Terrain modification
A terrain modification is earthwork that changes a site's relief, subsoil or drainage, which Slovak act 25/2025 treats as building work.
What is a terrain modification under act 25/2025?
A terrain modification (terénna úprava) is earthwork. It changes the shape of the land, the physical properties of the subsoil, or the way surface water drains. The Slovak Building Act, Stavebný zákon (act 25/2025 Z. z.), defines the term in § 2 ods. 9 písm. c). The act applies from 1 April 2025. Under the act, a terrain modification is one kind of building alteration (stavebná úprava). A building alteration on a plot falls under the general rule of § 18 ods. 2, which asks for a decision on building intent unless the act says otherwise.
The definition lists several parts. The works change the relief, change the physical properties of the subsoil or affect drainage. They are not part of the building's own construction method, and they permanently change the plot. The definition also names works in the public interest. These works protect, create or restore landscape, or plant vegetation for erosion control, water retention or recreation. The act's examples are terrain modification itself, land improvement (meliorácie), extraction works and other earthworks. The wording joins these parts loosely. Whether a given regrading job meets all of them is a question for the building office. This article does not settle it for any single site.
Which works does the act count as earthwork?
The act treats earthworks as construction work. Under § 27 ods. 1, stavebné práce (building works) include zemné práce (earthworks), together with demolition, craft work and assembly. The act uses the term for work needed to build a structure, change it, maintain it or demolish it. A terrain modification is earthwork in this sense, because it is a building alteration.
Levelling a sloping garden so that water runs away from the house can be a terrain modification. Classify the job before you choose a procedure.
Which procedure applies to a terrain modification?
Section 25 of the act states the general rule. A building alteration on the land follows a project verified in the building intent proceedings (konanie o stavebnom zámere). The other basis is a notification (ohlásenie). Section 18 ods. 5 písm. k) then exempts the building alterations and small structures that § 18 ods. 3 does not list. They need neither a decision nor a notification. The table sets out the main routes for terrain works under the text valid until 31 December 2026.
| Situation | Route under the act | Section |
|---|---|---|
| Terrain modification with no trigger in § 18 ods. 3 | Neither a decision nor a notification | § 18 ods. 2 and ods. 5 písm. k) |
| Terrain works closer than 2 m to the builder's own boundary, works on a public space, or works that could endanger health or stability | Notification to the building office | § 18 ods. 3 písm. a), b), h) |
| Notified work that could affect the rights of third persons, or that needs conditions | The office says that the work may go ahead only on a decision on building intent | § 63 ods. 5 |
| Terrain works in general | Geodetic staking on the ground before work starts, except a small structure that needs only a notification | § 42 ods. 1 |
| Terrain modification that needed a decision on building intent | Final inspection (kolaudácia) before permanent use | § 66 ods. 1 |
| Terrain modification built without a verified project where the act asks for one | Unauthorised works, with the rules for removal | § 28 ods. 1, § 64 ods. 9 |
The table maps the act's routes, not your project. The building office decides which one applies.
When does the notification rule apply near a boundary?
Section 18 ods. 3 písm. b) names one trigger that matters for many gardens. A notification to the building office is required in one case here. The builder's works build or place a structure, or carry out terrain works, on the builder's own land. The works are closer than 2 m to the boundary of that land. The rule applies to small structures and building alterations other than the groups that § 18 ods. 3 already lists. The same paragraph also covers works on a public space (písm. a) and works that could endanger health or stability (písm. h).
The 2 m distance comes straight from the act. A notification is a lighter route than the building intent proceedings, but it is still a regulated step. Check the full paragraph and the version in force on the day you apply. From 1 January 2027, point 60 of Čl. I of act 243/2026 Z. z. replaces the word terénne in písm. b), so any building alteration within 2 m of the boundary is covered.
Do terrain works need geodetic staking first?
Yes, on the wording of the act. Section 42 ods. 1 says that terrain works may be carried out only after a geodetic surveyor has staked them out on the ground. The exception named in the same sentence is a small structure that needs only a notification. A terrain modification is a building alteration and not a small structure, so ask the building office whether the exception reaches your job. For the surveying side of the process, see site boundary staking.
How is a retaining wall different from a terrain modification?
A retaining wall is a built element that holds soil back. A terrain modification is the reshaping of the land itself. The two often appear in the same job. A cut or fill on a slope may need a wall to keep the new ground stable. The act sorts them into different categories, and a wall should be checked on its own terms.
| Feature | Terrain modification | Retaining wall |
|---|---|---|
| Category in the act | Building alteration, § 2 ods. 9 písm. c) | Simple structure if it is up to 3 m above the lowest level of the adjoining ground, § 2 ods. 6 písm. e) |
| Route until 31 December 2026 | Notification only if a trigger in § 18 ods. 3 applies, otherwise nothing | Decision on building intent, because notification covers only minor structures and building alterations (§ 18 ods. 2 and 3) |
| Main design question (advice) | Slopes, cut and fill, and where surface water goes | Load from the retained soil, foundation and drainage behind the wall |
Drainage ties the two together. Design advice: ask the designer where the water goes before you move soil, and give any wall a way to drain. The Civil Code adds a duty towards the neighbour. Act 40/1964 Zb., § 127 ods. 1 (text valid from 31 July 2026) sets the rule. An owner must not endanger the neighbour's building or land by changes to the plot. The owner must first take adequate measures to secure them. For the drainage side, see perimeter drainage system.
