Site visit

A site visit is the first walk of the architect and the client over a plot to see its terrain, access and surroundings before design.

What is a site visit?

A site visit is the first walk of the architect over the plot, usually with the client, before the design starts. The Slovak name is obhliadka pozemku. It is a working practice of the profession, not a procedure in an act.

The architect looks at the terrain, the access, the neighbouring buildings and the light and noise on the plot. The visit shows the architect which surveys the project needs. It does not replace them. The measured data comes from the geodet, see the topographic site survey.

Why does the designer visit the plot?

The building act makes the designer responsible for the fit of the building with its surroundings and the character of the place (act 25/2025 Z. z., § 35 ods. 6 písm. e). The fit is urban, architectural, technical and operational. The act does not say how the designer learns the place. A visit is the usual way.

The designer is also responsible for the scope of the surveys that the documentation needs, if the type of building requires them. These include geodetic measurements and hydrogeological surveys (§ 35 ods. 6 písm. c). The visit helps the designer decide which of them to order.

What does the architect look at?

The architect records what the eye and the camera can show. This list is practice and no act prescribes it:

  • slope, drainage and the position of existing trees
  • direction of the sun and the wind, views from different points
  • access road, entry points and the state of the plot boundary
  • heights and distances of neighbouring buildings
  • visible overhead lines, poles, meters and manholes
  • existing buildings, ruins and boundary markers
  • noise from roads, rail or industry

The visit gives first impressions only. It does not show the exact position of utilities or of boundaries. The geodet provides the documentation of utilities and the staking of the boundary of the building site (decree 209/2025 Z. z., § 1 ods. 2 písm. d, f). For the character of a place, see genius loci.

When does the visit happen?

The visit comes early. It follows the first talks about the design brief and comes before the surveys and the site analysis. Many clients also ask the architect to visit a plot before they buy it, as part of site due diligence. Order and timing are a matter of the contract, not of an act.

The client gives the designer a technical assignment (technické zadanie). It states the purpose, the operation and the scope of the building (act 25/2025, § 30 ods. 1). The builder also ensures the geodetic work and the other surveys, unless the builder and the designer agree otherwise (§ 30 ods. 2 písm. a, b). Agree in the contract who orders them.

What should the client prepare?

  • Safe access to the whole plot, with a cleared path if the plot is overgrown.
  • The ownership sheet (list vlastníctva) and the cadastral map of the plot.
  • Any earlier surveys, plans or documents on utilities that the client holds.
  • The wishes of the household and the planned use of the building.

The ownership sheet and the cadastral map come from the cadastre. See cadastre of real estate.

Is a site visit the same as an inspection by the building office?

No. The act uses the word obhliadka for inspections by the authority. A site visit by the architect is a private act and no authority takes part.

InspectionWhoWhat the act says
Local inspection (miestna obhliadka)The administrative authority in a procedureThe authority states the date in the notice of the start of the procedure, if it orders one (§ 51 ods. 2). It may combine the oral hearing with the inspection of the plot or building (§ 53 ods. 1).
Inspection for kolaudácia (kolaudačná obhliadka)The authority, with the builder and othersThe authority announces the date within seven working days of a complete proposal. The inspection takes place within 30 days of the announcement (§ 66 ods. 3).

For the permit procedure, see building intent.

Frequently asked questions

What is the purpose of an architect's site visit?
The architect sees the plot, its access and its surroundings and decides which surveys the project needs. It is a practice of the profession. No act prescribes it.
When does the site visit happen?
It happens early, after the first talks about the design brief and before the surveys and the site analysis. The order is a matter of the contract.
Does the visit replace a topographic survey?
No. The visit gives impressions. The geodet measures the terrain, the utilities and the boundary of the building site (decree 209/2025 Z. z., § 1 ods. 2).
What should the client bring or prepare?
Safe access to the whole plot, the ownership sheet and the cadastral map, and the wishes for the building. Bring earlier surveys or plans if you hold them.
Who orders the surveys that the visit shows are needed?
The builder ensures the geodetic work and other surveys, unless the builder and the designer agree otherwise (act 25/2025, § 30 ods. 2 písm. a, b).
Is a site visit the same as a local inspection by the building office?
No. A local inspection (miestna obhliadka) is an act of the authority in a procedure (act 25/2025, § 51 ods. 2, § 53 ods. 1). The architect's visit is private.

Sources

  1. Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Slov-Lex · § 30 ods. 1 a 2, § 35 ods. 6 písm. c a e, § 51 ods. 2, § 53 ods. 1, § 66 ods. 3
  2. Vyhláška Úradu pre územné plánovanie a výstavbu Slovenskej republiky, ktorou sa ustanovujú podrobnosti o postavení a činnosti geodeta pri príprave, zhotovovaní stavby a užívaní stavby a o výkone geodetických a kartografických činností vo výstavbe (č. 209/2025 Z. z.) · Slov-Lex · § 1 ods. 2