Stairlift
A stairlift is a powered seat or platform that travels along a rail fixed to a staircase, carrying one person up and down the flight.
What is a stairlift?
A stairlift is a powered seat, perch or wheelchair platform that travels on a rail fixed to the wall or to the staircase itself. The rail follows the line of the flight, so one person can travel up and down without a lift shaft or a new floor opening. The UK Disabled Living Foundation describes stairlifts as powered lifts on wall or stair-fixed tracks that follow the stairs. Straight and curved tracks suit different stair shapes. The same factsheet says stairlifts are usually cheaper to install than through-floor lifts, because building alterations are not normally needed.
Three forms are in common use. The table sets out which person each one suits and what it asks of the stair.
| Type | Suits a person who | What it needs from the stair |
|---|---|---|
| Seated | can sit down and get on and off the chair | Clear width for the seat, knees and feet. The most common form in homes. |
| Standing or perching | can walk to the lift and stand or perch while travelling | Headroom from the top to the bottom of the flight. The factsheet lists it as an option for an exceptionally narrow stair. |
| Wheelchair platform | cannot transfer out of a wheelchair | A large footprint on the stair. The factsheet notes that many domestic stairs are too narrow for it. |
What does a stairlift need from the staircase?
The first check is width. The UK factsheet says most people need a staircase of about 740 mm to use a seated stairlift safely and in comfort. The decree 532/2002 Z. z. gives no stairlift width. Its § 27 ods. 2 leaves the passage width of a flight to the Slovak technical standard, which this page does not quote. For a family house, § 45 ods. 3 says the main stair should have a clear width of at least 900 mm and an auxiliary stair at least 750 mm. Treat the factsheet figure as a starting point. Take the minimum from the manufacturer's data for the model you are considering.
A simple test is to sit on a chair at the foot of the flight with its back against the wall. Then see how much room the feet and knees have. Most seats face sideways, but a narrow stair may need a seat that faces forward. Some suppliers recommend boxing in open banisters so that feet cannot catch between them.
Other points to check before ordering:
- The rail should cover the whole flight. The factsheet advises that the rail covers the whole staircase. If a few steps lead to a sub-landing at the top, a supplier may propose a folding platform. This causes problems when someone else walks up the stairs with the platform down.
- The structure takes the rail fixings and the weight of the carriage. The structural engineer should check the fixing points on the flight and the wall.
- Power. The factsheet says most stairlifts have rechargeable batteries. Charging points at the top or bottom of the stairs recharge them, and the lift keeps working in a power cut. The chair must stand at a charging point when not in use, and the batteries need replacing in time. Plan a socket at the charging point.
- Weight. The factsheet gives 160 kg as the generally quoted limit for a standard heavy-duty model. Capacity is lower on a curved track, and models with greater capacity may only cater for straight stairs.
Straight or curved rail: which one fits the stair?
A straight rail serves a single flight. A curved rail follows a stair that turns, and curved tracks exist for the various shapes of staircases. Straight tracks are significantly cheaper than curved ones, so the shape of the staircase is one of the first choices to settle.
Where a stair has two straight flights with a landing between them, two straight stairlifts can cost less than one curved stairlift. The factsheet adds one condition: the user must be able to transfer from one to the other. A curved track also changes the weight limit described above, so the user's weight should be checked against the model that is chosen. At the design stage, the landing is where the rail changes direction. Draw that point on the plan before the stair is fixed.
How is a stairlift different from a platform lift?
A stairlift stays on the line of the flight. A vertical lift moves up through the floors, which is a different design decision and a different building project. The table compares the two devices that follow a stair flight with the lift that moves through the floors.
| Device | Route | Building work and notes |
|---|---|---|
| Stairlift | Along the stair flight, on a rail | Usually no building alterations. The factsheet says it can usually be installed in a day. |
| Vertical or through-floor lift | Vertically, through the floors, see home lift | Usually needs building alterations. The factsheet describes it as the costlier option for that reason. |
| Inclined stair platform (šikmá schodisková plošina) | Along the stair flight, on a platform | Named as a separate lifting device in 447/2008 § 33 ods. 2. The factsheet does not describe it. |
What does Slovak law say about stairlifts?
