Wheelchair turning space

A wheelchair turning space is a free floor circle, 1,500 mm across, that lets a wheelchair user turn the chair around in a room.

What is a wheelchair turning space?

A wheelchair turning space is a free floor area, shaped as a circle 1,500 mm across. A wheelchair user can turn the chair round in it. Slovak Decree 532/2002 Z. z. calls it manipulačný manévrovací priestor and takes the diameter from the basic dimension needed to turn a wheelchair through 360 degrees. The decree describes the space as free floor between the walls of a room and between its fittings. A cupboard, a radiator or a washing machine that stands inside the circle takes away part of it.

The circle is therefore a plan measure. You check it on the drawing, with doors, fittings and furniture included, and not in the empty room.

Which buildings need a turning space?

An ordinary family house does not need one by default. The Building Act 25/2025 Z. z. sets barrier-free requirements for a structure intended for general use and for a building that the public will visit (§ 18 ods. 1). A family house is neither. Part four of the decree applies to a family house only where a person with reduced mobility and orientation is to use it. The decree calls such a house a special-purpose family house (§ 56 písm. c).

The same part four covers apartment buildings and other residential buildings (§ 56 písm. a). It covers an apartment used by such a person (§ 56 písm. b). It also covers the publicly used part of a non-residential building (§ 56 písm. d).

Annex point 2.4.1 defines the circle. The decree text ties annex point 2 to a special-purpose apartment and to the residential part of another residential building (§ 60 ods. 1). For a special-purpose family house it names access to the rooms (§ 59 ods. 1). It also names the laundry, cellar and similar spaces (§ 61 ods. 1). It does not state in so many words that every room of a family house must hold a circle. Treat the circle as the design target for a house planned for a wheelchair user.

BuildingWhen part four of the decree appliesSource
Ordinary family houseOnly if a person with reduced mobility and orientation is to use it532/2002, § 56 písm. c
Apartment building and other residential buildingYes532/2002, § 56 písm. a
Apartment for such a personYes, as a special-purpose apartment532/2002, § 56 písm. b
Publicly used part of a non-residential buildingYes532/2002, § 56 písm. d
Structure for general use or a building open to the publicThe Building Act barrier-free requirements apply25/2025, § 18 ods. 1

Which dimensions go with the turning circle?

The annex to the decree lists the figures that work together with the circle. The table gives the ones this article relies on. The toilet figures matter most in the bathroom, where a wheelchair user needs the most room to transfer.

ElementDecree figureAnnex point
Turning circleDiameter 1,500 mm2.4.1
Toilet cubicle for a wheelchair user, basic figureAt least 1,400 × 1,800 mm2.3.1
Toilet cubicle in a newly designed buildingAt least 1,600 × 1,800 mm2.3.1
Clear area beside the pan800 mm wide, with free access for a wheelchair2.3.1
Distance of the pan from the side wallAt least 270 mm on one side2.3.1

The decree sets the pan at least 270 mm from one side wall. On the other side it needs the 800 mm wide area. It recommends keeping that area on both sides of the pan. The door of such a toilet must open outwards and face the manoeuvring area, with a horizontal handrail on its inner side (annex 2.3.4).

How do you check the turning circle on a plan?

Draw the circle on the plan before you fix the rooms, then test it in each room where a wheelchair user will turn. Circles are easy to misread on paper, so use a template or a drawing tool at the plan scale. At a scale of 1:50, a 1,500 mm circle measures 30 mm on the drawing.

  • Doors: a door that opens into the room takes part of the circle. A sliding door, or one that opens into a corridor, keeps the room area free.
  • Fittings: a washing machine, a radiator, a cupboard or the edge of a bath inside the circle reduces the usable space.
  • Level changes: a step or a raised threshold inside the circle interrupts the floor the chair rolls over.
  • Furniture: loose furniture moves, so draw the circle around the fixed items and keep the rest flexible.

Where does the turning space matter most in a family house?

The entrance hall, the bathroom and the kitchen are the rooms where the circle is hardest to fit. The hall is the first space a visitor in a wheelchair reaches. The swing of the entrance door decides how much of it is usable. In the bathroom, the circle and the toilet transfer area are separate annex figures (2.4.1 and 2.3.1), so test both on the same plan. A wet room shower with a level floor keeps the floor free of a tray edge. In the kitchen, a run of base units along one wall and an appliance at its end can cut into the circle.

