Natural swimming pond
A natural swimming pond is a bathing pond that plants and soil filters clean in a regeneration zone instead of chlorine.
A natural swimming pond is a bathing pond that uses biological processes instead of chlorine to clean its water. The Bavarian State Institute for Viticulture and Horticulture (LWG) quotes the definition of the German landscape research society FLL. It calls the pond an artificial ecosystem that copies and improves the conditions of natural waters. This page covers space, upkeep, water quality and the Slovak rules, and it marks which figures come from public ponds in Bavaria.
What is a natural swimming pond?
A natural swimming pond, called a Schwimmteich in German, divides into three areas: a use area where people bathe, a treatment area, and a technical area. The treatment area holds planted soil filters, regeneration ponds, fine filters and settling basins. Pumps and skimmers can move the water between the areas. The FLL publishes recommendations for private swimming and bathing ponds, and the DIN listing shows the 2017 edition as current.
How does the water get cleaned without chlorine?
The LWG names the self-cleaning steps: organic material settles and mineralises, minerals bind into the sludge at the pond bottom, and zooplankton in the water removes germs. Extra biotechnical parts support these steps. The LWG gives the planted soil filter a central role, because it must clean the used bathing water under near-natural conditions with little energy and a very high buffer capacity.
The LWG notes that a swimming pond has much less buffer capacity and self-cleaning power than a natural water body, because many bathers use a small volume of water. For the filter substrate, manufacturers use open-pored mineral mixes and natural zeolites. Washed sand can match the cleaning of prepared substrates in LWG tests. Table 1 shows how the three areas divide the work.
| Area | What happens there | What the LWG advises |
|---|---|---|
| Use area | People bathe and bring in most of the load | Keep out surface water with an edge, a capillary barrier or drainage, and fit a fine or pre-filter |
| Treatment area | Settling, filtering and plant uptake of nutrients | Use washed substrates without phosphate, add inspection openings, and harvest the plants in late summer |
| Technical area | Installation room with pumps and flow control | Write a maintenance plan and train the operator |
How is it different from a conventional pool or a garden pond?
The LWG says a swimming pond treats the water biologically, where a conventional outdoor pool uses chemical treatment. It also says building and operating a swimming pond places much higher demands on design, water quality and upkeep than an ordinary ornamental or garden pond. A swimming pond is therefore a technical structure and not a pond with a few water plants.
Other planted water systems, such as a rain garden or greywater recycling, are separate terms with a different purpose. For a pool that uses chlorine, see garden swimming pool.
How much area does a natural swimming pond need?
The LWG says the treatment area should be at least as large as the swimming area, depending on the technical design. For public ponds it gives an orientation value of 5 to 15 m2 of total area per m2 of use area. Table 2 lists the figures. They come from public ponds in Bavaria, so they show an order of magnitude and are not a rule for a private garden.
| Design point | Figure given by the LWG |
|---|---|
| Treatment area compared with swimming area | At least the same size, depending on the technical design |
| Total area of a public pond | Orientation value of 5 to 15 m2 per m2 of use area |
| Phosphorus brought in by each bather | About 0.1 g per bather per day |
| Pseudomonas aeruginosa | Appears more often above 23 °C, whatever the system |
Where do natural swimming ponds fall short?
The LWG is direct about the weak points. Its authors write that uncontrolled algae growth and occasional germ contamination are still not fully solved, even with more advanced technology. At peak use the water is not always clean and nearly free of algae and germs. The LWG therefore recommends regular tests.
Phosphate is the main nutrient problem. The LWG states that no substrate used in Bavarian ponds could remove large amounts of phosphate from the used bathing water. Algae removal therefore stays a maintenance task. Each bather brings in about 0.1 g of phosphorus per day. Leaves, dust, animal droppings and runoff from the surroundings add nutrients, and the LWG advises testing the fill water for phosphate during planning.
What does maintenance involve, and what does it cost?
Maintenance never stops. The LWG lists fishing out algae, vacuuming sludge from the pond bottom, and cleaning pumps, skimmers, shafts and filters. It also lists mowing the treatment area and the planting around it. A poorly cleaned filter sends fine sludge into the treatment area, which lowers its buffer capacity. The result can be more algae, more germs and, in the worst case, a temporary closure. When the system starts up again, full cleaning performance can take three to four weeks to return.
On cost, the LWG data come from public ponds and date from 2005 and 2006, so this page prints no euro figures. The LWG reported that upkeep of natural baths then came to about 10% of the operating cost of conventional baths. It expected the construction costs of both types to move closer together and the higher care demands to raise upkeep. It named energy savings as the lasting financial advantage.
