stavebnom zámere |
| stavebné konanie | overenie projektu stavby |
| kolaudačné konanie | kolaudácia |
The two steps remain separate. The decision on the building intent comes first, then the verification of the project (see building intent proceedings). The building act sets both.
What happens if the system is not available?
If a person cannot perform acts in the information system, the acts are done under a separate regulation. The Office announces this on its website, and it also announces when the system returns to operation (25/2025 Z. z. § 84 ods. 16). The act sets no fixed period for an outage.
Frequently asked questions
- What is URBION?
- URBION is the name people use for the information system of the Office for Spatial Planning and Construction. The official name of the part builders use is Portál výstavby. It is a part of the information system of spatial planning and construction (decree 60/2025 Z. z. § 1 ods. 1).
- Is URBION mandatory?
- No. Electronic submission is the rule, but any person may use paper until 31 March 2029. A natural person may use paper after that date too (25/2025 Z. z. § 84 ods. 15).
- When did URBION start?
- The Office launched the Portál výstavby on 1 April 2025, the day the Building Act took effect. By 31 December 2025 it had 20,223 registered users (Office annual report 2025).
- How do I log in to URBION?
- You register first, then log in with a name and password or with an electronic ID card. Some functions require the electronic ID card or a similar method (decree 60/2025 Z. z. § 1 ods. 6).
- Does URBION replace the territorial decision and the building permit?
- No. The act sets the procedures. The old territorial procedure is now the building intent proceeding. The old building procedure is now the verification of the building project (25/2025 Z. z. § 84 ods. 11).
- Is the construction diary kept in the system?
- The act says the construction diary is kept in electronic form as a rule. The content of the diary is set in Annex 20 of the decree (25/2025 Z. z. § 10 ods. 2, decree 60/2025 Z. z. § 6 ods. 7).
Sources
- Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Národná rada Slovenskej republiky, via Slov-Lex · § 8, 10, 13, 20, 32, 43, 50, 63, 81, 84
- Vyhláška Úradu pre územné plánovanie a výstavbu Slovenskej republiky č. 60/2025 Z. z. o štruktúre a prevádzke informačného systému územného plánovania a výstavby, o obsahu podaní a obsahu a rozsahu dokumentácie stavby · Úrad pre územné plánovanie a výstavbu SR, via Slov-Lex · § 1, 2, 3, 6
- Portál výstavby · Úrad pre územné plánovanie a výstavbu SR
- Výročná správa Úradu pre územné plánovanie a výstavbu SR za rok 2025 · Úrad pre územné plánovanie a výstavbu SR · Portál výstavby, pp. 40 and 73
- Od apríla 2024 má Urbion fungovať v základnej verzii, stavebný úrad pracuje na vyhláškach, platiť budú prechodné obdobia · ASB.sk, 23 August 2023