As design advice, keep the hall free of fixed fittings until you draw the circle on the plan.

How is a turning space different from clear door width?

A turning space is a floor area for turning the chair. Clear door width is the opening the chair passes through. A room can have a generous circle and still be unusable if its door is too narrow. A wide door does not help a room where the chair cannot turn. Check the two figures separately.

Check the door's clear door width on its own. It is the free opening, not the frame or the structural opening, so take the figure from the manufacturer's data when you choose a door.

How does the turning space fit into universal design?

The turning circle is one measure behind universal design, the approach that plans a house for the whole household rather than for one person. A family house with a circle in the entrance and the bathroom from the first sketch needs no demolition later. Someone may be injured, grow older or visit in a wheelchair. The decree asks for a level area in front of the entrance door. It is at least 1,500 × 1,500 mm if the door opens inwards or slides. If the door opens outwards, the area is 1,500 mm wide and 1,500 mm plus the leaf width long (annex 1.6.1). Plan it together with the circle, also where the entrance uses an access ramp. Decree 532/2002 stays in force until the implementing regulations of the Building Act take effect. The latest date is 31 March 2027 (25/2025 Z. z., § 84 ods. 23 písm. b). Check the figures against the text in force when you design. The wider set of measures is described in the barrier-free house entry, and the ageing question in ageing in place.

Plan the circle on the ground floor first. Later adaptations are easier when the walls, the floor level and the door swings were drawn with the circle in mind.

Frequently asked questions

Does every Slovak family house need a wheelchair turning space?
No, not by default. Part four of Decree 532/2002 Z. z. applies to a family house only where a person with reduced mobility and orientation is to use it (§ 56 písm. c). The Building Act ties barrier-free requirements to structures for general use and to buildings the public will visit (25/2025 Z. z., § 18 ods. 1).
What size is a wheelchair turning space?
The annex to Decree 532/2002 Z. z. (point 2.4.1) describes a circle 1,500 mm in diameter. The diameter comes from the basic dimension needed to turn a wheelchair through 360 degrees.
Does the turning circle have to be completely empty?
The decree describes it as free floor between room walls and between fittings (annex 2.4.1). A fitting inside the circle leaves less free floor. A door that swings into the circle does the same, so draw the circle on the plan together with fittings and door swings.
Is the turning circle the same as the space needed to transfer onto a toilet?
No. They are separate figures in the annex. Point 2.3.1 gives the toilet cubicle, with an 800 mm wide area beside the pan, and point 2.4.1 gives the 1,500 mm circle. A bathroom for a wheelchair user needs both, so test both on the plan.
Can a turning space be added to an existing house?
It depends on the plan, the walls and the doors. Sometimes a door can be changed to slide or swing outward, and sometimes a room must be re-planned. Draw the circle on the existing plan first, and ask a structural engineer before you change any wall.
Will the decree figures change?
Possibly. Decree 532/2002 Z. z. stays in force until the implementing regulations of the Building Act take effect, at the latest until 31 March 2027 (25/2025 Z. z., § 84 ods. 23 písm. b). The Office is to issue a new decree on barrier-free use (§ 83 písm. d). Check the text in force on Slov-Lex before you fix a plan.

Sources

  1. Vyhláška 532/2002 Z. z. o všeobecných technických požiadavkách na výstavbu (príloha, body 2.3.1 a 2.4.1) · Ministerstvo životného prostredia SR, via Slov-Lex · Príloha bod 1.6.1, 2.3.1, 2.3.4, 2.4.1
  2. Vyhláška 532/2002 Z. z. o všeobecných technických požiadavkách na výstavbu (§ 56) · Ministerstvo životného prostredia SR, via Slov-Lex · § 56 písm. a, b, c, d; § 59 ods. 1; § 60 ods. 1; § 61 ods. 1
  3. Zákon 25/2025 Z. z. Stavebný zákon · Národná rada SR, via Slov-Lex · § 18 ods. 1
  4. Zákon 25/2025 Z. z. Stavebný zákon (§ 83, § 84 ods. 23) · Národná rada SR, via Slov-Lex · § 83 písm. d; § 84 ods. 23 písm. b