Domestic wastewater treatment plant

A domestic wastewater treatment plant is a small unit that cleans the sewage of one house on its plot before the water leaves the site.

What is a domestic wastewater treatment plant?

A domestic wastewater treatment plant (domová čistiareň odpadových vôd) is a set of structures and equipment. It cleans the sewage of a house before the water goes to a stream or to the ground. The Water Act (364/2004 Z. z.) calls it a small wastewater treatment plant for up to 50 population equivalents. It also sets the inflow limit at below 10 m3 a day (§ 36 ods. 18). The unit of load is explained in population equivalent.

The Water Act names such a plant, like a watertight cesspit, as an individual system. A plant is an option where a public sewer would bring no environmental benefit or would cost too much. In a sparsely populated area outside a settlement, the act names small plants as an option too (§ 36 ods. 2 and 3).

When can a house use its own plant instead of a public sewer?

Where a public sewer is built, the owner of a building or plot must connect to it. The exception is an owner with a water authority permit for another way to handle wastewater (Sewerage Act 442/2002 Z. z., § 23 ods. 2). Government decree 269/2010 adds that a small plant for up to 50 population equivalents is not allowed where a public sewer already serves the area. The exception is a connection that is technically or economically unreasonable (§ 5a ods. 4).

The permit for building an individual system is issued for a fixed period only. Where a public sewer operates, the authority does not extend the permit after it ends (Water Act § 36 ods. 4). A plant chosen today can therefore have an end date. Ask the municipality early whether a public sewer is planned.

What permits does a plant need?

Discharge of wastewater into surface water or groundwater needs a permit for special water use from the water authority (orgán štátnej vodnej správy). The permit is a separate one under § 21 ods. 1 písm. c of the Water Act. The authority issues it for a fixed time. The maximum is 10 years for discharge into surface water and 6 years for discharge into groundwater. It may extend the permit if the conditions do not change (§ 21 ods. 4 and 5).

A plant is a water structure (§ 52 ods. 1 písm. e). The water authority permits a water structure only if the special water use permit has been issued. The water use permit comes before the decision on the building intent or together with it (§ 21 ods. 2, § 26 ods. 1). Sometimes the plant is part of a set of structures with the house, and another building office decides on the house. Then that office also decides on the plant. The water authority then takes part as an affected authority (§ 26 ods. 3).

For discharge into groundwater, the authority issues the permit only after a prior hydrogeological study by an authorised person. The study is not needed for a solitary dwelling that cannot connect to a public sewer. The dwelling must also stand outside the protection zones of water sources (§ 37 ods. 1 and 5). Discharge of sludge into surface water or groundwater is forbidden (§ 36 ods. 15).

What types and categories of small plants exist?

Decree 269/2010 distinguishes two types. An intensive plant is a factory-made product that follows a special procedure. An extensive plant is built on site with a pre-treatment step and a horizontal or vertical filter (§ 5a ods. 2). For intensive plants, the owner must show a declaration of performance under a technical standard. The decree names STN EN 12566-3 for this (annex 14b, part A.1).

The decree sorts plants into categories by the treatment they give. The water authority picks the category that the site needs. The table shows the maximum values for a spot sample in mg/l (annex 6, parts A.1.1 and A.2).

CategoryTreatment and typical useLimits for discharge to surface waterLimits for discharge to groundwater
IRemoves organic pollution. Minimum requirement for most sites.BOD5 70BOD5 40, suspended solids 40
IIAdds nitrification, where ammonia must be limited.BOD5 50, suspended solids 50, ammonia nitrogen 30BOD5 40, suspended solids 40, ammonia nitrogen 20
IIIAdds denitrification, for example in protected water management areas.COD 150, BOD5 40, suspended solids 40, ammonia nitrogen 20, total nitrogen 40COD 125, BOD5 40, suspended solids 40, ammonia nitrogen 15, total nitrogen 25
+PCategory III plus phosphorus removal.Category III plus total phosphorus 4Category III plus total phosphorus 4
+DCategory III plus disinfection, for example near bathing waters.Category III plus E. coli 150 and enterococci 100 CFU/100 mlCategory III plus E. coli 150 and enterococci 100 CFU/100 ml

The decree also sets minimum removal rates for CE-marked plants. For discharge to surface water, category I must remove 80 % of BOD5. Category II must remove 85 % of BOD5 and 75 % of ammonia nitrogen. For discharge to groundwater, the minimum removal is 85 % of COD and 90 % of BOD5. It is 50 % of total nitrogen and 40 % of total phosphorus (annex 14b, parts A.2.1 and A.2.2). The decree prefers discharge to surface water. If the treated water goes to the ground, the decree requires an infiltration structure and a sampling point (§ 5a ods. 7). See soakaway.

What does EN 12566-3 cover?

EN 12566-3 is the European standard for packaged and site-assembled domestic wastewater treatment plants for up to 50 inhabitants. It covers guest houses and small businesses. It applies to plants buried in the ground where no vehicle loads act on the product. The tanks are concrete, steel, PVC-U, PE, PP, GRP-UP or PDCPD. The current edition is 2016-12, and it replaces the 2013 edition. The standard applies where one manufacturer assembles the components and tests the plant as one system. It is a standard, not a law. The decree uses it as the technical basis for the declaration of performance.

How far must a plant stand from neighbouring houses?

The Sewerage Act sets a hygienic zone around a wastewater treatment plant. It is the minimum distance from the boundary of the plant site to the residential area in the municipal land-use plan (§ 19a ods. 1). The act lists 25 m for a fully enclosed process with air cleaning up to 200 m for open or surface-aerated plants. The distance doubles where the plant lies in the prevailing wind direction towards the residential area (§ 19a ods. 2 and 3).

