Blackwater treatment

Blackwater treatment is the handling of toilet wastewater, which carries urine and faeces, as a stream separate from greywater.

What is blackwater treatment?

Blackwater treatment is the handling of wastewater from toilets before it is discharged, infiltrated or reused. Eawag is the Swiss Federal Institute of Aquatic Science and Technology. It defines blackwater as wastewater from toilets. Blackwater consists of excreta (urine and faeces), flushwater and cleansing materials. Eawag also states that blackwater is a risk to public and environmental health if it is not treated well. It contains nutrients, energy and water, so it is also valuable for resource recovery (Eawag fact sheet "Blackwater", March 2022).

The term is a technical concept from sanitation engineering. It is not a legal category in Slovakia, as the next section shows.

How is blackwater different from greywater?

The Eawag Compendium of Sanitation Systems and Technologies defines greywater as the water from washing food, clothes and dishware and from bathing. Greywater may contain traces of excreta and therefore pathogens. In this source, kitchen sink water is greywater, not blackwater. The greywater recycling entry covers the reuse of the lighter stream.

FeatureBlackwaterGreywater
SourceToiletsWashing food, clothes and dishware, and bathing
ContentUrine, faeces, flushwater and cleansing materialsWashing and bathing water. It may contain traces of excreta
Why keep it apartEawag: excreta that is not mixed with greywater and stormwater reduces the volume to treatEawag: collected separately, it can serve for toilet flushing or other non-drinking uses

Eawag notes that in Switzerland most blackwater travels to treatment together with greywater in sewers.

Does Slovak law regulate blackwater separately?

No. The water act (364/2004 Z. z.) and the sewerage act (442/2002 Z. z.) do not use the words blackwater or greywater. A text search of both acts and of the building act (25/2025 Z. z.) finds neither word. The water act sorts wastewater (odpadová voda) into sewage (splašková), industrial and communal wastewater (§ 2 písm. j). Sewage is used water from dwellings and services. The act names human metabolism, household activities, bathrooms and catering facilities as sources (§ 2 písm. k). Toilet water and bath water therefore fall into the same legal class. Communal wastewater is water from settlements that contains mainly sewage (§ 2 písm. m).

The practical question for a house is which route the municipality and the water authority allow for all its sewage. The next sections set out that route.

When must a house connect to the public sewer?

The owner of a building or plot where wastewater arises must connect it to the public sewer if the municipality has one. The duty does not apply if the water authority gave the owner a permit for another way to handle wastewater (442/2002, § 23 ods. 2). The owner of a plot with a permitted holding tank must also connect. This applies if a connection is technically possible and does not need unreasonably high costs (§ 23 ods. 2). The sewer connection entry explains the connection itself.

Which routes does the water act allow without a sewer?

In an agglomeration above 2 000 population equivalents, communal wastewater must go through the public sewer only. One exception applies where a sewer brings no environmental benefit or costs disproportionately much. Then an individual system with the same level of protection may be used (364/2004, § 36 ods. 2). In smaller agglomerations without a sewer and in sparsely populated areas, the act allows individual systems besides the public sewer. Holding tanks are the main example, and small treatment plants are named for sparsely populated areas (§ 36 ods. 3). The permit for such a system has a fixed period. It is not extended where a public sewer is in operation (§ 36 ods. 4).

RouteWhat the act saysBasis
Public sewerThe owner must connect where the municipality has a sewer and no permit allows another way442/2002, § 23 ods. 2
Holding tank (žumpa)An individual system. The contents must go to a treatment plant by hauling, with proof for the last two years at most364/2004, § 36 ods. 2, 3, 4
Small treatment plantA set of structures that treats sewage before it goes to water or ground. It serves up to 50 population equivalents and has an inflow below 10 m3 per day§ 36 ods. 18

The water act also forbids discharging the contents of holding tanks into surface water and groundwater (§ 36 ods. 15). The sewerage act forbids emptying them into a sewer network. This applies where the public sewer includes a treatment plant that treats the water as its permit requires. The same ban covers wastewater from domestic treatment plants (442/2002, § 23 ods. 7).

