Landscape character assessment
A landscape character assessment is a study that describes the features that give a landscape its character and the forces that change them.
What is a landscape character assessment?
A landscape character assessment is a study that describes the features that give a landscape its character and the forces that change them.
The European Landscape Convention of the Council of Europe defines a landscape as an area, as perceived by people. Its character is the result of the action and interaction of natural and human factors (Art. 1 písm. a). It defines landscape protection as actions to conserve and maintain the significant or characteristic features of a landscape (Art. 1 písm. d). Under Art. 6 C the parties are to analyse the characteristics of their landscapes and the forces and pressures that transform them. The acts read for this page prescribe no method for it.
Is "krajinný ráz" a legal term in Slovakia?
Not in the current nature protection act. The text of Act 543/2002 in the version effective from 10 November 2026 does not contain the words "krajinný ráz". The act speaks of care for the "characteristic appearance and use of the landscape" (charakteristický vzhľad a využívanie krajiny, § 2 ods. 1). It also defines a significant landscape feature (významný krajinný prvok). This is a part of the territory that forms the characteristic appearance of the landscape or adds to its ecological stability. Examples are a forest, a bank growth, a lake, a wetland, a park or an avenue (§ 2 ods. 2 písm. c).
Act 25/2025 does not use the phrase either. This page therefore treats "krajinný ráz" as a professional term, not a statutory instrument. None of the acts read for this page requires a landscape character assessment as a document for a family house.
Which rules apply to a building in a protected landscape?
A government regulation can declare a protected landscape area (chránená krajinná oblasť, CHKO) for a larger territory, usually above 1 000 ha. The area has scattered ecosystems and a characteristic landscape appearance or specific forms of historical settlement (543/2002 § 18 ods. 1). The second degree of protection applies there unless the act says otherwise (§ 18 ods. 2).
In the second degree the act lists activities that need the consent of the nature protection authority (§ 13 ods. 2). Among them are:
- fencing a plot outside the built-up area of a municipality (písm. d),
- placing a shelter or building for farm animals outside the built-up area (písm. e),
- placing an information construction outside the built-up area, if it is not permitted under the building act (písm. g).
The nature protection authority is also an affected authority in the building procedures. It issues a binding opinion (see environmental binding opinion and binding opinion). A district office issues it for the first and second degree. The district office in the regional seat issues it for the third to fifth degree (§ 67 písm. f, § 68 písm. d).
What does the building act require of the designer?
Under Act 25/2025 the designer is responsible for a specific fit. The building must fit its surroundings and the character of the place in urban, architectural, structural and operational terms (§ 35 ods. 6 písm. e). The designer is also responsible for a design that respects environmental interests. These include nature, habitats, wetlands, trees and the nesting and resting places of birds and bats (§ 35 ods. 6 písm. g). The act does not define "character of the place". It gives no checklist of features to assess.
A related step is site analysis, a survey of the plot and its surroundings. A landscape character assessment is a deeper reading of the landscape around the plot. It supports the design, but none of the acts read for this page requires it.
Where does landscape appear in Slovak planning law?
Act 200/2022 on spatial planning says that planning documentation sets the urban concept and the landscape concept of an area (§ 18 ods. 1). The act also names a landscape planning study (krajinnoplánovacia štúdia). It describes the actual state of the landscape. It checks or proposes part of the urban concept for a defined area. The part covers landscape infrastructure, landscape structure or green infrastructure (§ 16 ods. 4). A municipality or a region may have such a study. Ask the municipality if one covers your plot.
How does the landscape enter an EIA?
For an activity that needs an EIA or screening, the documents must describe the landscape. The plan of the activity (zámer) describes the state of the environment. It includes the item "landscape, landscape image, stability, protection, scenery" (24/2006 Annex 9). The act counts landscape among the environmental components that an EIA covers (§ 3 písm. a). See environmental impact assessment.
How do genius loci and vernacular architecture relate to it?
Genius loci is the sense of a place. Genius loci, vernacular architecture and critical regionalism are design ideas that architects use to respond to a place. They are not legal tests in the acts read for this page. A landscape character assessment supplies the facts that these ideas work from. The design decision stays with the designer and the principal, within the binding opinions of the authorities.
Frequently asked questions
- What is landscape character assessment?
- It is a study that describes the features that give a landscape its character and the forces that change them. The European Landscape Convention defines landscape as an area, as perceived by people, whose character results from natural and human factors.
- Is krajinný ráz defined in Slovak law?
- Not in Act 543/2002 in the version effective from 10 November 2026, where the words do not appear. The act speaks of the characteristic appearance and use of the landscape (§ 2 ods. 1). It also speaks of significant landscape features (§ 2 ods. 2 písm. c).
- Do I need a landscape character assessment for a house?
- No act read for this page requires one. Act 25/2025 makes the designer responsible for how the building fits its surroundings and the character of the place (§ 35 ods. 6 písm. e).
- What changes in a protected landscape area?
- A CHKO has the second degree of protection unless the act says otherwise (543/2002 § 18 ods. 2). Some activities there need the nature authority's consent, for example fencing a plot outside the built-up area (§ 13 ods. 2 písm. d).
- How does it differ from an EIA?
- An EIA is a statutory procedure under Act 24/2006 for activities listed in its Annex 8. A landscape character assessment is not a statutory procedure. An EIA documentation does describe the landscape (Annex 9).
- How does it relate to site analysis?
- Site analysis surveys the plot and its surroundings. A landscape character assessment reads the wider landscape. The building act asks the designer for harmony with the surroundings and the character of the place (25/2025 § 35 ods. 6 písm. e).
Sources
- European Landscape Convention (ETS No. 176), Florence, 20 October 2000 · Council of Europe (text as hosted by the University of Minnesota Human Rights Library) · Art. 1 písm. a a d, Art. 6 C
- Zákon č. 543/2002 Z. z. o ochrane prírody a krajiny · Národná rada Slovenskej republiky, via Slov-Lex · § 2 ods. 1, § 2 ods. 2 písm. c, § 13 ods. 2, § 18, § 67 písm. f, § 68 písm. d
- Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Národná rada Slovenskej republiky, via Slov-Lex · § 35 ods. 6 písm. e a g
- Zákon č. 200/2022 Z. z. o územnom plánovaní · Národná rada Slovenskej republiky, via Slov-Lex · § 16 ods. 4, § 18 ods. 1
- Zákon č. 24/2006 Z. z. o posudzovaní vplyvov na životné prostredie a o zmene a doplnení niektorých zákonov · Národná rada Slovenskej republiky, via Slov-Lex · § 3 písm. a, Príloha č. 9 časť III bod 2