Tree felling consent (tree removal permit)
A tree felling consent is a written approval from the nature protection authority that you need before you fell a tree outside a forest.
What is a tree felling consent?
A tree felling consent is a written approval from the nature protection authority that you need before you fell a tree outside a forest.
Slovak law calls it "súhlas na výrub dreviny" (consent to fell a woody plant). Many people say "povolenie na výrub" (permit), and this glossary uses "tree removal permit" for that phrase. The act itself says consent. Act 543/2002 Z. z. on nature and landscape protection sets the rule in § 47 ods. 3: felling needs the consent of the nature protection authority unless the act says otherwise.
The act defines a "drevina" as a tree or a shrub with its root system. It grows alone or in groups outside a forest plot (§ 2 ods. 2 písm. m). The rule covers woody plants outside forest land.
Which trees do not need consent?
The act exempts some trees by size and some by situation. The size limit is the circumference of the trunk, measured 130 cm above the ground (§ 47 ods. 4 písm. a).
| Where the tree grows | No consent for trees with a trunk circumference up to | Shrub stands up to |
|---|---|---|
| In a built-up area of the municipality, on land that the municipal plan designates for building | 60 cm | 20 m2 |
| In a built-up area, on land that the plan does not designate for building | 80 cm | 100 m2 |
| Outside the built-up area of the municipality | 90 cm | 200 m2 |
The act adds exemptions for other situations. The main ones are:
- Renewal of productive fruit trees, if you plant new fruit trees within 18 months of the felling (§ 47 ods. 4 písm. b).
- Immediate danger to the health or life of a person, or an immediate threat of significant damage to property (§ 47 ods. 4 písm. c).
- Felling that another state authority permits or orders under a special law (§ 47 ods. 4 písm. d).
- Felling of invasive non-native species from the lists in special rules (§ 47 ods. 4 písm. g).
- Fast-growing plantations on farmland and plantations of Christmas trees and ornamental trees (§ 47 ods. 4 písm. h).
The size exemption does not apply to trees in a cemetery or in public green in the built-up area. It also does not apply to a solitary tree, a tree row, part of an avenue or a remíza (§ 47 ods. 5). Such a tree needs consent whatever its size.
What if I fell for danger or fruit tree renewal?
You must notify the nature protection authority in writing. You must also show that the conditions were met. The deadline is five days after the felling (§ 47 ods. 6). This covers the fruit tree renewal and the immediate danger exemptions. The authority may extend the deadline for planting new fruit trees by up to six months if you ask before the deadline runs out.
Who issues the consent?
The municipality decides for trees in its built-up area (§ 69 ods. 1 písm. d). The district office (okresný úrad) decides for trees outside the built-up area of the municipality (§ 68 písm. c).
If the municipality is also the applicant, the district office names which municipality handles the case (§ 69 ods. 3). A municipality may also issue a generally binding regulation on the details of protecting trees in public green (§ 69 ods. 2).
Do I need the consent when I build a house?
You need it if a tree on the plot is not exempt and you want to fell it for the building. You can ask for it in the proceedings on the building intent (§ 47 ods. 13). The act then changes the form of the consent. Suppose the request for felling is part of the building intent. The nature protection authority is then an affected authority in the proceedings. It issues a binding opinion instead of a consent.
That binding opinion proves the felling consent in the same way as the consent itself does. See binding opinion and decision on the building intent.
You may fell only after the trees are marked and after the consent is final (§ 47 ods. 11). The person who fells must show the consent when asked. A carrier or buyer of timber must also show, on request, where the wood came from, by the consent (§ 47 ods. 12).
What does the application contain?
Decree 170/2021 Z. z. lists the content of the application in § 22 ods. 8. It names:
- the name and address of the applicant, or the company name and seat,
- the cadastral area and the parcel number, with a map or another document that identifies the trees,
- the consent of the owner or manager of the land, or of the tenant if the lease gives that right,
- proof of the applicant's relation to the land,
- the species, number and health condition of the trees, with the trunk circumference at 130 cm, or the area of a shrub stand,
- the reason for the request.