What changes for works carried out without a verified project?
Under § 28 ods. 1, building works carried out without a verified project, or contrary to one, are unauthorised works. This applies where the act asks for a project. A terrain modification that needs neither a decision nor a notification is not unauthorised for that reason. The amending act 243/2026 Z. z. adds a rule for works carried out between 1 April 2025 and 31 December 2026 without a verified project. A decision on building intent can approve such works afterwards, among them a terrain modification (§ 18 ods. 2, Čl. I bod 58). The office can approve it only under § 60 ods. 3 and 4. Section 60 ods. 4 písm. c) names a terrain modification or an outdoor adjustment that relates to a main building. Its examples are a fence, a paved area and a parking area. Those provisions apply from 1 January 2027.
How is an unauthorised terrain modification dealt with?
Section 64 is written for unauthorised information structures. Its ods. 9 applies ods. 1 to 8, with the necessary changes, to the removal of an unauthorised terrain modification. Those paragraphs let the building office consent to the removal and say who bears the cost. Ask the building office early, before the earthworks begin, rather than after the ground has moved.
How does the act connect terrain works to the final inspection?
Under § 66 ods. 1, a terrain modification that needed a decision on building intent requires a final inspection before permanent use. Keep the approved project and the staking record. The application for the inspection can include the geodetic documents from the staking (§ 66 ods. 2 písm. d). The Building Act article sets out the wider procedure and the old and new terms.
What changes for the definition in 2027?
Act 243/2026 Z. z. renumbers § 2 from 1 January 2027, so the definition moves to § 2 ods. 12 písm. c). The amendment also deletes the word ťažobné (extraction) from the list of examples (Čl. I bod 23). The rest of the definition keeps its wording.
Frequently asked questions
- Is every garden regrading a terrain modification?
- Often, but the definition has limits. Under § 2 ods. 9 písm. c) of act 25/2025 Z. z., works that change the relief, the subsoil or the drainage count. They must not be part of the building's own construction method, and they permanently change the plot. The definition also names works in the public interest for landscape purposes. Its wording does not say clearly whether a private garden job must meet that purpose. Ask the building office how it reads your job.
- Do I need geodetic staking before levelling my plot?
- Yes, on the wording of the act. Under § 42 ods. 1, terrain works may be carried out only after a geodetic surveyor has staked them out on the ground. The same sentence excepts a small structure that needs only a notification. A terrain modification is a building alteration and not a small structure, so ask the building office whether the exception reaches your job.
- Is a retaining wall a terrain modification?
- No. A retaining wall up to 3 m above the lowest level of the adjoining ground is a simple structure (§ 2 ods. 6 písm. e). A terrain modification is a building alteration (§ 2 ods. 9 písm. c). A wall often appears in the same job as a cut or fill, so check each part on its own.
- When does a terrain modification need a notification?
- When one of the triggers in § 18 ods. 3 applies. One trigger is terrain works on the builder's own land closer than 2 m to the boundary (písm. b). Others are works on a public space (písm. a) and works that could endanger health or the stability and safety of use (písm. h). If no trigger applies, the work needs neither a decision nor a notification (§ 18 ods. 5 písm. k).
- Which act governs terrain modifications now?
- Act 25/2025 Z. z., the Building Act, applies from 1 April 2025. Older terms can still appear in documents and in search results. This page follows the consolidated text valid from 1 November 2025 to 31 December 2026.
- Does the 2027 amendment change anything for terrain works?
- Yes, in part. Act 243/2026 Z. z. applies from 1 January 2027 (Čl. XV). It widens the 2 m trigger in § 18 ods. 3 písm. b) from terrain works to any building alteration on the builder's land. It also lets an office approve some unpermitted works afterwards, by a decision on building intent. Check the version in force on the day you apply.
Sources
- Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Národná rada Slovenskej republiky, Slov-Lex · § 2 ods. 6 písm. e) and ods. 9 písm. c); § 18 ods. 2, 3 and 5 písm. k); § 25; § 27 ods. 1; § 28 ods. 1; § 42 ods. 1; § 63 ods. 5; § 64 ods. 9; § 66 ods. 1 and 2
- Zákon č. 243/2026 Z. z., ktorým sa mení a dopĺňa zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Národná rada Slovenskej republiky, Slov-Lex · Čl. I body 23, 58, 60, 129 (§ 2 ods. 12 písm. c), § 18 ods. 2 and 3 písm. b), § 60 ods. 4 písm. c)), Čl. XV
- Zákon č. 40/1964 Zb. Občiansky zákonník · Národná rada Slovenskej republiky, Slov-Lex · § 127 ods. 1