Why plan a family house barrier-free from the start?
A family house is built for decades, and the household changes in that time. Children grow up, parents get older, someone breaks a leg and a grandfather visits with a walking frame. A house that allows for these situations from the first sketch makes ageing in place possible and needs no demolition later.
- Injury or illness: even a short loss of mobility turns stairs, narrow doors and a shower tray into obstacles.
- Ageing: a person who wants to stay in their own house needs an entrance, a room and a bathroom without steps.
- Visitors: a parent or a friend in a wheelchair gets in without help.
- Small children: a step-free entrance and wide doors also make the trip with a pram easier.
This approach is called universal design. Article 2 of the UN Convention on the Rights of Persons with Disabilities defines the term, and Slovakia published the convention as 317/2010 Z. z. A barrier-free family house is therefore not a house for one specific person. It is a house in which nothing stands in the way of anyone in the household. The barrier-free house entry explains the term in more detail.
There is also a financial reason. The state contributes to the adaptation of a family house for a person with a severe disability. Only changes to existing equipment count as an adaptation. Building a new bathroom or WC does not count (Act 447/2008 Z. z., § 37 ods. 3). The household therefore pays for a new bathroom or WC itself.
Do Slovak rules require a family house to be barrier-free?
As a rule, no. The Building Act 25/2025 Z. z. requires barrier-free use for two kinds of building. These are a structure for general use and a building that the public will visit (§ 18 ods. 1). An ordinary family house is neither. The same holds for refusing a building intent. The act ties refusal for missing barrier-free requirements to the same two kinds of structure (§ 59 ods. 1 písm. d).
The details are still set by Decree 532/2002 Z. z. The act keeps it in force until new implementing regulations take effect. The latest date is 31 March 2027 (§ 84 ods. 23 písm. b). The Office for Spatial Planning and Construction is to issue the new decree on barrier-free use of buildings (§ 83 písm. d).
Part four of the decree applies to a family house only if a person with reduced mobility and orientation is to use it. The decree calls it a special-purpose family house (§ 56 písm. c). For such a house:
- the main entrance of a new building must be level with the footpath, without steps (§ 57 ods. 1). If that is not possible, a ramp, a stair platform or an outdoor lift bridges the difference (§ 57 ods. 2),
- a multi-storey house without a lift must have at least its entrance floor accessible without barriers (§ 59 ods. 2),
- the laundry, drying room, cellar and similar spaces must be accessible and usable for that person (§ 61 ods. 1).
From 1 January 2027, amending Act 243/2026 Z. z. adds a list of general technical requirements to the Building Act. One of them is safety and accessibility in use, operation and maintenance (Art. I point 68, new § 19 ods. 1 písm. e). The dimensions in this article therefore come from Decree 532/2002, which applies today.
Which dimensions matter most in a barrier-free house?
Even where a house does not have to be barrier-free, the annex to Decree 532/2002 is the most useful list of dimensions. For example, the circle with a diameter of 1,500 mm comes from the space needed to turn a wheelchair through 360° (annex point 2.4.1). This wheelchair turning space is the basic yardstick of the whole design.
| Element | Value | Decree 532/2002 |
|---|---|---|
| Turning space | Circle with a diameter of 1,500 mm | Annex 2.4.1 |
| Area in front of the entrance, door opening inwards or sliding | At least 1,500 × 1,500 mm | Annex 1.6.1 |
| Area in front of the entrance, door opening outwards | Width 1,500 mm, length 1,500 mm + door leaf width | Annex 1.6.1 |
| Entrance door | Opening of at least 900 mm | Annex 1.6.2 |
| Interior doors | Clear width of at least 800 mm, in housing for a wheelchair user a width of 900 mm and sloped grab rails on both sides | Annex 2.2.1 |
| Threshold | At most 20 mm | Annex 2.2.2 |
| Level difference on a horizontal indoor route | Reduced to 20 mm | Annex 1.2.1 |
| Main corridor and staircase of a family house | Clear width 900 mm, headroom 2,100 mm | § 45 ods. 3 |
| Ramp | Width of at least 1,300 mm, gradient at most 1 : 12 | Annex 1.3.9 |
| Handrails of ramp and staircase | On both sides at a height of 900 mm | Annex 1.3.1 |
| Shower area for a wheelchair user | At least 1,400 × 1,400 mm, floor-to-base difference at most 20 mm | Annex 2.3.7 |
| Toilet cubicle in a new building | At least 1,600 × 1,800 mm | Annex 2.3.1 |
| Lift car | At least 1,100 × 1,400 mm, door at least 800 mm | Annex 1.7.2 and 1.7.3 |
Watch two things. The decree requires a 1,500 mm corridor width only where the corridor leads to a space for the public (annex 2.4.7). A family house is not such a space. And clear door width is not the width of the structural opening or the frame, so check it in the manufacturer's data when you choose doors.