Act 447/2008 Z. z. on monetary contributions for severe disability defines a lifting device in § 33 ods. 2 as equipment for a person with reduced mobility, used to overcome architectural barriers. The act lists these lifting devices in particular. They are the stair climber (schodolez), the hoist (zdvihák), the inclined stair platform, the vertical stair platform, the lift (výťah) and the ceiling hoist. The act does not name a chair stairlift.
Under § 33 ods. 1 an office may pay a cash contribution towards buying a lifting device. The person must have a severe disability, and the integrated assessment must show that the person needs the device. The contribution is possible only where public health insurance does not provide or lend the device. The purchase includes the installation and any building work that the installation needs (§ 33 ods. 4). For building work, the person must have permanent residence in the flat or house. The amounts and eligibility rules sit in the act, and this page does not restate them.
Decree 532/2002 Z. z. (version 1 March 2020) governs the stair itself. Act 25/2025 Z. z. keeps the decree in force until new implementing regulations take effect, at the latest until 31 March 2027 (§ 84 ods. 23 písm. b). The decree's § 27 ods. 3 requires equal riser heights within one flight and allows at most 16 steps per flight, or 18 for an auxiliary stair. Its § 27 ods. 4 limits the slope of a main stair to 35 degrees. The decree sets the stair, not the stairlift, so a stairlift still needs the width check described above.
Can a stairlift be bought second-hand?
The factsheet says it is possible to save money on a second-hand stairlift. It advises buying from a manufacturer or from an authorised company that reconditions stairlifts. Such a seller will have checked that the unit meets current safety standards and will give a warranty. Straight tracks can usually be moved to another house. A curved track cannot be re-sited in the same way, although some models allow a new track to be made to fit a new house.
Frequently asked questions
- Is a stairlift the same as a platform lift?
- No. A stairlift travels along the line of the stair flight on a rail. A vertical or through-floor lift moves up through the floors. It needs more space and some alteration work, says the UK factsheet.
- How wide does a staircase need to be for a stairlift?
- The UK factsheet puts about 740 mm as the minimum width most people need for a seated stairlift. The Slovak decree gives no stairlift width, so take the minimum from the manufacturer for the model.
- Can a stairlift go around a corner?
- Yes, with a curved track. The factsheet says curved tracks cost more than straight ones and that weight capacity is lower on a curve. A landing between two straight flights can sometimes be served by two straight stairlifts instead.
- How is a stairlift powered?
- Most stairlifts have rechargeable batteries. The factsheet says charging points at the top or bottom of the stairs recharge them, and the lift keeps working in a power cut. Plan a socket at the charging point when you design the stair.
- Does Slovak law pay for a stairlift?
- In part. Act 447/2008 Z. z. allows a cash contribution towards buying a lifting device (§ 33 ods. 1), but not where public health insurance provides or lends the device. The act sets the amounts and the rules, and this page does not restate them.
Sources
- Zákon č. 447/2008 Z. z. o peňažných príspevkoch na kompenzáciu ťažkého zdravotného postihnutia a o zmene a doplnení niektorých zákonov · Národná rada Slovenskej republiky, via Slov-Lex · § 33 ods. 1, 2 and 4
- Vyhláška MŽP SR č. 532/2002 Z. z., ktorou sa ustanovujú podrobnosti o všeobecných technických požiadavkách na výstavbu a o všeobecných technických požiadavkách na stavby užívané osobami s obmedzenou schopnosťou pohybu a orientácie · Ministerstvo životného prostredia SR, via Slov-Lex · § 27 ods. 2 to 4; § 45 ods. 3
- Choosing equipment to get up and down stairs · Disabled Living Foundation (livingmadeeasy.org.uk), UK · Stair lifts; Seated stairlifts; Standing and perching stairlifts; Stairlifts with a wheelchair platform; Vertical/through-floor lifts; Second-hand stairlifts; Rechargeable batteries
- Zákon č. 25/2025 Z. z. Stavebný zákon · Národná rada Slovenskej republiky, via Slov-Lex · § 84 ods. 23 písm. b