Overflow pool

An overflow pool is a pool whose water runs over the rim into a channel and a balance tank, and a pump returns it.

An overflow pool (prelivový bazén) is a pool whose water spills over the rim into a channel and returns by pump. The European swimming pool association EUSA describes it as one of two ways to take water off a pool surface. The other way is a pool skimmer. Slovak law does not name the overflow type, so the size and depth rules for any garden swimming pool apply. This page covers the mechanism, the balance tank, the edge and channel values, and the permit route.

What is an overflow pool and how does it differ from a skimmer pool?

The EUSA technical paper on domestic pool circulation (2010) names two ways to remove water from the surface. In an overflow pool a continuous channel runs around the top of the pool wall. The channel sits at the same level as the pool water and the surrounding bather area. In a skimmer pool, several outlets sit in the top of the wall, and the water stands about 150 to 200 mm below the top.

The paper says most pollution in pool water sits in the top 75 mm, so efficient filtration needs good surface removal. It gives the share of the circulation flow taken through skimmers in a skimmer pool as 70 %, and the rest through low-level outlets. For an overflow pool it gives a ratio of 75 to 25.

The paper describes a channel around the whole perimeter. It does not cover designs where water spills over one edge only. If the design has one overflow edge, ask the supplier which technical rules the supplier follows.

How does the balance tank work?

Water can flow into the channel without a break only if the system holds more water than the pool basin alone. The extra water is usually held in a balance tank (vyrovnávacia nádrž). The circulation pump takes water from the tank and returns it to the pool, so the pool overflows. The water runs from the channel back to the tank under gravity.

The EUSA paper gives these design points for the tank.

  • The tank is most conveniently close to the pool, but it can be remote.
  • The designer sizes the pipes between the channel and the tank so that water flows without restriction under gravity, at about 0.45 m/s.
  • The tank is large enough to accept the bathing design load entering the pool at once, any wave surge and a safety margin.
  • The tank has an overflow that discharges where people can see it, so operators notice a problem.
  • The tank has access hatches for cleaning. Any national rules on work in confined spaces also apply.
  • The inside finish is easy to clean, so that solids and bacteria do not build up.

The paper gives no formula for the tank volume. The pool designer calculates it for the actual pool, its bather load and its pump.

How exact must the edge and the channel be?

The EUSA paper gives values for the edge and the channel. They are association guidance for domestic pools, and the paper names no Slovak rule for them.

ItemEUSA value
Overflow while the pool is in useOver the whole perimeter
Overflow while the pool is not in useOver 90 % of the perimeter
Finish of the top edgeNo more than 2 mm deviation, plus or minus, over 25 m
Channel capacityA volume equal to 50 mm depth of pool water
Gaps in the channel gridNo more than 8 mm, to prevent entrapment
Grid removalEasy for maintenance staff, not easy for pool owners

The edge value shows why the edge detail needs a precise builder. A small height error along the rim changes where the water leaves the pool.

What extra parts does an overflow pool need compared with a skimmer pool?

An overflow pool needs a channel with a grid around the pool, a balance tank, and pipes between them. A skimmer pool needs skimmer outlets in the wall and low-level outlets. The table compares what the EUSA paper says about each.

FeatureOverflow poolSkimmer pool
Surface water removalContinuous channel around the top of the wallOutlets in the top of the wall
Water levelAt the level of the channel and the bather areaAbout 150 to 200 mm below the top of the wall
Extra water volumeNeeded, usually in a balance tankNot described in the paper
Flow splitRatio of 75 to 2570 % through skimmers, the rest through low-level outlets
Edge finish2 mm over 25 m, plus or minusNot given in the paper

This page gives no price difference. The sources read give no dated price for either type. Ask each supplier for a quote for both versions of the same pool.

How does Slovak building law treat an overflow pool?

Act 25/2025 Z. z. (Stavebný zákon, building act) does not name the overflow type. Its underground group of minor structures (drobné stavby) lists pools with cellars, septic tanks and retention tanks. The group covers up to 25 m2 of built-up area and 3 m of depth (§ 2 ods. 4 písm. b). The word najmä means "in particular", so the list is a guide. The size, depth and position of the pool decide its class, not its edge type.