For small plants with a capacity of up to 100 m3 a day, the act does not use this list. The hygienic zone then follows a technical standard or an equivalent specification. The act gives STN 75 6402 as an example (§ 19a ods. 5). The builder of a wastewater treatment plant submits a proposal for the hygienic zone to the proceedings on the building intent (§ 19a ods. 4). Ask the water authority and the designer which distance applies to your plant.

What must the owner do after the plant starts working?

The owner runs the plant under the water authority decision and the manufacturer instructions. Operation includes regular checks, maintenance, regular sludge removal and remote monitoring of the function. The owner keeps an operating log. It records maintenance, sampling with the test report, sludge removal, faults and the work done on them (decree 269/2010, § 5a ods. 10 and 13). An authorised person removes the sludge and delivers it to a treatment plant (§ 5a ods. 14).

The owner also has a technical inspection carried out by a certified inspection technician. The inspection is yearly, or every two years if the plant has remote monitoring. The owner sends the result to the water authority by 30 January of the next year. The owner removes defects within 60 days after the inspection (Water Act § 53 ods. 2). An owner of a plant permitted before 2022 must ask the water authority to align the permit with the current rules. The deadline is 31 December 2032 (§ 80f ods. 2).

Can a plant discharge into a public sewer?

Not always. Some public sewers include a treatment plant that cleans to the permit conditions. Into such a sewer network, the Sewerage Act forbids discharge of cesspit contents and effluent from domestic plants (§ 23 ods. 7). A septic tank and a holding tank are different options. A plant treats the water on site and discharges it under a permit. A holding tank stores the sewage and a hauler removes it. A sewer connection sends the sewage to a public treatment plant.

OptionWhere the sewage is cleanedWhat the Water Act and the Sewerage Act say
Domestic treatment plantOn the plot, then treated water goes to surface water or the groundSpecial water use permit and water structure permit for a fixed period. Technical inspection by a certified technician (Water Act § 21, § 26, § 36 ods. 4, § 53 ods. 2)
Holding tank (žumpa)At a treatment plant, after the hauler takes the contents awayWater Act § 36 ods. 2 and 4. The owner shows haulage records for the last two years on request. See holding tank
Public sewerAt the public treatment plantWritten connection contract with the sewer owner. Duty to connect where a sewer exists and no other permit applies (Sewerage Act § 23 ods. 1 and 2)

Frequently asked questions

Do I need a permit for a domestic wastewater treatment plant in Slovakia?
Yes. Discharge of treated water into surface water or groundwater needs a permit for special water use. The basis is § 21 of the Water Act (364/2004 Z. z.). The plant is also a water structure, so the water authority permits its building. The permit is issued for a fixed period only.
How long is the permit valid?
The Water Act sets a maximum of 10 years for discharge into surface water and 6 years for discharge into groundwater (§ 21 ods. 4). The authority may extend it if the conditions do not change. It does not extend the permit for an individual system where a public sewer has been built (§ 36 ods. 4).
What limits must the cleaned water meet?
Decree 269/2010 sets limits by category. For discharge to surface water, category I allows a maximum BOD5 of 70 mg/l in a spot sample. Category III allows 40 mg/l of BOD5 and 40 mg/l of total nitrogen. The water authority chooses the category for the site and may set stricter values.
Does the owner have to inspect the plant every year?
Yes, a certified inspection technician inspects a plant for up to 50 population equivalents once a year. If the plant has remote monitoring, the inspection is once every two years. The owner sends the result to the water authority by 30 January and removes defects within 60 days (Water Act § 53 ods. 2).
Can a plant discharge into the public sewer?
If the public sewer has a treatment plant, the Sewerage Act forbids discharge of cesspit contents into the network. It forbids effluent from domestic plants too (§ 23 ods. 7). Ask the sewer operator which rule applies to your connection point.
Is EN 12566-3 a legal requirement?
No, it is a European standard, not an act. Decree 269/2010 names STN EN 12566-3 as the basis for the declaration of performance that an intensive plant needs. Ask the authority and the supplier which edition and which proof they accept.

Sources

  1. Zákon č. 364/2004 Z. z. o vodách a o zmene zákona Slovenskej národnej rady č. 372/1990 Zb. o priestupkoch (vodný zákon) · Slov-Lex (Ministry of Justice of the Slovak Republic) · § 2 písm. k, m; § 21 ods. 1 až 5; § 26 ods. 1, 3, 4; § 36 ods. 1 až 4, 15, 18, 19; § 37 ods. 1, 5; § 52 ods. 1 písm. e; § 53 ods. 2; § 80f ods. 2, 3
  2. Zákon č. 442/2002 Z. z. o verejných vodovodoch a verejných kanalizáciách · Slov-Lex (Ministry of Justice of the Slovak Republic) · § 19a ods. 1 až 5; § 23 ods. 2, 7
  3. Nariadenie vlády Slovenskej republiky č. 269/2010 Z. z., ktorým sa ustanovujú požiadavky na dosiahnutie dobrého stavu vôd · Slov-Lex (Ministry of Justice of the Slovak Republic) · § 5a ods. 1 až 14; annex 6 parts A.1.1 and A.2; annex 14b parts A.1, A.2.1, A.2.2
  4. DIN EN 12566-3:2016-12 Small wastewater treatment systems for up to 50 PT - Part 3: Packaged and/or site assembled domestic wastewater treatment plants · DIN Media · Scope (catalogue entry)