Pool filtration system
A pool filtration system is the pump, filter and pipes that pass pool water through a filter medium to remove suspended matter.
A pool filtration system is the pump, filter and pipes that pass pool water through a filter medium to remove suspended matter. The European standard for domestic pool filters says filtration works by passing the water through a suitable medium held in a filter body. Disinfection is a separate step, covered in saltwater chlorination. The intake of surface water is covered in pool skimmer.
What does a pool filtration system contain?
The EUSA technical paper on domestic pool circulation (2010) describes the circulation system as a circulation pump and a pipework system. It moves the water from the pool through filtration, heating and treatment systems and returns it to the pool. The paper also says valves let the installer isolate each item for maintenance or repair. The filter is the part people compare most, because its medium decides how the filter is cleaned.
The standard EN 16713-1 covers filter elements, filter media, filtration units and complete filtration systems for domestic pools. It applies to pools as defined in EN 16582-1. It does not apply to these cases.
- Pools for public use, which fall under EN 15288-1.
- Spas for domestic or public use.
- Paddling pools.
- Pre-filtration.
- Natural and nature-like pools, such as a natural swimming pond.
EN 16713 has three parts. Part 1 covers filtration, part 2 covers circulation systems and part 3 covers water treatment. A filter can meet part 1 while the circulation design still needs checking against part 2.
Which filter types are in common use?
The introduction to EN 16713-1 says four types of filter are generally accepted for swimming pools. The table names them. The last column holds questions for the pool builder, not requirements.
| Filter type | Medium | What to ask the builder |
|---|---|---|
| Pre-coat filter with diatomaceous earth (DE) | A layer of diatomaceous earth | How the layer is renewed, and who handles the spent material |
| Disposable cartridge or filter bag | A cartridge element or a bag | How many spare elements the owner needs each season |
| Graded aggregate filter, single or multi-layer | Graded granular layers, such as sand | The backwash flow, and where the backwash water goes |
| Other filters, for example membrane systems | A membrane element | The manufacturer's test data for the product |
The standard has criteria for backwashing, replacement and cleaning (clause 4.7). The text available for this page shows the headings only. The manufacturer's manual gives the cleaning routine for the actual product.
What does EN 16713-1 test in a filter?
The contents list of EN 16713-1 shows what the standard checks. Only the headings were read, so this page quotes no limit value. The standard has clauses on these points.
- The maximum filter flow rate (clause 4.2).
- The filter media, including sand and alternatives to sand (clause 4.3).
- The maximum operating pressure (clause 4.4).
- The turbidity reduction efficiency (clause 4.5).
- The retention capacity (clause 4.6).
- Pressure resistance for pressure filters and for negative pressure filters (clauses 5 and 6).
- Point-of-purchase information, the user's manual and maintenance advice (clause 8).
Ask the supplier for the test report of the filter against these clauses.
Sand, cartridge or glass: which medium suits a garden pool?
The sources read do not rank the media, so no medium is the right answer for every pool. Choose the one the owner will maintain. The standard has a clause on sand filter media (clause 4.3.3). Its clause 4.7 gives criteria for backwashing, replacement and cleaning, so each medium has its own routine. The standard has a clause on alternatives to sand media (clause 4.3.4). The text available for this page does not show what it asks of a glass medium. Ask the manufacturer for test data and check the claim against the full standard.
The filter must also suit the pump. The standard sets a maximum filter flow rate and a maximum operating pressure. The EUSA paper says the pump should work in the mid range of its published performance curve. Ask the pool builder to show both the pump curve and the filter limits in the specification.
What is turnover, and why does it matter?
The EUSA paper says the designer cannot design the circulation system without three inputs: the pool size, the design bather load and the turnover requirement. For domestic pools it gives a turnover of between 4 and 8 hours. The paper uses the word MUST for a national law, yet it names no law for this figure. Treat the figure as association guidance.
EN 16713-2 holds the circulation requirements, and the copy read for this page does not include it. Take the design turnover from the pool builder's specification and the pump maker's data. Record it in the project documents with the date.
Where does backwash water go?