How should the entrance, corridor and bathroom be designed?
The table says how much space is needed. The design decides where that space goes. The points below are design recommendations, not requirements of the rules.
Entrance
A step-free entrance means that the ground-floor level and the ground in front of the door are planned together with the foundations and drainage. A threshold level with the paving needs a drainage channel in front of it. A canopy above the door keeps water away from it. If a level difference remains, an access ramp helps. At a gradient of 1 : 12, however, it needs 1,200 mm of length for every 100 mm of height. It is better to reduce the difference when you place the house on the plot.
Corridors and doors
The 900 mm width in § 45 ods. 3 is the minimum for the main corridor of any family house, not comfort. Where a wheelchair turns or approaches a door from the side, more space is needed. A simple test: draw a 1,500 mm circle on the plan in front of every door that opens towards you. Check that it fits. Pocket sliding doors save the area that a swinging leaf would otherwise take.
Bathroom
The biggest difference comes from a shower without a tray, a wet-room shower with the floor falling to a drain. For the shower area of a wheelchair user, the decree allows a difference between floor and base of at most 20 mm (annex 2.3.7). Next to the toilet bowl there should be a clear area 800 mm wide for transferring from the wheelchair (annex 2.3.1). Grab rails can be fitted later if the wall has blocking ready to carry them.
A bungalow, or a two-storey house with a lift?
A bungalow has everything on one level and needs no staircase. It needs a larger footprint. The article Bungalow or two-storey house? compares both forms. A two-storey house can serve for life. For that, the ground floor needs a room that can work as a bedroom and a bathroom next to it. If someone also has to reach the upper floor, lifting equipment comes in.
Act 447/2008 Z. z. lists it: stair climber, hoist, inclined stair platform, vertical stair platform, lift and ceiling hoist (§ 33 ods. 2). For the design of a house, these options matter most:
| Solution | What the house needs | What the rules say |
|---|---|---|
| Room and bathroom on the ground floor | Extra rooms on the ground floor, no equipment | Special-purpose house without a lift: barrier-free entrance floor (532/2002, § 59 ods. 2) |
| Stairlift or inclined platform | A stair flight along which the rail runs, and free space at the start and the end | An inclined stair platform is lifting equipment (447/2008, § 33 ods. 2) |
| Vertical platform | Stacked space on both floors and an opening in the floor slab | At a speed of up to 0.15 m/s, Government Regulation 235/2015 Z. z. on lifts does not apply (§ 1 ods. 4 písm. a) |
| Home lift | A shaft sized to the manufacturer's data and a power supply | A lift permanently installed in a building falls under Regulation 235/2015 (§ 1 ods. 2); car for a wheelchair at least 1,100 × 1,400 mm (532/2002, annex 1.7.3) |
Which solution wins also depends on the shape of the staircase. For structures under § 56, the decree requires straight flights if they are the only access (annex 1.3.4). The rail of an inclined platform also narrows the free width of the flight. The article Staircase in a family house covers pitch, flights and landings.
What is an adaptable house and what should be prepared in advance?
An adaptable house does not have to be barrier-free on the day of the final inspection. It is enough that it can be adapted without demolishing load-bearing walls. As design advice, these preparations help:
- a ground-floor room with a window and direct access to a bathroom, used today as a study or guest room,
- stacked wardrobes on both floors in the size of a future lift shaft, with a slab between them that the structural engineer prepares for later cutting out,
- blocking in the bathroom and WC walls for future grab rails, marked on the drawing so it can be found,
- one floor level across the whole storey, with no steps between rooms and thresholds of at most 20 mm,
- a socket and free space by the staircase for a future stairlift.
Such preparations are simpler in the design than later works. Their cost depends on the structure and scope, so we do not give a general figure. The article on the layout of a family house shows how to split the ground floor into a day and a night zone so that an extra room makes sense.
Who can contribute to a barrier-free adaptation of a house?
A person with a severe disability can receive a cash allowance. An integrated assessment must show that the person depends on an adaptation of the family house (447/2008, § 37 ods. 1). An adaptation also includes adapting the entrance to the family house and the access to it (§ 37 ods. 2). The condition is permanent residence in the house (§ 37 ods. 4). The amount is a percentage that depends on the price of the adaptation and the income (§ 37 ods. 5).
A separate allowance exists for buying lifting equipment. The purchase also includes installation and the building work needed to operate it (§ 33 ods. 4). The amount depends on the price of the equipment and the income, and the act sets an upper limit (§ 33 ods. 5).