Holding tank (cesspit)
A holding tank (žumpa) is a watertight underground tank that stores household wastewater until it is hauled to a treatment plant.
A holding tank (žumpa) is a watertight underground tank that collects wastewater from a house until someone hauls it to a wastewater treatment plant. The tank stores the water and does not treat it. The Slovak water act (364/2004 Z. z.) names watertight holding tanks as an individual system. It can serve a house where a public sewer is missing. The act also sets a duty to prove that the contents were hauled away.
What is a holding tank and how does it differ from a treatment plant?
The water act says that wastewater collected in a holding tank must be disposed of in a wastewater treatment plant (§ 36 ods. 2 and 3). The tank is therefore a store, not a treatment plant. The same paragraph lists holding tanks and small treatment plants as examples of individual systems. A small treatment plant is a set of structures that cleans sewage before it is discharged to water or ground. The act sizes it at up to 50 population equivalents and an inflow below 10 m3 per day (§ 36 ods. 18).
The sewerage act (442/2002 Z. z.) says that holding tanks and domestic treatment plants are not part of a public sewer (§ 3 ods. 5 písm. f). The septic tank entry explains how a septic tank differs from a holding tank.
| Feature | Holding tank (žumpa) | Small treatment plant | Public sewer |
|---|---|---|---|
| What the act says it does | Collects wastewater, which must go to a treatment plant (§ 36 ods. 2) | Cleans sewage before discharge or other use (§ 36 ods. 18) | Drains and treats communal wastewater (§ 36 ods. 2) |
| Where the act allows it | Individual system (§ 36 ods. 2 and 3) | Individual system, in sparsely populated areas (§ 36 ods. 3) | Required in an agglomeration above 2 000 population equivalents (§ 36 ods. 2) |
| Proof the owner keeps | Hauling certificates (§ 36 ods. 4) | The act sets details in a government regulation (§ 36 ods. 19) | Connection contract (442/2002, § 23 ods. 1) |
When may a house use a holding tank instead of a sewer?
In an agglomeration above 2 000 population equivalents, communal wastewater must be drained and treated through the public sewer only (§ 36 ods. 2). The act allows an exception where a public sewer brings no benefit to the environment or costs disproportionately much. Then an individual system may be used if it gives the same level of environmental protection. For a holding tank, the authority gives its reasons in the permit (§ 36 ods. 2).
In smaller agglomerations without a sewer, and in sparsely populated areas outside agglomerations, the act allows individual systems besides the public sewer. Holding tanks are named as the main example, and small treatment plants are named for sparsely populated areas (§ 36 ods. 3).
The permit for such a system can be issued only for a fixed period. Where a public sewer is built and in operation, the permit is not extended after it expires (§ 36 ods. 4).
Must the owner of a holding tank connect to a sewer later?
Yes, when a sewer exists and a connection is realistic. The owner of a building or plot must connect it to the public sewer if the municipality has one. The duty does not apply if the water authority gave the owner a permit for another way to handle wastewater (442/2002, § 23 ods. 2). The owner of a plot with a permitted holding tank must also connect. This applies if a connection is technically possible and does not need unreasonably high costs (§ 23 ods. 2). The municipality imposes this duty on the owner (§ 4 ods. 14). The sewer connection entry covers the connection itself.
What proof of emptying must the owner keep?
A person who collects wastewater in a holding tank must make sure it is disposed of by hauling it to a treatment plant. The municipality or the water authority may call on the owner to present proof of hauling. The proof covers the last two years at most (§ 36 ods. 4). Only the public sewer operator, the municipality or a person authorised under a special regulation may haul the wastewater. The hauler must give a hauling certificate (doklad o odvoze) to the person who asked for the hauling. The act lists what the certificate contains.
| Item on the hauling certificate | What it records |
|---|---|
| First name, surname and address | The person for whom the hauling was done |
| Date of hauling | The day the tank was emptied |
| Place of the tank | Where the holding tank stands |
| Quantity of wastewater | The amount hauled away |
| Name of the hauler | The person who did the hauling |
| Address of the treatment plant | The plant that received the wastewater |
The text of § 36 sets no emptying interval and no longer keeping period.
