Septic tank

A septic tank (septik) is an underground chamber that settles solids from household sewage and partly breaks them down before the liquid leaves.

What is a septic tank?

A septic tank (septik) is an underground chamber through which household sewage flows for basic treatment. The BSI catalogue entry for the European standard BS EN 12566-1:2016 describes it this way. The standard covers prefabricated septic tanks for partial treatment of domestic wastewater for up to 50 inhabitants. It excludes tanks that receive only grey water and tanks built on site. The tank is not a full treatment plant. The liquid it releases still carries pollutants.

How does a septic tank work?

Inside the tank, a layer of solids (sludge) forms at the bottom, and a scum layer floats on the surface. Clearer liquid sits between them. The Virginia Cooperative Extension publication On-Site Sewage Treatment Alternatives (2023) says the tank removes solids and particles from raw sewage by gravity separation. Some decomposition by anaerobic microorganisms happens in the oxygen-poor tank, but the same publication says this has only a minor effect.

StageWhat happensWhat it does not do
Settling in the tankSolids sink and form sludge. Light material floats as scum.It does not remove the pollution that stays in the liquid.
Anaerobic breakdown in the tankMicroorganisms break down part of the organic matter without oxygen.The effect is only minor, according to the extension publication.
Treatment in the soilThe liquid reaches an absorption field. Secondary treatment takes place in the soil there.The tank does not do this step.
Cleaning outA qualified contractor removes the solids from time to time.The tank cannot do this itself. Inadequate cleaning is the most common cause of failure.

Where does a septic tank fit in the Slovak water rules?

The Water Act (364/2004 Z. z.), the Sewerage Act (442/2002 Z. z.) and decree 269/2010 do not name septic tanks. The Water Act requires treatment of municipal wastewater before it goes to surface water or groundwater. The treatment must reach limit values that depend on the size of the source (§ 36 ods. 1). For individual systems it names watertight cesspits and small wastewater treatment plants (§ 36 ods. 2 and 3). The water authority justifies the system in the permit.

A small plant is a plant for up to 50 population equivalents with an inflow below 10 m3 a day (§ 36 ods. 18). A septic tank gives only the first step of treatment. So ask the water authority which category your project falls into before you design the outflow.

SystemWhat the law saysWhat it means for the design
Watertight cesspit (žumpa)An individual system. The owner has the contents hauled to a treatment plant. The hauler gives a record of each haul (§ 36 ods. 2 and 4).Keep the haul records. On request, the owner shows records for the last two years.
Small treatment plant, up to 50 population equivalentsAn individual system with its own rules. A certified technician inspects it every year, or every two years with remote monitoring (§ 53 ods. 2).Count the population equivalents and the daily inflow before you choose it.
Septic tank with infiltrationNot named in the acts or in the decree. The water authority decides in the permit.Confirm with the water authority how it classes your system.

The Water Act also forbids discharge of cesspit contents and treatment plant sludge into surface water or groundwater (§ 36 ods. 15). Where a public sewer has a treatment plant, the Sewerage Act forbids discharge of cesspit contents into the sewer network. It forbids effluent from domestic plants too (§ 23 ods. 7).

Must a house with a septic tank connect to a public sewer?

The owner of a building or plot with wastewater must connect to a public sewer if the municipality has one. The exception is an owner with a water authority permit for another way to handle wastewater. An owner whose plot has a permitted cesspit must also connect. The condition is that connection is technically possible and does not cost too much (Sewerage Act § 23 ods. 2). The owner signs a connection contract with the sewer owner.

The permit for an individual system is issued for a fixed period. Where a public sewer operates, the authority does not extend the permit after it ends (Water Act § 36 ods. 4). A septic tank can therefore be a temporary solution. See sewer connection.

How is a septic tank different from a holding tank?

A holding tank (žumpa) is a watertight cesspit. It stores the wastewater, and the owner has it hauled to a treatment plant. A septic tank does a first stage of treatment and releases the liquid to a further step. The Water Act treats a watertight cesspit and a small plant as different individual systems. The septic tank is neither of them by name.

How is a septic tank different from a domestic wastewater treatment plant?

A septic tank gives partial treatment. A domestic wastewater treatment plant cleans to the limit values of decree 269/2010. The BSI scope for BS EN 12566-1 covers only the prefabricated tank for partial treatment. Complete packaged plants fall under other parts of the series, for example EN 12566-3.

Treated water from a plant can go to a soakaway or to surface water. The decree prefers surface water. It requires an infiltration structure and a sampling point if the water goes to the ground (§ 5a ods. 7). The soil does the secondary treatment after a septic tank, so a soil test matters as much as the tank.

What are common misconceptions about septic tanks?

The most common mistake is to think the tank cleans the water. The extension publication says the anaerobic process in the tank has only a minor effect. The soil does the secondary treatment, and a blocked or waterlogged field fails whatever the tank does.

A second misconception is that a tank needs no attention. The same publication names inadequate cleaning of the tank and filter as the most common cause of failure of a conventional septic system. Solids then move into the absorption lines and clog them.

Frequently asked questions

What is a septic tank?
A septic tank is an underground chamber that receives household sewage. Solids settle in it and part of the organic matter breaks down. It does only the first step of treatment. The liquid that leaves it needs further treatment, usually in the soil.
Is a septic tank the same as a žumpa?
No. A žumpa is a watertight cesspit. It stores wastewater until a hauler takes it to a treatment plant (Water Act § 36 ods. 2 and 4). A septic tank releases the settled liquid to a further step.
Does a septic tank fully clean wastewater?
No. The Virginia Cooperative Extension says the tank removes solids and that anaerobic breakdown in it has only a minor effect. Most of the remaining treatment happens in the soil of the absorption field.
Does the Water Act allow a septic tank?
The Water Act, the Sewerage Act and decree 269/2010 do not name septic tanks. The Water Act names watertight cesspits and small treatment plants as individual systems. Ask the water authority how it classes a septic tank with infiltration.
Must I connect to the public sewer if a septic tank is already permitted?
If the plot has a permitted cesspit, the owner must connect to the public sewer. The condition is that connection is technically possible and does not cost too much (Sewerage Act § 23 ods. 2). The permit for an individual system is for a fixed period.
How often must a septic tank be emptied?
The extension publication gives no fixed interval. It says a qualified contractor must remove the solids from time to time. It names inadequate cleaning as the most common cause of failure. Ask the permit authority which schedule applies to your site.

Sources

  1. Zákon č. 364/2004 Z. z. o vodách a o zmene zákona Slovenskej národnej rady č. 372/1990 Zb. o priestupkoch (vodný zákon) · Slov-Lex (Ministry of Justice of the Slovak Republic) · § 36 ods. 1 až 4, 15, 18; § 53 ods. 2
  2. Zákon č. 442/2002 Z. z. o verejných vodovodoch a verejných kanalizáciách · Slov-Lex (Ministry of Justice of the Slovak Republic) · § 23 ods. 2, 7
  3. Nariadenie vlády Slovenskej republiky č. 269/2010 Z. z., ktorým sa ustanovujú požiadavky na dosiahnutie dobrého stavu vôd · Slov-Lex (Ministry of Justice of the Slovak Republic) · § 5a ods. 7
  4. BS EN 12566-1:2016 Small wastewater treatment systems for up to 50 PT. Prefabricated septic tanks · BSI Knowledge · Scope (catalogue entry)
  5. On-Site Sewage Treatment Alternatives (publication 448-407) · Virginia Cooperative Extension, Virginia Tech · Primary treatment, secondary treatment in soils, causes of failure