Ecological corridor (biokoridor, ÚSES)
A biokoridor is a connected group of ecosystems that links biocentres and lets organisms migrate, as part of the Slovak ÚSES.
What is a biokoridor?
A biokoridor is a connected group of ecosystems that links biocentres and lets organisms migrate and exchange genetic information.
This is the definition in Act 543/2002 Z. z. on nature and landscape protection (§ 2 ods. 2 písm. e). The act adds that interaction elements join the biokoridor in space. Slovak sources also write "biokoridor" for the English "ecological corridor". The act itself does not use the words "wildlife corridor", so the Slovak term is the one to search for in local documents.
A biokoridor does not need to be a strip of forest. The act describes it by its function, which is to connect, and not by a width or a plant cover. What it looks like on a given plot is set in the local ÚSES document and in the municipal plan.
What is ÚSES and what does it contain?
The Territorial System of Ecological Stability (ÚSES) is a landscape-wide structure of connected ecosystems. In Slovak it is the územný systém ekologickej stability. It secures a variety of conditions and forms of life.
The act says its base is formed by biocentres, biokoridors and interaction elements of supraregional, regional or local significance (§ 2 ods. 2 písm. a). Three terms matter on a site:
- A biocentre is an ecosystem or a group of ecosystems. It creates permanent conditions for reproduction, shelter and feeding of organisms (§ 2 ods. 2 písm. d).
- A biokoridor connects biocentres (§ 2 ods. 2 písm. e).
- An interaction element is an ecosystem or a part of one, such as permanent grassland or a marsh. It links to biocentres and biokoridors and lets them act on the surrounding landscape that people changed (§ 2 ods. 2 písm. f).
The act does not say that a biokoridor is narrower or less valuable than a biocentre. It only gives the two a different job. A biocentre holds a community in place and a biokoridor links biocentres.
What are the three levels of ÚSES and who prepares them?
ÚSES has three levels, and each has its own document. Act 543/2002 names them in § 54 ods. 10.
| Level | Document | Who prepares it |
|---|---|---|
| Supraregional | Generel nadregionálneho územného systému ekologickej stability SR, a strategy for the whole state | The ministry prepares it and the government approves it (§ 54 ods. 20) |
| Regional | Document of the regional ÚSES | The district office (okresný úrad) prepares and approves it (§ 68 písm. a) |
| Local | Document of the local ÚSES | The municipality prepares and approves it (§ 69 ods. 1 písm. g) |
In a protected landscape area, a national park or a nature park, the care programme serves as the regional document (§ 54 ods. 11). Each document sets the measures that protect the variety of conditions and forms of life at its level.
For a client the local document is the closest one. The municipality prepares it. It can tell you which parts of its territory belong to a biocentre, a biokoridor or an interaction element.
Does a biokoridor forbid building on my plot?
The act does not forbid building in a biokoridor as such. The rules come from the plan and from the opinion of the nature protection authority.
Four rules apply:
- Creating and maintaining ÚSES is a public interest (§ 3 ods. 3 of 543/2002). The spatial planning act lists ÚSES and ecological connectivity in its definition of public interest (200/2022 § 5 písm. u).
- A business or a legal person may plan an activity that endangers or disturbs ÚSES. It must then also propose measures that help create and maintain ÚSES (§ 3 ods. 3 of 543/2002).
- The municipal spatial plan shows ÚSES in its solution of land use and function (200/2022 § 22 ods. 4). The binding part of the plan binds the decision on the building intent (200/2022 § 22 ods. 5).
- The nature protection authority is an affected authority in the proceedings on the building intent. It issues a binding opinion on nature and landscape protection (543/2002 § 9 ods. 1 písm. b). See binding opinion.
So the answer for one plot is in the plan and in that opinion. This page cannot give a distance or a width, because the act sets none.
How do I find out whether my plot is in a biokoridor?
Ask the municipality and read its spatial plan. Both the plan and the local ÚSES document come from the municipality, and the plan must show ÚSES (200/2022 § 22 ods. 4).
- Get the municipal spatial plan and its binding part. See municipal land use plan.
