Garden swimming pool

A garden swimming pool is a pool on a private plot. Act 25/2025 counts it as a minor structure only underground, up to 25 m² and 3 m deep.

A garden swimming pool (záhradný bazén) is a pool built on a private plot for swimming, bathing or relaxation. For a planner the term means two things: a type of construction, and a structure that the Slovak Building Act sorts by size. The act treats a pool as a minor structure (drobná stavba) only while it stays within fixed limits. This page covers the pool types, the technology room, water and winter care, and the permit route under act 25/2025 Z. z. The act applies from 1 April 2025. The text below follows its consolidated version valid from 1 November 2025 to 31 December 2026. The permit section lists the changes from 1 January 2027.

What is a garden swimming pool under Slovak building law?

Act 25/2025 Z. z. (Stavebný zákon) names pools in one place. The group of underground minor structures lists cellars, septic tanks, retention tanks and pools (§ 2 ods. 4 písm. b). The list is introduced by the word najmä, meaning "in particular", so it is a guide and not a closed catalogue. The act does not give pools their own procedure. A pool is judged like any other structure.

A structure is a building construction that is firmly joined to the ground, or whose placement needs a prepared base (§ 2 ods. 1). The act counts as a firm connection a solid foundation, anchoring with piles, ground screws or cables, a connection to utility networks, and placement underground. Within the limits of the underground group, a pool is a minor structure. Above those limits it falls outside the category and follows the general route. Settle the group with the building office early.

Which pool types are built on a garden plot?

Three construction approaches cover most garden pools. They differ in how the basin is made and where it sits. This list describes them and is not a catalogue of products.

  • In-ground concrete pool. The basin is cast on site from reinforced concrete and finished with tiles, mosaic or a liner. It sits in the ground, normally below the surrounding level.
  • Prefab shell pool. A factory-made shell of steel, polymer or composite is lowered into an excavation on a prepared base. The rim sits at or near the terrain.
  • Above-ground pool. A frame or wall stands on the surface, usually with a liner. Some are partly sunk.

Design advice: ask the pool designer how ground water, soil pressure and the preparation of the base affect each type on your plot. The legal point is the class. The act names pools only in the underground group. For an above-ground pool, the definition of a structure in § 2 ods. 1 decides, and the act sets no separate limit for it.

How does the act set size and depth limits for a pool?

Section 2 ods. 4 of the act sorts minor structures into groups. Two groups matter for a garden pool. Each group has a limit on built-up area (zastavaná plocha) and a limit on height or depth.

Group in § 2 ods. 4LimitExamples named in the act
Písm. a: above-ground structures fixed to the groundBuilt-up area up to 50 m², height up to 5 mSheds, carports, saunas, garages and similar. Pools are not named.
Písm. b: underground structuresBuilt-up area up to 25 m², depth up to 3 mCellars, septic tanks, retention tanks, pools

The 25 m² figure applies to the underground group only. Settle the footprint and depth with the building office before you fix the dimensions. A small change in basin size can move a pool out of the minor category.

Does a garden pool need a notification or a decision?

The general rule is that every structure needs a decision on building intent unless the act says otherwise (§ 18 ods. 2). The act then makes an exception for minor structures. Notification is always required for the above-ground, underground and forestry groups in § 2 ods. 4 písm. a to c (§ 18 ods. 3). An in-ground pool within the underground limits therefore needs a minor structure notification, which is the lighter route. This applies until 31 December 2026.

The table sums up the routes under the version in force until 31 December 2026.

PoolRouteProvision
In-ground, within 25 m² and 3 m depthNotification, always§ 2 ods. 4 písm. b, § 18 ods. 3
In-ground, above those limitsDecision on building intent§ 18 ods. 2
Above-groundDepends on whether it is a structure and on its group, so ask the building office§ 2 ods. 1 and 4
Notified pool that could affect the rights of third personsThe office may require a decision on building intent§ 63 ods. 5

A pool that exceeds the limits, or cannot be placed in a group, follows the longer route of building intent proceedings. The building office can also tell the builder that a notified structure may go ahead only on a decision on building intent. It does so if the structure could affect the rights of third persons or if conditions must be set (§ 63 ods. 5). The act's list of works that need neither a decision nor a notification (§ 18 ods. 5) does not name pools, so do not assume that a new pool falls under it.

Amending act 243/2026 Z. z. changes the rules from 1 January 2027 (Čl. I and Čl. XV). Point 59 of Čl. I deletes the words that make notification automatic for the three groups of § 2 ods. 4 písm. a to c. The conditions of § 18 ods. 3 decide instead, and one of them is the building of an underground structure (písm. e). The amendment lists no change to the 25 m² and 3 m limits. The same amendment adds to § 60 a rule on unpermitted structures built between 1 April 2025 and 31 December 2026 without a verified project. An office may approve afterwards a minor structure that is an accessory of a main building, and the list of examples in § 60 ods. 4 písm. b names a garage, a farm building, a shelter, a store, a pool and a retaining wall. This is an exception for works already built and is not a way to plan a pool without a project.

