Home lift
A home lift is a passenger lift in a family house that carries people between floors, usually in a shaft or a fixed frame.
What is a home lift in a family house?
A home lift is a passenger lift installed in a single-family house to carry people, and sometimes goods, between floors. In Slovak practice it is called výťah v rodinnom dome, or domový výťah. Government Regulation 235/2015 Z. z. defines a lift as a lifting appliance that serves different levels. Its carrier moves along fixed guides inclined more than 15 degrees from the horizontal, or along a defined path (§ 2 písm. a). Suppliers offer two basic designs. A shaft lift runs inside a vertical enclosure built into the house. A shaftless unit (bezšachtový výťah) needs no full enclosed shaft, but its frame must still be fixed securely to the structure. How much building work each model needs is in the supplier's data and in the designer's check.
How is a home lift different from a stairlift?
Both serve people who find stairs hard to use, but they solve different problems. A stairlift carries one person along the stairs on a rail. A home lift has a car that a wheelchair user or several people can enter, and it serves every floor it is set up for. The table below compares the two.
| Feature | Stairlift | Home lift |
|---|---|---|
| What it carries | One person on a seat or a platform | People in a car, sometimes with goods |
| Works in the house | Rail fixed to the stairs | Shaft or frame and landing openings |
| Wheelchair use | Wheelchair platform models exist, see the stairlift entry | Car size and door width decide the fit |
| Class in decree 508/2009, annex 1, part II | Group B: stairlift and vertical platform for a person with reduced mobility | Group A: passenger lift that is a permanent part of a building |
Which rules apply to a home lift in Slovakia?
Three questions apply: what kind of equipment the lift is, how the lift is placed on the market, and what works the house needs. The answers differ from one design to another, so the table lists each rule and what it says for a home lift.
| Rule | What it says | What it means for a home lift |
|---|---|---|
| Lifts Directive 2014/33/EU and Government Regulation 235/2015 Z. z. | They apply to lifts that permanently serve a building and carry persons, persons and goods, or goods where the carrier is accessible and has its controls inside. They do not apply to lifting appliances with a speed not greater than 0.15 m/s. | The rated speed is the first thing to check in the supplier documentation. The exclusion removes a unit from this directive only. It does not tell you which other rules apply, so ask the supplier which rules the unit was built to. |
| Decree 508/2009 Z. z. | It sorts equipment into groups A, B and C. Groups A and B count as regulated technical equipment (vyhradené technické zariadenie). A revízny technik carries out the routine inspection and test (§ 9 ods. 1 písm. c). | A passenger lift in a building is in group A. The decree comes from the work-safety act and does not say whether a private family house is covered, so ask who the operator duties fall on. |
| Decree 532/2002 Z. z. | It asks for a lift in an apartment building with more than four above-ground floors (§ 33 ods. 2). It asks that lift equipment is acoustically isolated from living space (§ 33 ods. 6). | A family house is not covered by the lift requirement, so the lift is optional. The noise rule is in the part that applies to all kinds of building (§ 2 ods. 2), so plan for it. |
| Building Act 25/2025 Z. z. | A building intent decision is the default for a change to a completed building and for alterations. Some works need only a notice, and some need neither (§ 18 ods. 2, 3 and 5). | Shaft work, changes to the structure or to the outside of the house are checked with the building office before work starts. |
The regime above is the one in force since 1 April 2025. Decree 532/2002 stays in force until new implementing rules take effect, at the latest until 31 March 2027 (Building Act, § 84 ods. 23 písm. b).
What building work does a home lift need?
The building work depends on the design. A shaft lift needs a vertical enclosure, a pit and headroom as the supplier specifies, and openings framed in each floor slab. The designer should check that the slabs and walls can carry the loads and the openings. A shaftless unit reduces the enclosure but still needs a fixed frame, a landing at each level and a power supply in the right place. Noise and vibration matter in a family house, because the car and its drive can run close to bedrooms. Decree 532/2002 Z. z. asks that the machine room is placed so that the noise in the nearest living room meets the hygiene rules (§ 33 ods. 5) and that the lift equipment is sufficiently isolated from living space (§ 33 ods. 6).
What size must a lift be for a wheelchair user?
Annex point 1.7 of decree 532/2002 Z. z. sets the dimensions of a lift for people with reduced mobility. For a special-purpose family house, § 59 ods. 1 sends access to annex point 1, so these values apply to it. In another family house they are a good reference. The values are:
- free space in front of the lift door of at least 1,400 x 1,400 mm (1.7.1),
- entrance door of the car and the shaft at least 800 mm wide (1.7.2),
- car at least 1,100 mm wide and 1,400 mm deep (1.7.3),
- controls with the lower edge at most 1,200 mm above the floor, and a small fold-down seat near the control panel (1.7.4),
- car floor that is level, not textile, and non-slip (1.7.5),
- grab rails on the inner perimeter of the car at 750 mm and 900 mm (1.7.6),
- a call button at 900 to 1,200 mm above the floor (1.7.9),
- a difference of at most 20 mm between the car floor and the corridor floor after the lift stops (1.7.10).
A small home lift unit may or may not reach these sizes. The supplier's data for the model shows the real car size.
How does a home lift fit a barrier-free house?