Is a natural swimming pond chemical-free?
Not in a meaningful sense. The LWG states that water quality depends on the chemical composition of the fill, treatment and bathing water, and on how outside influences change it. Building materials and substrates in contact with the water can change the pH and the lime-carbon dioxide balance. The LWG advises durable materials that do not change the water quality and do not feed algae.
Which rules apply to a natural swimming pond in Slovakia?
Decree 308/2012 Z. z. of the Ministry of Health defines a biokúpalisko as an artificial bathing site with a natural water cleaning system, where the water is separate from groundwater and surface water. Annex 2 sets limit values and tests every 14 days in the bathing season, as Table 3 shows. It also says that fish, frogs and reptiles must not live in a biokúpalisko. The decree does not mention private or family ponds. Ask the public health office whether it applies to a private pond.
| Indicator | Limit value, decree 308/2012 Z. z., annex 2, table 2 |
|---|---|
| Escherichia coli | 100 colony-forming units per 100 ml |
| Intestinal enterococci | 50 colony-forming units per 100 ml |
| Pseudomonas aeruginosa | 10 colony-forming units per 100 ml |
| How often | Before the season and once per 14 days during it |
For construction, act 25/2025 Z. z. lists pools among underground minor structures up to 25 m2 of built-up area and 3 m depth (§ 2 ods. 4 písm. b, text valid from 1 November 2025 to 31 December 2026). It does not name swimming ponds. Ask the building office before any excavation which route applies.
For design, the Umweltbundesamt notes that the German pool water standard DIN 19643 does not apply to small bathing ponds or swimming ponds with biological treatment. The FLL rules cover them instead.
Frequently asked questions
- Is a natural swimming pond safe to swim in?
- The LWG aims for risk-free bathing through biological treatment. It also reports that uncontrolled algae growth and occasional germ contamination are not fully solved in public ponds. Plan regular water tests and ask for the test plan before you commit.
- How big does a natural swimming pond need to be?
- The LWG says the treatment area should be at least as large as the swimming area. For public ponds it gives 5 to 15 m2 of total area per m2 of use area. That figure comes from public ponds in Bavaria, so it is not a private rule.
- Does a natural swimming pond need chlorine?
- No. The treatment is biological, using plants, filters and zooplankton. The water is still a chemical system, so it needs tests for nutrients and germs. Slovak decree 308/2012 Z. z. sets limits for germs in a biokúpalisko.
- Why does a natural pond get algae?
- Algae feed on nutrients. The LWG names phosphate from bathers, runoff, leaves, dust, animal droppings and fill water. No substrate used in Bavarian ponds removed large amounts of phosphate, so algae removal stays a maintenance task.
- Can I build a natural swimming pond on a family house plot?
- Act 25/2025 Z. z. names pools among small underground structures but does not name swimming ponds. The pond also needs a treatment area at least as large as the swimming area. Ask the building office which route applies before excavation.
- Which Slovak water limits apply to a swimming pond?
- Decree 308/2012 Z. z., annex 2, gives limits for a biokúpalisko: 100 E. coli, 50 enterococci and 10 Pseudomonas aeruginosa per 100 ml, tested every 14 days. The decree does not mention private ponds, so ask the public health office.
Sources
- Schwimmteiche: Ungetrübter Badespaß (leaflet, 1st edition 2008) · Bayerische Landesanstalt für Weinbau und Gartenbau (LWG) · Whole leaflet, 6 pages
- Vyhláška Ministerstva zdravotníctva Slovenskej republiky č. 308/2012 Z. z. o požiadavkách na kvalitu vody, kontrolu kvality vody a o požiadavkách na prevádzku, vybavenie prevádzkových plôch, priestorov a zariadení na prírodnom kúpalisku a na umelom kúpalisku · Ministerstvo zdravotníctva SR, via Slov-Lex · § 2 písm. d, § 3 ods. 2 and 7, annex 2
- Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Národná rada Slovenskej republiky, Slov-Lex · § 2 ods. 4 písm. b
- FLL Badeteichanlagen, privat (Richtlinien für Planung, Bau und Instandhaltung von privaten Schwimm- und Badeteichen) · DIN Media / DIN, listing for FLL technical rule · Catalogue page
- Regelwerke und Normen (Schwimmen und Baden) · Umweltbundesamt (German Federal Environment Agency) · Page updated 23 July 2013