Ageing in place
An ageing-in-place house is a home planned so its owners can keep living in it as they grow older or their needs change.
What does ageing in place mean?
Ageing in place means that people can keep living in their own home as they grow older. They do not have to move out when their needs change. For a house, the entrance, a bedroom, a bathroom and the route between them must stay usable. That holds when walking becomes harder, after an injury, or from a wheelchair. The idea concerns how the home fits the people in it over the years, not one fixed age.
The WHO Global Network for Age-friendly Cities and Communities describes an age-friendly home. It is a dwelling suitable for use across the life course, for people of all ages. Such a home has features such as level access and a connection to the outdoors. It can take assistive technology that supports ageing in place.
Why plan for ageing in place from the first sketch?
A family house is built for decades, and the household changes in that time. Once the house is finished, changing a level, a doorway or a drain usually means opening finished walls and floors. Most of the decisions that matter are about levels, widths and where services run, and they are easiest to make on a blank plan. Later work is then often limited to fitting grab rails or a stairlift.
The features that matter most are these:
- Entrance: a level or step-free route from the parking place to the door.
- Ground floor: a room that can serve as a bedroom, with a bathroom close by.
- Circulation: corridors and doors wide enough for a walker or a wheelchair.
- Bathroom: a shower without a tray, and wall blocking for grab rails.
- Reserved space: room and cable routes for a future lift or assistive equipment.
What do Slovak rules say about a home for a person with reduced mobility?
The rules do not require every family house to be barrier-free. Act 25/2025 Z. z. applies from 1 April 2025. It ties barrier-free use to structures for general use and to buildings that the public visits (§ 18 ods. 1). Decree 532/2002 Z. z. sets the technical requirements for buildings used by people with limited mobility and orientation. Its part four applies to a family house only when a person with limited mobility or orientation is to use it (§ 56 písm. c). The decree stays in force until new implementing regulations take effect, at the latest until 31 March 2027 (25/2025 § 84 ods. 23 písm. b). Check the current text before you rely on a value. The concept of a barrier-free house describes the design intent.
When the decree does apply, its annex gives the dimensions to check. These are the figures that matter most for an ageing-in-place plan, even when no law obliges you to follow them:
| Element | Value in Decree 532/2002 | Annex point |
|---|---|---|
| Level area in front of the entrance | At least 1,500 × 1,500 mm, plus the leaf width if the door opens outwards | 1.6.1 |
| Clear width of interior doors | At least 800 mm. At least 900 mm in a house with special-purpose flats or another dwelling for a wheelchair user | 2.2.1 |
| Turning space for a wheelchair | A circle with a diameter of 1,500 mm | 2.4.1 |
| Shower for a wheelchair user | At least 1,400 × 1,400 mm, with a height difference of the base at most 20 mm | 2.3.7 |
The figures are minimums, and they are a useful checklist even for a house that is not covered by part four. One rule applies to any family house. The main stair and the corridor should have a clear height of at least 2,100 mm and a clear width of at least 900 mm. An auxiliary stair should be at least 750 mm wide (§ 45 ods. 3). Everything that follows is design advice, not a legal rule.
Which design choices make a house easier to live in for life?
The choices fall into three groups. Level access removes the largest barrier for people with limited mobility. Generous circulation lets a walker or a wheelchair pass. Reserved space and reinforced walls allow later changes without demolition.
Level access
A step-free entrance needs the ground-floor level, the paving and the drainage planned together. A canopy over the door and a drainage channel in front of the threshold keep water away from the floor. Where a step cannot be avoided, an access ramp can bridge it. A ramp takes a lot of length, so it is better to reduce the level difference on the plot itself.
Bathroom and bedroom
A bedroom and a wet-room shower on the same level let the household keep daily routines when stairs become difficult. Build blocking into the walls beside the toilet and the shower, so that grab rails can be fixed later without opening finished tiles. Leave free floor beside the toilet for a transfer from a wheelchair.
Circulation and doors
Choose doors wide enough for the mobility aid the household is likely to use. Check the clear door width, not the size of the opening in the frame. A simple test is to draw a 1,500 mm circle on the plan in front of each door. Sliding or pocket doors save the swing space that a hinged leaf would take.