Where may the contents of a holding tank not go?
The water act forbids discharging the contents of holding tanks into surface water and into groundwater (§ 36 ods. 15). The sewerage act forbids emptying them into the sewer network. This applies where the public sewer includes a treatment plant that treats the water as its permit requires (442/2002, § 23 ods. 7). The legal route is therefore hauling to a treatment plant, with a certificate.
How does the building act treat a holding tank?
The building act (25/2025 Z. z.) lists holding tanks among minor structures. These are underground structures with a built-up area up to 25 m2 and a depth up to 3 m (§ 2 ods. 4 písm. b). The act requires notification to the building office for minor structures under § 2 ods. 4 písm. a to c (§ 18 ods. 3). The minor structure notification entry describes that procedure. A larger tank is not a minor structure, and then the decision on the building intent applies unless the act says otherwise (§ 18 ods. 2). The permit that § 36 ods. 4 mentions is a separate matter. The architect should show the tank on the drawings and agree the hauling route with the owner early.
What should a designer check?
These points follow from the rules above. They are design advice, not legal requirements.
- Ask the municipality whether a public sewer exists or is planned. The permit has a fixed period, and the connection duty can arise later.
- Keep a clear route for the hauling vehicle to the tank, because the contents must be hauled away.
- Show the tank on the drawings, with its volume and place, because the hauling certificate must name the place of the tank.
- Tell the owner to order hauling only from the sewer operator, the municipality or an authorised person. Advise the owner to keep the certificates of the last two years.
What are common misconceptions about holding tanks?
The first is that a holding tank cleans the water. It does not, and the act requires the contents to go to a treatment plant. The second is that the tank needs no paperwork after it is built. The owner must present proof of hauling on request. The third is that the permit lasts forever. The permit is issued for a fixed period only, and it is not extended where a public sewer is in operation.
Frequently asked questions
- Is a holding tank the same as a septic tank?
- No. A holding tank stores wastewater, and the water act requires the contents to go to a treatment plant. The septic tank entry explains how a septic tank differs.
- Who may haul the contents of a holding tank?
- Only the public sewer operator, the municipality or a person authorised under a special regulation (364/2004, § 36 ods. 4). The hauler must give a hauling certificate to the person who asked for the hauling.
- How long must I keep the hauling certificates?
- The act asks for proof of hauling for the last two years at most. The municipality or the water authority may call for it (§ 36 ods. 4). The act sets no longer keeping period.
- What happens to my holding tank if the municipality builds a sewer?
- The permit for the individual system is not extended after it expires where a public sewer is in operation (§ 36 ods. 4). The owner must connect if this is technically possible and does not need unreasonably high costs (442/2002, § 23 ods. 2).
- Can I use a holding tank in a town?
- In an agglomeration above 2 000 population equivalents, communal wastewater must go through the public sewer only. One exception applies where a sewer brings no environmental benefit or costs disproportionately much. The authority must then give its reasons in the permit (§ 36 ods. 2).
- Can I empty a holding tank into a stream or a field?
- No. The act forbids discharging the contents of holding tanks into surface water and groundwater (§ 36 ods. 15). The contents must be hauled to a treatment plant.
Sources
- Zákon č. 364/2004 Z. z. o vodách a o zmene zákona Slovenskej národnej rady č. 372/1990 Zb. o priestupkoch (vodný zákon) · Národná rada Slovenskej republiky, via Slov-Lex · § 36 ods. 2, 3, 4, 15, 18, 19
- Zákon č. 442/2002 Z. z. o verejných vodovodoch a verejných kanalizáciách a o zmene a doplnení zákona č. 276/2001 Z. z. o regulácii v sieťových odvetviach · Slov-Lex · § 3 ods. 5 písm. f); § 4 ods. 14; § 23 ods. 1, 2, 7
- Zákon č. 25/2025 Z. z. o výstavbe a o zmene a doplnení niektorých zákonov (stavebný zákon) · Národná rada SR, via Slov-Lex · § 2 ods. 4 písm. b); § 18 ods. 2, 3