Before the consent, the authority assesses the ecological and aesthetic functions of the tree and the effects on human health. The trees must also carry a mark (§ 47 ods. 3). The decree describes the marking as a round colour sign with a diameter of 5 cm (§ 22 ods. 12). The act sets no fixed time limit for the decision and no period of validity for the consent, so this page does not give one.
When may I fell?
The decree says felling should happen mainly in the period of vegetation rest, primarily from 1 October to the end of February (§ 22 ods. 11 of 170/2021). The text states a preference and not a ban on other months. The authority takes this period into account when it sets the conditions. Other rules may limit felling in the nesting season, so ask the authority before you fell outside that window. This page did not check those rules.
What is replacement planting?
Replacement planting (náhradná výsadba) is planting of new trees. The authority orders it in the felling consent, at the applicant's cost, at a place it sets in advance (§ 48 ods. 1).
- The authority prefers geographically native and traditional species.
- If you do not own the land of the new tree, the authority may order you to care for it. The limit is three years, and the owner must agree first (§ 48 ods. 1 and 2).
- If planting is not possible, the authority orders a financial compensation, up to the social value of the tree. The money goes to the municipality.
- A person who felled without consent can also be ordered to plant or pay.
The act does not say "two trees for one". The number depends on the case, so ignore any fixed ratio you see online. See native planting and green space coefficient for the design side.
Are some trees protected from felling even with consent?
Yes. The district office in the regional seat may declare an extraordinary tree, a group of trees or a tree row a protected tree. Felling or treating it needs the consent of the nature protection authority (§ 49 ods. 1 and 3), and the replacement planting rules apply. Territories with the fourth or fifth degree of protection are different, because felling is forbidden there (§ 47 ods. 4 písm. i).
Check protected trees and zones when you do the site analysis, and ask early in a pre-application consultation.
Frequently asked questions
- Do I need a permit to fell a tree on my own plot?
- Usually yes. A tree outside a forest needs the consent of the nature protection authority (543/2002 § 47 ods. 3), unless the act exempts it by size or situation. The owner is not exempt as such.
- Which trees can I fell without consent?
- In a built-up area, trees up to 60 cm trunk circumference on building land or up to 80 cm elsewhere. Outside it, up to 90 cm. The circumference is measured at 130 cm (§ 47 ods. 4 písm. a). Solitary trees, tree rows, avenues and trees in public green have no size exemption (§ 47 ods. 5).
- Who issues the tree felling consent?
- The municipality for trees in its built-up area (§ 69 ods. 1 písm. d). The district office for trees outside the built-up area (§ 68 písm. c).
- Can I ask for the felling in the building intent proceedings?
- Yes (§ 47 ods. 13). The nature protection authority then issues a binding opinion instead of a consent, and that opinion proves the felling consent.
- When may I fell a tree?
- Decree 170/2021 § 22 ods. 11 says felling should be done mainly in the period of vegetation rest, primarily from 1 October to the end of February. It is a preferred period and not a general ban on other months.
- What is replacement planting?
- It is new planting that the authority orders in the consent, at your cost. If the new tree is on land you do not own, the authority may order care for up to three years. If planting is not possible, a financial compensation applies (§ 48 ods. 1).
Sources
- Zákon č. 543/2002 Z. z. o ochrane prírody a krajiny · Národná rada Slovenskej republiky, via Slov-Lex · § 2 ods. 2, § 3, § 47, § 48, § 49, § 54 ods. 10, 11, 20, § 68, § 69
- Vyhláška Ministerstva životného prostredia Slovenskej republiky, ktorou sa vykonáva zákon č. 543/2002 Z. z. o ochrane prírody a krajiny · Ministerstvo životného prostredia Slovenskej republiky, via Slov-Lex · § 22 ods. 8, 11, 12
- Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Národná rada Slovenskej republiky · § 18 ods. 2 a 3