Small Wind Turbine (Domestic)
A small wind turbine is a machine that converts wind energy into electricity for a house or other small building, as a wind source.
What is a small wind turbine?
A small wind turbine is a machine that turns wind energy into electricity for a building. Act 309/2009 lists wind energy as a renewable source (§ 2 ods. 1 písm. a). Neither Act 309/2009 nor the Building Act (25/2025) gives a legal definition or size limit for a small wind turbine. The Zelená domácnostiam programme lists wind turbines among supported small devices. It sets a limit of 10.8 kW for an electricity device at a family house.
What decides how much electricity a small wind turbine makes?
Wind speed decides most. The US Department of Energy states that power depends on wind speed raised to the power of 3. A small rise in wind speed gives a large rise in power.
A taller tower reaches higher wind speeds. The same guide gives a rule of thumb. The bottom of the blades should be at least 9 m above any obstacle near the tower. Buildings and trees reduce and disturb the wind.
What average wind speed does a small wind turbine need?
The US Department of Energy guide names an annual average of at least 4.5 m/s for a grid-connected system. It names 4 m/s for an off-grid hybrid system. These are US guidance values, not Slovak rules.
No Slovak official source cited here gives typical wind speeds at house sites, so this entry states none. Ask for measured or modelled data for your plot before you buy.
Can a small wind turbine stand on a roof?
A roof gives poor conditions. The US Department of Energy states that the wind at roof level is turbulent. This can shorten the life of the turbine and reduce its output. The guide rates roof turbines as less cost-effective than a turbine on a tower fixed to the ground.
Does a small wind turbine need a building permit in Slovakia?
The building act does not name wind turbines. It has rules for devices that make electricity, heat or cooling from renewable sources. Act 309/2009 counts wind as a renewable source. These rules apply by installed output.
- Such a device with a total installed output up to 100 kW is a small structure (drobná stavba, act 25/2025, § 2 ods. 4 písm. i).
- Up to 50 kW, the act requires no decision on the building intent and no notification (§ 18 ods. 5 písm. i).
Section 18 ods. 3 lists cases in which other small structures need a notification. Examples are a site less than 2 m from the plot boundary, a protected area or a heritage zone. Work that can endanger health or the environment is another. The text does not say plainly whether these cases override the exemption for devices up to 50 kW. Ask the building office. A notification goes to the building office (stavebný úrad) before the work starts.
Act 243/2026 changes § 18 from 1 January 2027, including ods. 3 and ods. 4. The new ods. 4 requires a notification for a renewable electricity device of 50 kW to 100 kW. This applies if the work is not a building alteration. These paragraphs set limits by installed output, not by tower height. Zoning rules, noise rules and other approvals are not covered here.
Do I need a business licence to sell electricity from a small wind turbine?
No, if the plant has an installed output of up to 11 kW and the producer claims no top-up payment. Act 251/2012 states this in § 4 ods. 4 (version from 1 July 2026). Act 309/2009 gives a priority connection to the distribution system for plants of any output (§ 3 ods. 2). For the billing of surplus electricity, see net metering and feed-in surplus.
Is there a subsidy for a small wind turbine?
Yes. The Zelená domácnostiam programme, run by SIEA, supports wind turbines at family houses. As of November 2026, the rates for a wind turbine are:
| Case | Rate | Maximum contribution |
|---|---|---|
| Base rate | 500 EUR per kW | 1,000 EUR |
| With the 15% increase | 575 EUR per kW | 1,150 EUR |
The base maximum applies from 2 kW.
The increase applies to households that stop using solid fuels. It also applies to zero-emission devices in the area of air quality management. The conditions page lists these further rules:
- The electricity device must have an output up to 10.8 kW.
- The device must be on the list of eligible devices when the household submits the application for the contribution.
- The owner must be a natural person, and the property must not be in business assets.
- The household must run the device for at least 5 years.
Reservations of funds start from 2 November 2026. SIEA confirms them in steps, when reserved funds fall below a minimum limit. Source: zelenadomacnostiam.sk, as served on 4 November 2026. See Zelená domácnostiam, photovoltaic panel and home battery storage.
Frequently asked questions
- How much subsidy does a small wind turbine get in Slovakia?
- As of November 2026, Zelená domácnostiam pays 500 EUR per kW, with a maximum of 1,000 EUR. With the 15% increase it pays 575 EUR per kW, with a maximum of 1,150 EUR (SIEA).
- Does a small wind turbine need a building permit?
- The building act sets exemptions by installed output. Up to 50 kW, the act requires no decision and no notification (act 25/2025, § 18 ods. 5 písm. i). Cases in § 18 ods. 3 can add a notification duty. Ask the building office.
- What size is a small wind turbine?
- Neither Act 309/2009 nor the Building Act (25/2025) defines it. The Zelená domácnostiam programme treats an electricity device up to 10.8 kW at a family house as a small device.
- What wind speed does a small wind turbine need?
- The US Department of Energy names an annual average of at least 4.5 m/s for a grid-connected system. This is a US guide value, not a Slovak rule.
- Can I put a small wind turbine on my roof?
- It is possible to fit one, but a roof gives turbulent wind. The US Department of Energy says this can shorten turbine life and reduce output.
- Do I need a licence to sell electricity from a small turbine?
- Not if the plant has an installed output up to 11 kW and you claim no top-up payment (act 251/2012, § 4 ods. 4).
Sources
- Zákon č. 309/2009 Z. z. o podpore obnoviteľných zdrojov energie a vysoko účinnej kombinovanej výroby a o zmene a doplnení niektorých zákonov · Slov-Lex · § 2 ods. 1 písm. a), § 3 ods. 2
- Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Slov-Lex · § 2 ods. 4 písm. i), § 18 ods. 3 and ods. 5 písm. i)
- Zákon č. 243/2026 Z. z., ktorým sa mení a dopĺňa zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) v znení neskorších predpisov a ktorým sa menia a dopĺňajú niektoré zákony · Slov-Lex · Čl. I bod 62, § 18 ods. 4
- Zákon č. 251/2012 Z. z. o energetike a o zmene a doplnení niektorých zákonov · Slov-Lex · § 4 ods. 4
- Zelená domácnostiam: Podmienky podpory (SIEA) · Slovenská inovačná a energetická agentúra (SIEA) · Základné podmienky podpory pre rodinné domy, tabuľka sadzieb
- Zelená domácnostiam: Harmonogram (SIEA) · Slovenská inovačná a energetická agentúra (SIEA) · Harmonogram
- Small Wind Guidebook · U.S. Department of Energy, WINDExchange · Wind speed and power, tower height, roof mounting, average wind speed
- Zelená domácnostiam II · SIEA