- Check the plan drawings for the plot and its neighbours.
- If the plot lies at the edge of a mapped element, ask the municipality for the local ÚSES document.
- Add the result to your site analysis before you buy the plot or start the design.
This page did not check how municipalities publish these documents, so ask the municipality for the current version.
Does felling a tree in a biokoridor need consent?
A tree outside a forest needs the consent of the nature protection authority before felling. The act exempts some trees (§ 47 ods. 3 and 4 of 543/2002). Being in a biokoridor does not change that general rule, but it can affect the details.
- The size exemption has limits. It does not apply to a solitary tree, a tree row, part of an avenue or a remíza (a small wooded patch in open land). It does not apply to public green or cemeteries (§ 47 ods. 4 písm. a and ods. 5).
- On land with the second or third degree of protection, a person who fells under the size exemption must notify the authority first. The authority has 15 working days to limit or forbid the felling (§ 47 ods. 10).
- Riparian growth, a lake or an avenue can be a significant landscape feature. Use such a feature so that you do not disturb its ecological stabilising function (§ 2 ods. 2 písm. c and § 3 ods. 2).
See tree felling consent for the full procedure and the size limits.
Is ÚSES the same as a wildlife corridor?
No. ÚSES is a defined term in Slovak law that covers three types of element on three levels. "Wildlife corridor" is an English phrase that the Slovak act does not define.
The biokoridor is the part of ÚSES that works like a wildlife corridor, because it lets organisms migrate between biocentres. The glossary also has a page on the wildlife corridor. Use the Slovak term when you talk to the municipality or the district office.
What should a designer do about a biokoridor?
Check it early, because it can change where the house goes. The act gives three starting points.
- Read the plan and the local ÚSES document before you fix the building position.
- If your activity may disturb ÚSES, prepare measures that help it, as § 3 ods. 3 asks of a business or a legal person.
- Ask the nature protection authority early. It gives the binding opinion that the building intent proceedings need. See also environmental authority approval.
The act does not set a protective strip, a minimum width or a fee for any of this. Anyone who gives you such a number for a biokoridor should name the plan or decision it comes from.
Frequently asked questions
- What is a biokoridor?
- A biokoridor is a connected group of ecosystems that links biocentres and lets organisms migrate and exchange genetic information (543/2002 § 2 ods. 2 písm. e). It is one of the three parts of ÚSES.
- What does ÚSES stand for?
- ÚSES is the Slovak abbreviation of územný systém ekologickej stability, the Territorial System of Ecological Stability. Its base is biocentres, biokoridors and interaction elements of supraregional, regional or local significance (543/2002 § 2 ods. 2 písm. a).
- What is the difference between a biocentre and a biokoridor?
- A biocentre creates permanent conditions for reproduction, shelter and feeding of organisms. A biokoridor connects biocentres and allows migration and genetic exchange between them (543/2002 § 2 ods. 2 písm. d and e).
- Who prepares the local ÚSES document?
- The municipality prepares and approves it (543/2002 § 69 ods. 1 písm. g). The district office does the same for the regional document and the ministry for the national generel, which the government approves.
- Can I build in a biokoridor?
- The act does not forbid it as such. The municipal plan shows ÚSES and its binding part binds the decision on the building intent. The nature protection authority also gives a binding opinion. The answer for one plot is in those documents.
- How do I check whether my plot is in a biokoridor?
- Ask the municipality for the spatial plan and, if needed, the local ÚSES document. The plan must show ÚSES (200/2022 § 22 ods. 4). Put the result into your site analysis before you buy.
Sources
- Zákon č. 543/2002 Z. z. o ochrane prírody a krajiny · Národná rada Slovenskej republiky, via Slov-Lex · § 2 ods. 2, § 3, § 9 ods. 1, § 47, § 48, § 54 ods. 10, 11, 20, § 68, § 69
- Zákon č. 200/2022 Z. z. o územnom plánovaní · Národná rada Slovenskej republiky, via Slov-Lex · § 5 písm. u), § 22 ods. 3 až 5
- Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Národná rada Slovenskej republiky · § 18 ods. 2 a 3