Backwashing a filter that uses it sends used water out of the system, and the owner must decide where it goes. The water act, Act 364/2004 Z. z., sets the rules. It defines wastewater as water used in dwellings, businesses or similar facilities whose quality has changed (§ 2 písm. j). Backwash water may fit that definition. The water authority decides.
Discharge of wastewater into groundwater needs a permit (§ 21 ods. 1 písm. c). The authority issues the permit only after a prior survey by an authorised person (§ 37 ods. 1). The applicant pays for the survey (§ 37 ods. 2). Discharge of wastewater with any hazardous substances into groundwater is prohibited (§ 37 ods. 3).
Discharge into a public sewer is a separate rule. A permit is needed for industrial wastewater or special water that contains the priority and listed substances of the act's annex (§ 38 ods. 1). The act does not name pools. Ask the water authority and the sewer operator before you choose a route.
| Route | Rule | What to check before you choose |
|---|---|---|
| Groundwater | Act 364/2004 § 21 ods. 1 písm. c and § 37 ods. 1 to 3: permit after a survey, hazardous substances prohibited | Whether the authority treats the backwash as hazardous, and who pays for the survey |
| Public sewer | Act 364/2004 § 38 ods. 1: permit for industrial wastewater with listed substances | Whether the sewer operator accepts the backwash, and on what terms |
| Filter without backwash | No backwash water to route | How the owner disposes of cleaning residue and spent elements |
How is a pool filtration system different from a garden swimming pool?
A garden swimming pool is the basin and its place in the building rules. A pool filtration system is the equipment that keeps the water clean. The pool volume feeds the turnover calculation, and the position of the basin sets where the drain water can go.
Act 25/2025 Z. z. counts technical and operating equipment, without which a free-standing structure would be incomplete, as part of that structure (§ 2 ods. 2). The act does not say how this applies to the filtration equipment of a pool. Ask the building office whether the technology room counts toward the limit of 25 m2 for underground minor structures.
Frequently asked questions
- Do I need a permit to drain pool backwash water in Slovakia?
- Possibly. Discharge of wastewater into groundwater needs a permit from the water authority (Act 364/2004 § 21 ods. 1 písm. c), after a prior survey (§ 37 ods. 1). Sewer discharge follows § 38. Ask both bodies before you choose a route.
- Is a sand filter better than a cartridge filter for a garden pool?
- The sources read do not rank them. Ask the supplier whether the filter backwashes, because backwash water needs a drain route. Choose the one the owner will maintain.
- What is pool turnover?
- Turnover is a design input for the circulation system. The EUSA paper gives 4 to 8 hours for domestic pools. Take the design value from the pool builder's specification and the pump maker's data.
- Does EN 16713-1 apply to public swimming pools?
- No. The scope of the standard excludes pools for public use, which fall under EN 15288-1. It covers filter elements, media, units and systems for domestic pools.
- Can glass media replace sand in a pool filter?
- The text of EN 16713-1 available for this page does not settle it. The standard has a clause on alternatives to sand media. Ask the manufacturer for test data and check it against the full standard.
Sources
- STN EN 16713-1 (EN 16713-1:2016): Bazény na domáce použitie. Systémy rozvodu vody. Časť 1: Filtračné systémy. Požiadavky a skúšobné metódy · Úrad pre normalizáciu, metrológiu a skúšobníctvo SR, via normy.normoff.gov.sk · Contents list; European foreword; Introduction (four filter types); clauses 1 and 2 (scope, normative references). Sample copy ends before clause 3.
- Technical paper: Circulation systems for domestic swimming pools · EUSA, European Swimming Pool and Spa Association (page footer dated 2010) · Paragraphs 1 to 5, 8, 31 (circulation system, turnover, pump curve, valves)
- Zákon č. 364/2004 Z. z. o vodách a o zmene zákona Slovenskej národnej rady č. 372/1990 Zb. o priestupkoch (vodný zákon) · Slov-Lex, Zbierka zákonov SR (consolidated version in force from 14.10.2025) · § 2 písm. j; § 21 ods. 1 písm. c; § 37 ods. 1, 2 and 3; § 38 ods. 1
- Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Národná rada Slovenskej republiky, Slov-Lex · § 2 ods. 2 and ods. 4 písm. b