A home lift solves the change of level, but it works only if the rest of the route works too. The landing needs room to turn, the car door needs a usable width, and the entrance to the house should be level or ramped. Designers usually check these together with the wheelchair turning space, the clear door width and any access ramp. The broader approach is described under universal design.
What should you check before ordering a home lift?
- The rated speed and the rules the unit was built to, in the supplier documentation.
- Whether the designer has checked the structure, the pit and the landing openings.
- The written view of the building office on whether the planned works need a notice or a building intent decision.
- Who is the operator of the lift, and who will inspect and test it.
- The noise isolation of the drive and the equipment room from bedrooms.
- Whether the car, doors and landings fit the people who will use the lift every day.
What should you not assume about a home lift?
Do not assume that a shaftless lift needs no permit. A supplier may say so, but the building office decides. The Building Act makes the building intent decision the default unless the act says otherwise (§ 18 ods. 2). Do not assume that a home lift is a stairlift with a larger seat. The two sit in different groups of decree 508/2009, and they differ in how they are built and what they carry. Do not assume that a slow lift is free of rules. The 0.15 m/s exclusion removes a unit from the Lifts Directive only.
When is a home lift worth planning early?
A home lift is easiest to plan during design. Then the shaft or frame can sit inside the house plan, and you can set the floor openings before the slabs are poured. Adding one later to a finished house also needs the structural check and the question to the building office. It is easier to settle both at the start. Planning it early also lets the designer place the equipment room away from bedrooms and keep the route to the lift level.
Frequently asked questions
- Is a home lift mandatory in a family house?
- No. Decree 532/2002 Z. z. asks for a lift in an apartment building with more than four above-ground floors (§ 33 ods. 2) and names no such duty for a family house. A home lift is an optional addition. In a special-purpose family house with several floors and no lift, the entrance floor must be accessible without barriers (§ 59 ods. 2).
- Does a home lift need a building permit?
- It depends on the works. Under the Building Act (25/2025 Z. z.), a building intent decision is the default for a change to a completed building and for alterations. The act can say otherwise (§ 18 ods. 2). Paragraph 3 lists works that need only a notice and paragraph 5 lists works that need neither. Ask the building office before you cut a shaft, change the structure or change the outside of the house.
- Is a home lift regulated equipment?
- The equipment type is. Decree 508/2009 Z. z. puts a passenger lift that is a permanent part of a building in group A. It puts a stairlift or vertical platform for a person with reduced mobility in group B. Both groups count as regulated technical equipment. The decree comes from the work-safety act and speaks of employers and entrepreneurs (§ 8). It does not say whether a lift in a private family house falls under it, so ask the supplier or a revízny technik.
- Which speed does the Lifts Directive exclude?
- Lifting appliances whose speed is not greater than 0.15 m/s fall outside the directive (Article 1(2)(a)). Slovak Government Regulation 235/2015 Z. z. repeats this (§ 1 ods. 4 písm. a). The rated speed in the supplier's documentation shows whether a unit is excluded.
- How big must the car of a home lift be for a wheelchair?
- Annex point 1.7 of decree 532/2002 asks for a car at least 1,100 mm wide and 1,400 mm deep. The door must be at least 800 mm wide. The decree applies this to the buildings it covers, which include a special-purpose family house. In another family house it is a reference, and the supplier's data for the model decides what fits the shaft.
- Does a shaftless home lift need a shaft?
- A shaftless unit needs no full enclosed shaft, but it still needs a fixed frame that the structure carries. A shaftless design does not by itself remove the questions about the building procedure and the lift rules. Ask the building office and the supplier.
Sources
- Directive 2014/33/EU of the European Parliament and of the Council on lifts, Article 1 (scope and exclusions) · legislation.gov.uk (copy of the EU text as adopted) · Article 1(1) and 1(2)(a)
- Nariadenie vlády SR č. 235/2015 Z. z. o uvádzaní výťahov na trh a sprístupňovaní bezpečnostných častí do výťahov na trhu · Vláda Slovenskej republiky, via Slov-Lex · § 1 ods. 2 and 4 písm. a), § 2 písm. a)
- Vyhláška MPSVR SR č. 508/2009 Z. z. ktorou sa ustanovujú podrobnosti na zaistenie bezpečnosti a ochrany zdravia pri práci s technickými zariadeniami tlakovými, zdvíhacími, elektrickými a plynovými a ktorou sa ustanovujú technické zariadenia, ktoré sa považujú za vyhradené technické zariadenia · Slov-Lex (Ministerstvo práce, sociálnych vecí a rodiny SR) · § 4 ods. 1 a 2, § 8, § 9 ods. 1 písm. c), príloha č. 1 časť II A písm. c) bod 1 a B písm. i)
- Vyhláška MŽP SR č. 532/2002 Z. z. o podrobnostiach o všeobecných technických požiadavkách na výstavbu a o všeobecných technických požiadavkách na stavby užívané osobami s obmedzenou schopnosťou pohybu a orientácie · Ministerstvo životného prostredia SR, via Slov-Lex (binding PDF) · § 2 ods. 2, § 33 ods. 2, 5 and 6, § 56 písm. c), § 59 ods. 1 and 2, príloha bod 1.7.1 to 1.7.10
- Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Národná rada SR, via Slov-Lex · § 18 ods. 2, 3 and 5, § 84 ods. 23 písm. b)