What does the technology room need to hold?

The technology room is the place where the pump, the filter, the heater or heat pump connection, the disinfection dosing and the control equipment sit. It is usually a small enclosure beside the basin. Design advice: give access to every unit for cleaning and service. Keep chemicals apart from the electrical equipment. Carry the water from backwashing to a drain. Ask the designer how the room is ventilated.

Whether the technology room is a separate structure or part of the pool is a question for the building office. The act makes technical and operating equipment, without which a free-standing structure would be incomplete, a part of that structure (§ 2 ods. 2). It does not say how that applies to a pool technology room. Ask whether its built-up area counts toward the pool limit.

How are water quality and winter care handled?

The Ministry of Health decree 308/2012 Z. z. sets water-quality requirements, checks and operating rules for natural and artificial public bathing sites (§ 1). Its annex 3 gives values for artificial sites. Section 3 ods. 4 applies those requirements, with the necessary changes, to pools in facilities that serve the public. The decree does not mention private or family pools. Do not copy its values into a garden pool and call them a legal standard.

For day-to-day care, ask the pool supplier for a written operating plan. It should cover circulation, filtration, skimming and a cover. For winter, ask the designer to choose one of three options for your basin. The options are to keep the pool running, to lower the water level and cover it, or to drain it. For an in-ground basin, also ask the designer whether ground water can lift an empty basin and how the basin is anchored.

How is a garden pool different from a minor structure?

A minor structure is the whole category: sheds, fences, cellars, connections and others, sorted by size. A garden pool is one member of that category, and its size limits are the ones that apply to underground structures. This page covers the pool itself. The category page explains the rest of the list. A garden house is a separate type. Earthwork around a pool can fall under terrain modification, which has its own page.

Frequently asked questions

Is every garden swimming pool a minor structure in Slovakia?
No. Act 25/2025 Z. z. names pools in the underground group of § 2 ods. 4 písm. b, which has a limit of 25 m² built-up area and 3 m depth. The act does not name a pool in the above-ground group, so the building office classifies an above-ground pool. A pool above the limits is not a minor structure and follows the longer route.
Does the Slovak decree on bathing water apply to my family pool?
The decree does not mention private pools. Decree 308/2012 Z. z. covers natural and artificial public bathing sites. Section 3 ods. 4 applies its artificial-site requirements, with the necessary changes, to pools in facilities that serve the public. Do not assume that its values bind a private garden pool.
Does an in-ground garden pool need a notification?
Yes, if it stays within the underground limits. Until 31 December 2026 notification is always required for the groups in § 2 ods. 4 písm. a to c (§ 18 ods. 3). From 1 January 2027 the conditions of § 18 ods. 3 decide, and písm. e covers the building of an underground structure. The building office can still tell you that the pool needs a decision on building intent (§ 63 ods. 5).
What changes for garden pools from 2027?
Amending act 243/2026 Z. z. changes § 18 ods. 3 from 1 January 2027. Notification is no longer automatic for the three groups, so the conditions of § 18 ods. 3 decide, and one of them is the building of an underground structure. The amendment lists no change to the 25 m² and 3 m limits. It also lets an office approve some unpermitted structures afterwards, and its list names a pool.
Which pool type is simplest to build on a small garden?
Ask the pool designer. The three common types are an in-ground concrete pool, a prefab shell pool and an above-ground pool. An above-ground pool needs the least excavation. The act does not name it in a size group, so ask the building office how it classifies the pool before you buy.
Does a pool technology room count toward the size limit?
The act does not say. Section 2 ods. 2 makes technical and operating equipment without which a free-standing structure would be incomplete a part of that structure. Ask the building office whether your technology room is part of the pool or a structure of its own.

Sources

  1. Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Národná rada Slovenskej republiky, Slov-Lex · § 2 ods. 1, 2 and 4 písm. a and b, § 18 ods. 2, 3 and 5, § 63 ods. 5
  2. Vyhláška Ministerstva zdravotníctva SR č. 308/2012 Z. z. o požiadavkách na kvalitu vody na kúpalisku · Ministerstvo zdravotníctva SR, via Slov-Lex · § 1, § 3 ods. 3 and 4, annex 3
  3. Zákon č. 243/2026 Z. z., ktorým sa mení a dopĺňa zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Národná rada Slovenskej republiky, Slov-Lex · Čl. I body 58, 59, 129 (§ 18 ods. 2 and 3, § 60 ods. 4 písm. b), Čl. XV