The general rule is that every structure needs a decision on the building intent unless the act says otherwise (§ 18 ods. 2). Until 31 December 2026, § 18 ods. 3 requires notification (ohlásenie) for the minor structures in § 2 ods. 4 písm. a to c. An in-ground pool within the limits belongs to that group.

From 1 January 2027, amendment 243/2026 Z. z. changes this (Art. I, bod 59). It removes the words that tie § 18 ods. 3 to those groups. Notification then depends on the conditions in § 18 ods. 3 písm. a to i, and one of them is the building of an underground structure (písm. e). The same amendment adds a new § 18 ods. 4 písm. h. It names an underground structure made by placing a prefabricated product, up to 50 m2 of built-up area and 3 m of depth. Ask the building office whether a prefabricated pool shell counts.

The act makes technical and operating equipment, without which a free-standing structure would be incomplete, a part of that structure (§ 2 ods. 2). It does not say whether a balance tank counts toward the 25 m2. Ask the building office before you fix the dimensions.

Water quality is a separate question. Decree 308/2012 Z. z. sets requirements for natural and artificial bathing sites (§ 1). Section 3 ods. 4 applies the artificial-site requirements, as appropriate, to pools in facilities that serve the public. It names accommodation, body-care, health and social-service facilities as examples. It does not mention private or family pools.

What should an owner check before choosing an overflow pool?

Settle these points with the pool designer early, because each one changes the layout.

  • Which edge design the supplier means: a channel around the whole perimeter, or one overflow edge.
  • Where the balance tank sits, and how the pipes reach it by gravity.
  • How the designer calculated the tank volume for the bather load and the wave surge.
  • Where the tank overflow discharges, and how people reach the tank for cleaning.
  • Who checks the edge level, and the channel grid detail.
  • Which permit route applies on the date of your application, and whether the tank counts toward the pool limits.

Frequently asked questions

What makes an overflow pool different from a skimmer pool?
In an overflow pool a continuous channel around the top of the wall takes the surface water. In a skimmer pool, outlets in the wall take it, and the water stands about 150 to 200 mm below the top. The EUSA paper describes both.
Why does an overflow pool need a balance tank?
The water must flow into the channel without a break. That works only if the system holds more water than the pool basin alone. The balance tank holds the extra water, and the pump returns it to the pool.
How exact must the edge of an overflow pool be?
The EUSA paper gives a deviation of no more than 2 mm, plus or minus, over 25 m for the finish of the top edge. It is association guidance, not Slovak law.
Does the Slovak building act name overflow pools?
No. Act 25/2025 Z. z. lists pools among underground minor structures up to 25 m2 and 3 m depth. Until 31 December 2026, notification is required for that group. From 1 January 2027, amendment 243/2026 changes the notification rule in § 18 ods. 3.
Is a private overflow pool covered by the bathing water decree?
On the face of decree 308/2012 Z. z. it is not, because the text does not mention private or family pools. The decree applies as appropriate to pools in facilities that serve the public.
Does an overflow pool cost more than a skimmer pool?
The sources read give no dated price. An overflow pool has extra parts: a channel with a grid, a balance tank and the pipes between them. Ask for a quote for both versions of the same pool.

Sources

  1. Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Národná rada Slovenskej republiky, Slov-Lex · § 2 ods. 2 and ods. 4 písm. b; § 18 ods. 2 and 3
  2. Zákon č. 243/2026 Z. z., ktorým sa mení a dopĺňa zákon č. 25/2025 Z. z. Stavebný zákon · Národná rada Slovenskej republiky, Slov-Lex · Čl. I bod 59, bod 62 (§ 18 ods. 3 and 4); Čl. XV (effect)
  3. Vyhláška Ministerstva zdravotníctva SR č. 308/2012 Z. z. o požiadavkách na kvalitu vody, kontrolu kvality vody a o požiadavkách na prevádzku, vybavenie prevádzkových plôch, priestorov a zariadení na prírodnom kúpalisku a na umelom kúpalisku · Ministerstvo zdravotníctva SR, via Slov-Lex · § 1; § 3 ods. 3 and 4
  4. Technical paper: Circulation systems for domestic swimming pools · EUSA, European Swimming Pool and Spa Association (page footer dated 2010) · Paragraphs 11 to 17 (surface water removal, overflow systems, balance tank, edge, channel)