How does ageing in place differ from universal design?
Universal design is a design approach, and ageing in place is an outcome for one household. Article 2 of the UN Convention on the Rights of Persons with Disabilities defines universal design as designing products, facilities, programmes and services. All people should be able to use them to the greatest extent possible, without adaptation or special design. The Ministry of Foreign Affairs published the convention as notice 317/2010 Z. z. A house built on that principle usually suits ageing in place, but the two terms ask different questions. Universal design asks what everyone can use. Ageing in place asks what this household will need as its members change.
What can be added later, and what must be planned now?
Some changes are cheap to add later, such as a grab rail, a higher toilet seat or a stairlift on a straight flight. Others are costly or impossible without rebuilding. Examples are the entrance level and the main corridor width. Others are the position of the bathroom next to the bedroom and the space for a future lift. Plan the second group now. The table sorts the common features by how easily they can be added later.
| Feature | Easy to add later? | Plan it now |
|---|---|---|
| Grab rails | Yes, if blocking is in the wall | Blocking beside the toilet and shower |
| Stairlift | Often. On a straight flight with space at both ends, building alterations are not normally needed | A straight flight and clear space at the top and bottom |
| Entrance level | No, without reworking the plot and foundations | A step-free route from the parking place |
| Main corridor width | No, without moving walls | Corridor and door widths on the first plan |
| Space for a future lift | Rarely, without cutting through floors | A stacked space reserved in the design |
In a two-storey house, a stacked space that can later hold a home lift is a sound reserve. It avoids cutting through finished floors.
Frequently asked questions
- What does ageing in place mean?
- It means that people can keep living in their own home as they grow older. They do not have to move to a care setting when their needs change. For a house, the entrance, a bedroom, a bathroom and the route between them stay usable with a walker or from a wheelchair.
- Do I need a bungalow for ageing in place?
- No. A bungalow puts everything on one level, but it needs a larger plot. A two-storey house can also work. It needs a bedroom and a bathroom close by on the ground floor, and a reserved space for a future lift.
- Is a stairlift enough to keep a two-storey house usable?
- A stairlift helps when the staircase is the only obstacle. It does not solve a step at the entrance, a narrow bathroom or a bedroom on the upper floor. Check the whole route before you rely on one fix.
- Does Slovak law require ageing in place for a family house?
- No. An ordinary family house does not have to meet the barrier-free dimensions. Part four of decree 532/2002 Z. z. applies to a family house only when a person with limited mobility or orientation is to use it. The decree stays in force until new regulations take effect, at the latest until 31 March 2027.
- What should I ask the architect at the first meeting?
- Ask which rooms will be on the ground floor and how big the level differences on the plot are. Ask where a future lift could go. Ask how a person reaches the entrance from the parking place. The answers decide most of the later cost of changes.
Sources
- Vyhláška MŽP SR č. 532/2002 Z. z., ktorou sa ustanovujú podrobnosti o všeobecných technických požiadavkách na výstavbu a o všeobecných technických požiadavkách na stavby užívané osobami s obmedzenou schopnosťou pohybu a orientácie · Ministerstvo životného prostredia SR, via Slov-Lex · § 45 ods. 3; § 56 písm. c; annex points 1.6.1, 2.2.1, 2.3.7, 2.4.1
- Oznámenie MZV SR č. 317/2010 Z. z. o uzavretí Dohovoru o právach osôb so zdravotným postihnutím · Ministerstvo zahraničných vecí SR, via Slov-Lex · Article 2 (definition of universal design)
- Adding life to years: ten universal design features (age-friendly home) · WHO Global Network for Age-friendly Cities and Communities · Housing domain
- Zákon č. 25/2025 Z. z. Stavebný zákon · Národná rada Slovenskej republiky, via Slov-Lex · § 18 ods. 1; § 84 ods. 23 písm. b
- Choosing equipment to get up and down stairs · Disabled Living Foundation (livingmadeeasy.org.uk), UK · Stair lifts