Saltwater chlorination

Saltwater chlorination is a pool disinfection method that makes free chlorine from dissolved salt in an electrolysis cell.

Saltwater chlorination (soľná elektrolýza) is a pool disinfection method in which an electric cell converts dissolved salt into free chlorine on site. The salt is the raw material, not the disinfectant. A garden swimming pool with a salt chlorinator is still a chlorinated pool. This page separates what public-health sources confirm from design advice. It also shows which figures are US guidance and which are Slovak rules.

What is saltwater chlorination and how does it work?

A salt chlorinator is a control unit with an electrolysis cell. The U.S. Centers for Disease Control and Prevention (CDC) describes the process in a 2012 report on pool filter backwash. In saltwater pools, an electric current passes through the water and generates free chlorine from sodium chloride. The CDC adds that this free chlorine is the same as the free chlorine from traditional chlorine products.

The owner does not add chlorine products by hand. The cell makes the chlorine from the salt in the water. The sources for this page do not describe the cell or its life, so ask the supplier for the data sheet of the product.

Is a salt pool a chlorinated pool?

Yes. A salt pool is sometimes described as chlorine-free, but the CDC states that its free chlorine is the same as free chlorine from traditional products. The water of a salt pool needs the same tests as the water of any other chlorinated pool.

The CDC lists what lowers the chlorine level in a home pool: dirt, sweat and other matter from swimmers' bodies, and sunlight. This is not specific to salt pools. The CDC advises more tests when many people use the pool.

What chlorine and pH levels should a pool keep?

There are two different sets of figures, and they come from different kinds of sources. The CDC figures are US public-health guidance for home pool owners. They are not Slovak rules. The Slovak figures are limit values in decree 308/2012 Z. z. for artificial bathing sites. Table 1 sets them side by side.

ItemCDC guidance (United States, home pools)Decree 308/2012 Z. z., annex 3 (Slovakia, artificial bathing sites)
Nature of the figureRecommendationLimit value (medzná hodnota), the value above which the water no longer complies
Free chlorineAt least 1 ppm in pools, at least 2 ppm where cyanuric acid is used0.6 mg/l, up to 1 mg/l above 28 °C, at most 0.3 mg/l in pools for children and infants
Combined chlorineNot given on the page0.3 mg/l
pH7.0 to 7.86.5 to 7.8
How often to testChlorine and pH at least twice per day, more often with heavy useFree chlorine and pH three times a day, and free chlorine after each new filling

The CDC minimum is a lower bound for a home pool in the US. The Slovak figure is an upper bound for a public site. Do not read one as the target of the other. A Slovak public pool follows the decree, and the CDC page is a reference for good practice only.

Which rules apply to a salt pool in Slovakia?

Decree 308/2012 Z. z. regulates water quality, checks and operation of natural and artificial bathing sites. Annex 3 gives the values for artificial sites. Under § 3 ods. 4 those requirements apply, with the necessary changes (primerane), to pools in facilities that serve the public, such as accommodation, health and social service facilities, and facilities for children and young people.

The decree does not mention private or family pools. For a house pool it is therefore a reference, not a binding limit on the owner. The decree names free chlorine and not its source, so the limits do not depend on how the pool makes the chlorine. The Slovak search term is soľná elektrolýza bazénovej vody.

Does saltwater chlorination make the water safer?

The only study found is small. In 2012 the CDC tested 161 filter backwash samples from public pools in metro-Atlanta. The share of samples positive for Pseudomonas aeruginosa differed between venues with traditional chlorine plus ultraviolet light (9 of 21) and venues with saltwater-generated chlorine (11 of 14). The CDC calls the pools a convenience sample and says the findings cannot be generalised. The study does not rank the two methods.

Treat the result as a reason to test the water, not as a reason to choose or avoid a salt system.

How should an architect handle saltwater chlorination in a design?

The pool supplier chooses the salt system. The architect plans the room, the access and the questions to ask. This list is design advice, and no source for this page sets a value for any item. Plan the room together with the pool filtration system.

  • Ask the supplier for the data sheet of the cell and control unit, with the output range and the pool volume it serves.
  • Ask the supplier which materials the manufacturer approves for contact with salt water, and get the answer in writing.
  • Plan a dry space for the control unit, a power connection and access to take out the cell.
  • Agree a test routine with the owner for free chlorine and pH. Use the CDC advice for a home pool and the decree for a pool that serves the public.
  • If the pool serves guests, ask the regional public health office which Slovak requirements apply.
QuestionWho can answer it
Which water limits apply to a public pool in SlovakiaDecree 308/2012 Z. z. and the public health office
Which chlorine level a US health body recommends for a home poolThe CDC page on home pool water treatment
Cell output, life and approved materialsThe manufacturer's data sheet, through the pool supplier

Frequently asked questions

Is a saltwater pool chlorine-free?
No. A salt pool uses an electric cell to generate free chlorine from sodium chloride. The CDC states that this free chlorine is the same as the free chlorine from traditional chlorine products, so the pool needs the same water tests.
Does a saltwater pool still need water tests?
Yes. The CDC advises testing chlorine and pH at least twice per day for home pools, and more often when many people use the pool. This is US guidance. Slovak public pools follow decree 308/2012 Z. z., which sets three tests a day.
Are the CDC chlorine levels the Slovak rule?
No. The CDC figures, at least 1 ppm free chlorine and pH 7.0 to 7.8, are US guidance for home pools. Slovak public pools follow decree 308/2012 Z. z. with a free chlorine limit of 0.6 mg/l and pH 6.5 to 7.8.
Does the Slovak bathing water decree apply to a family garden pool?
The decree 308/2012 Z. z. regulates natural and artificial bathing sites. It applies its artificial-site values with the necessary changes to pools in facilities that serve the public, and it does not mention private or family pools.
What free chlorine limit applies to a public pool in Slovakia?
Annex 3 of decree 308/2012 Z. z. gives 0.6 mg/l, or up to 1 mg/l above 28 °C. In pools for children and infants the limit is 0.3 mg/l. Operators test free chlorine three times a day and after each new filling.

Sources

  1. Vyhláška Ministerstva zdravotníctva Slovenskej republiky č. 308/2012 Z. z. o požiadavkách na kvalitu vody, kontrolu kvality vody a o požiadavkách na prevádzku, vybavenie prevádzkových plôch, priestorov a zariadení na prírodnom kúpalisku a na umelom kúpalisku · Ministerstvo zdravotníctva SR, via Slov-Lex · § 1, § 2 písm. a, § 3 ods. 3 and 4, annex 3 with notes 5 and 6
  2. Home pool and hot tub water treatment and testing · U.S. Centers for Disease Control and Prevention · Page dated 10 May 2024
  3. Microbes in Pool Filter Backwash as Evidence of the Need for Improved Swimmer Hygiene, Metro-Atlanta, Georgia, 2012 · U.S. Centers for Disease Control and Prevention, MMWR · Table 2 and footnote on saltwater pools