What does the standard for domestic treatment plants cover?

The European standard EN 12566-3 covers packaged and site-assembled domestic wastewater treatment plants for up to 50 PT. The DIN catalogue entry says it applies to plants installed underground with no vehicle loads on the product. The plants can serve guest houses and businesses. The act sets details on categories, minimum efficiency and limit values in a government regulation (364/2004, § 36 ods. 19). This page did not read that regulation. The domestic wastewater treatment plant entry covers these plants.

What should a designer check on a rural plot?

These points follow from the rules above. They are design advice, not legal requirements.

  • Ask the municipality whether a public sewer exists or is planned, because that decides the duty to connect.
  • Ask the water authority which route it accepts for the plot. The act requires a permit for a holding tank or a small plant, and the permit has a fixed period.
  • Plan access for a hauling vehicle if the plot gets a holding tank.
  • Treat a separate toilet stream as a design choice. The acts read do not require it, and it still needs a legal route for the wastewater.

What are common misconceptions about blackwater?

The first is that Slovak law defines blackwater. It does not, and it treats all household sewage as one class. The second is that a holding tank cleans toilet water. It stores the water, and the act requires the contents to go to a treatment plant. The third is that kitchen water belongs with toilet water. In the Eawag source it is greywater.

Frequently asked questions

Is toilet wastewater the same as greywater?
No. Eawag defines blackwater as wastewater from toilets, with urine, faeces, flushwater and cleansing materials. Greywater is water from washing food, clothes and dishware and from bathing. Greywater may carry traces of excreta.
Does Slovak law regulate blackwater separately?
No. The water act, the sewerage act and the building act do not use the term. The water act treats sewage from toilets, bathrooms and kitchens as one class, splašková odpadová voda (364/2004, § 2 písm. k).
Can a house in a village with a sewer keep using a holding tank?
Usually not. The owner must connect to a public sewer where one exists, unless the water authority gave a permit for another way (442/2002, § 23 ods. 2). A plot with a permitted holding tank must also connect. This applies if a connection is technically possible and does not need unreasonably high costs.
What is a small wastewater treatment plant in Slovak law?
It is a set of structures that treats sewage before it goes to water or ground. It serves up to 50 population equivalents and has an inflow below 10 m3 per day (364/2004, § 36 ods. 18).
Is kitchen sink water blackwater?
No. The Eawag Compendium counts water from washing food and dishware as greywater. Slovak law does not distinguish the two, and calls both sewage.
Where may the contents of a holding tank go?
They must go to a wastewater treatment plant by hauling (364/2004, § 36 ods. 4). The act forbids discharging them into surface water or groundwater (§ 36 ods. 15).

Sources

  1. Fact Sheet "Blackwater" · Eawag, Swiss Federal Institute of Aquatic Science and Technology · Introduction and section on centralised solutions
  2. Compendium of Sanitation Systems and Technologies (Tilley, Lüthi, Morel, Zurbrügg, Schertenleib, 2008) · Eawag, Swiss Federal Institute of Aquatic Science and Technology, with WSSCC · Product descriptions (greywater, blackwater) and glossary
  3. Zákon č. 364/2004 Z. z. o vodách a o zmene zákona Slovenskej národnej rady č. 372/1990 Zb. o priestupkoch (vodný zákon) · Národná rada Slovenskej republiky, via Slov-Lex · § 2 písm. j, k, m; § 36 ods. 2, 3, 4, 15, 18, 19
  4. Zákon č. 442/2002 Z. z. o verejných vodovodoch a verejných kanalizáciách a o zmene a doplnení zákona č. 276/2001 Z. z. o regulácii v sieťových odvetviach · Slov-Lex · § 23 ods. 2, 7
  5. DIN EN 12566-3: Small wastewater treatment systems for up to 50 PT - Part 3: Packaged and/or site assembled domestic wastewater treatment plants (EN 12566-3:2016) · DIN Media (catalogue entry) · Catalogue entry, scope