Pool skimmer
A pool skimmer is an outlet in the pool wall at the waterline that takes surface water off the pool for the circulation system.
A pool skimmer is an outlet fitted into the pool wall at the waterline that takes surface water off the pool. The circulation pump draws the water through the outlet, and the water then passes to the filtration system. The other common way to take water off the surface is an overflow pool channel. This page uses two sources: the EUSA technical paper on domestic pool circulation (2010) and the installation manual for one skimmer model.
What is a pool skimmer and how does it work?
The EUSA paper calls the outlets "surface water skimmer outlets". The builder fits several of them into the top of the pool wall. The water stands about 150 to 200 mm below the top of the wall, half way up the mouth of the skimmers. The paper calls a pool built this way a skimmer pool.
The manual for the Ocean Skimmer De Luxe shows the parts of one model. A housing sits in the wall. A hinged flap (Skimmerklappe) sits in the mouth. A strainer basket (Siebkorb) sits inside the housing, and a faceplate covers the opening. The manual says the model suits steel-wall pools with a liner, prefabricated pools such as polyester pools, and solid pools of concrete or polystyrene.
Whether a pool needs a permit in Slovakia is a separate question. The garden swimming pool page covers it.
How is a skimmer pool different from an overflow pool?
Both designs take water off the surface, but in different ways. In a skimmer pool the water sits below the rim and leaves through outlets in the wall. In an overflow pool a continuous channel around the top of the wall takes the water. The table sets out what the EUSA paper says about each.
| Feature | Skimmer pool | Overflow pool |
|---|---|---|
| Water level | About 150 to 200 mm below the top of the pool wall | At the level of the channel and the bather area |
| Share of flow taken from the surface | 70 % through the skimmers, the rest through low-level outlets | A ratio of 75 to 25 |
| Balance tank | Not described in the paper | Needed, so that water keeps flowing into the channel |
The paper says most pollution in pool water sits in the top 75 mm. It concludes that good surface water removal is essential for efficient filtration and treatment. The skimmer takes only part of the circulation flow, because the low-level outlets take the rest.
Why does the water level matter for a skimmer?
The two sources give a level in different ways. The EUSA paper gives a distance from the wall top. The manufacturer gives marks on the faceplate.
| Source | Type | What it says about the water level |
|---|---|---|
| EUSA technical paper on domestic pool circulation | Industry association guidance, 2010 | About 150 to 200 mm below the top of the wall, half way up the skimmer mouth |
| Ocean Skimmer De Luxe manual | Manufacturer manual for one model | The ideal level lies between the two faceplate marks, in the upper third |
The manual describes the marks as simple visual checks of the minimum and maximum water level. It warns that a level below the minimum mark can damage the circulation pump. When the level comes near the lowest mark, the flow must be watched. For very small pumps, the manual says reducing the foam in the skimmer flap can raise the surface flow.
These marks apply to one model and are not a design rule for every pool. Ask the installer for the level of the exact model in your pool.
How does fitting a skimmer differ between liner and concrete pools?
The fitting follows the pool shell. The manual describes two cases for this model.
- Steel-wall pool with a liner. The model suits pools from 3 m diameter. The installer cuts an opening of 215.5 mm by 163.5 mm and drills holes of 5.5 mm for the flange. The protective foil serves as a template. A lip seal goes under the liner, and the installer screws the faceplate frame to the wall.
- Concrete pool. The installer sets the housing in position and then pours the concrete. A collar and neck set the height of the cover. The manual recommends inserting the housing cover when concreting. The installer glues the cover in after laying the tiles or stone slabs.
The manual also gives a safety rule. The housing cover must stay on during normal operation. When the cover is off, the skimmer must be secured against someone stepping in.
The EUSA paper does not give fitting steps. For the dimensions and the sealing of another model, follow that model's own manual.
What does a skimmer need from the rest of the circulation system?
The skimmer is the surface intake. The pump and the filter do the cleaning. The EUSA paper says the designer needs three inputs first: the pool size, the design bather load and the turnover requirement. For domestic pools it gives a turnover of between 4 and 8 hours.
The paper gives more design points that touch the skimmer.
- The pump should work in the mid range of its published performance curve.
- Where pipes split into branches, for example for several skimmer outlets, each branch takes its full share of the flow.
- Valves let the installer isolate each item for maintenance or repair.
The paper uses the word MUST for a national law and SHOULD for its own recommendation. It states the turnover figure with "must", yet it names no law. Treat the figure as association guidance.
Does Slovak law require a skimmer?
The texts read for this page do not name skimmers. These are Act 25/2025 Z. z. and decree 308/2012 Z. z. on bathing water. The decree applies as appropriate to pools in facilities that serve the public (§ 3 ods. 4) and does not mention private pools. The choice between a skimmer and an overflow edge therefore rests on the design and the supplier, not on a rule found here.
Frequently asked questions
- What is a pool skimmer?
- A pool skimmer is an outlet in the pool wall at the waterline. The pump draws surface water through it. The EUSA paper calls such outlets surface water skimmer outlets.
- How is a skimmer pool different from an overflow pool?
- A skimmer pool keeps the water below the rim and takes it through outlets in the wall. An overflow pool takes it over the rim into a channel around the top of the wall and needs a balance tank.
- What water level does a skimmer need?
- The EUSA paper gives about 150 to 200 mm below the top of the wall. One manufacturer manual asks for a level in the upper third between its marks and warns about a level near the lowest mark.
- Why does the skimmer matter for filtration?
- The EUSA paper says most pollution sits in the top 75 mm of the water. It concludes that good surface water removal is essential for efficient filtration and treatment.
- Is a skimmer required by Slovak law?
- The texts read for this page do not name skimmers. Act 25/2025 and decree 308/2012 do not require one. Ask the pool supplier which technical rules the design follows.
Sources
- Technical paper: Circulation systems for domestic swimming pools · EUSA, European Swimming Pool and Spa Association (page footer dated 2010) · Paragraphs 1 to 5, 8, 11 to 16, 30 and 31 (circulation, surface water removal, skimmer and overflow pools, pipework)
- OCEAN Skimmer De Luxe: Einbau- und Bedienungsanleitung (installation and operating manual) · Manufacturer's manual, distributed via poolshop123.de (article numbers 170542, 170560, 170936, 170937) · 1.1 (pool types), 2.1 and 2.1.1 (steel-wall pools), 2.2 and 2.2.1.1 (concrete pools, collar and neck), 2.4 (level marks), safety notes
- Vyhláška Ministerstva zdravotníctva SR č. 308/2012 Z. z. o požiadavkách na kvalitu vody, kontrolu kvality vody a o požiadavkách na prevádzku, vybavenie prevádzkových plôch, priestorov a zariadení na prírodnom kúpalisku a na umelom kúpalisku · Ministerstvo zdravotníctva SR, via Slov-Lex · § 3 ods. 4