Clear door width
A clear door width is the free passage a door leaves once its leaf is open, and it decides whether a wheelchair fits.
What is a clear door width?
The svetlá šírka dverí is the width of the free passage through a door opening. It decides whether a wheelchair or a person with a walking frame can pass through. It is not the size of the door leaf and not the width of the wall opening. A door named by its leaf size can give a narrower passage.
Decree 532/2002 Z. z., which sets the accessibility dimensions in Slovakia, uses the term svetlá šírka in annex point 2.2.1 and does not define it. Ask the supplier for the clear opening with the leaf open. Compare it with the figures in the next section, not with the leaf size in the catalogue.
Which door widths does the decree set?
Decree 532/2002 Z. z. gives the door figures in its annex. The table lists only the values read from the consolidated text. Part four of the decree applies to a family house only when a person with reduced mobility is to use it (§ 56 písm. c), so the figures are a design target for that case, see barrier-free house.
| Door or element | Figure in the decree | Annex point |
|---|---|---|
| Interior door | Clear width at least 800 mm | 2.2.1 |
| Door in a house with special-purpose dwellings and in another residential building for a wheelchair user | Width at least 900 mm, with sloped handrails on both sides | 2.2.1 |
| Entrance door | Must open to a width of at least 900 mm | 1.6.2 |
| Threshold | At most 20 mm high, may be rounded | 2.2.2 |
The wording differs between the rules. Point 2.2.1 uses svetlá šírka for the 800 mm figure and plain šírka for the 900 mm figure. Point 1.6.2 asks that the entrance door can open to a width of at least 900 mm. Read the rules separately, and check the clear width of the entrance door with the supplier before you fix the frame size. The door of a toilet for a wheelchair user must open outwards and face the manoeuvring area. It carries a horizontal handrail inside, and its lock must open from outside (annex 2.3.4).
The table lists other door details in the same annex.
| Detail | Figure in the decree | Annex point |
|---|---|---|
| Lock of an entrance door | At most 1,000 mm above the floor | 1.6.3 |
| Handle of an entrance door | At most 1,100 mm above the floor | 1.6.3 |
| Glazing lower than 800 mm | Marking at 1,400 to 1,600 mm | 2.2.3 |
| Door colour | Must contrast with the wall colour | 2.2.4 |
| Door of a toilet for a wheelchair user | Opens outwards, horizontal handrail inside | 2.3.4 |
Why the leaf size is not enough
A leaf can be wide and still leave a narrower gap, because the frame and the stop sit inside the opening. For a wheelchair the gap at the narrowest point matters, not the width printed on the leaf. As design advice, use the clear width that the manufacturer states as the number to design against.
Do the widths apply to every house?
No. The Building Act 25/2025 Z. z. ties barrier-free use to structures for general use and to buildings that the public visits (§ 18 ods. 1). An ordinary family house is neither, so these door widths apply only where part four of the decree covers the house (§ 56 písm. c). Planning to these widths anyway is a design choice. It keeps a later change of use simple, because the doorways already have the right size.
The amending act 243/2026 Z. z. adds safety and accessibility in use, operation and maintenance to the general technical requirements in a new § 19 ods. 1 of the Building Act, from 1 January 2027. The Building Act also tells the Office to issue a regulation on barrier-free use (§ 83 písm. d). Decree 532/2002 stays in force until the implementing regulations take effect, at the latest until 31 March 2027 (§ 84 ods. 23 písm. b), so the figures in the table may be replaced. Check which regulation is in force when you apply.
How should I choose door widths in a family house?
The points below are design advice, not rules from the decree. They reflect what makes a door usable for a wheelchair, a walking frame or a stroller.
- Use the clear width from the supplier as the design figure, and draw the leaf swing on the plan.
- Choose a sliding or pocket door where a swinging leaf would block a narrow hallway or the room behind it.
- Keep the main route to the bathroom and to a ground-floor bedroom at the 900 mm figure, since a wheelchair user needs those rooms first.
- Set thresholds at 20 mm or less, or remove them. Where a level difference remains, a slope must meet the ramp requirements (annex 1.2.2, see access ramp).
- If glazing reaches lower than 800 mm above the floor, the decree asks for a marking at 1,400 to 1,600 mm. It is a band at least 50 mm wide or a row of marks (point 2.2.3). The door colour must contrast with the wall (point 2.2.4).
- Do not make a turnstile or swing door the only access (point 2.2.1).
How is clear door width different from the door size?
Three figures are easy to mix up on a site visit. The clear width is the free passage. The leaf size is the size of the door panel, usually quoted in a product catalogue. The rough wall opening is the gap left in the masonry for the frame, shown on the construction drawings. Only the clear width tells you whether a chair passes. A plan that shows only the leaf size or the rough opening can hide a narrower passage on site. For the wider context of the house, including the turning space in front of the door, see wheelchair turning space.
Frequently asked questions
- Is a 900 mm door required in every house?
- No. Part four of decree 532/2002 applies to a family house only when a person with reduced mobility is to use it (§ 56 písm. c). A house outside that case is not bound by these door figures.
- What is the minimum width of an interior door?
- Decree 532/2002 asks for an interior door with a clear width of at least 800 mm (annex 2.2.1). In a house with special-purpose dwellings, and in another residential building for a wheelchair user, a door must be at least 900 mm wide. It needs sloped handrails on both sides.
- Does the clear width equal the size printed on the door?
- Not necessarily. A catalogue may quote the leaf size or the wall opening. The clear width is the free passage, which the frame and stop can reduce. Ask the supplier for the clear width in writing.
- How high can a threshold be?
- The decree allows a threshold up to 20 mm high. It may be rounded (annex 2.2.2). A larger level difference has to be reduced to 20 mm on a horizontal indoor route (annex 1.2.1). A slope there must meet the ramp requirements, as described in the access ramp entry (annex 1.2.2).
- Can I use a sliding door instead of a hinged one?
- Yes, as a design choice, it saves the floor space a swinging leaf needs. The decree rules out only a turnstile or swing door as the sole access (annex 2.2.1). Measure and plan the clear opening of a sliding door like any other door.
Sources
- Vyhláška MŽP SR č. 532/2002 Z. z., ktorou sa ustanovujú podrobnosti o všeobecných technických požiadavkách na výstavbu a o všeobecných technických požiadavkách na stavby užívané osobami s obmedzenou schopnosťou pohybu a orientácie · Ministerstvo životného prostredia SR, via Slov-Lex · Príloha body 1.2.1, 1.2.2, 1.6.2, 1.6.3, 2.2.1 to 2.2.4, 2.3.4; § 56 písm. c
- Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Národná rada Slovenskej republiky, via Slov-Lex · § 18 ods. 1; § 83 písm. d
- Zákon č. 243/2026 Z. z., ktorým sa mení a dopĺňa zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Národná rada Slovenskej republiky, via Slov-Lex · Čl. I bod 68; Čl. XV
- Zákon 25/2025 Z. z. Stavebný zákon (§ 83, § 84 ods. 23) · Národná rada SR, via Slov-Lex · § 84 ods. 23 písm. b