Pergola
A pergola is an open frame of posts and beams with a light roof. Act 25/2025 does not name it, so its category depends on size and fixing.
What is a pergola and how is it different from a carport?
A pergola is an open frame of posts and beams with a light roof of rafters, slats, louvres or glass. It shades a seating area and lets air and light through. A carport is a roofed shelter for a car. Its design centres on the vehicle and its access.
The two are often confused because both are open roofs on posts. The practical test is use. Plan a carport for parking and a pergola for a terrace, a garden seat or a grill area. A pergola can stand over a car space, but then the design brief becomes a carport brief.
How does the Building Act classify a pergola?
Act 25/2025 Z. z. (Stavebný zákon) has no entry for a pergola. The word does not appear in the consolidated text valid from 1 November 2025 to 31 December 2026. Two questions decide how the office treats one.
The first question is whether the pergola is a structure at all. A structure is a construction that is firmly connected to the ground or whose placement needs a prepared base (§ 2 ods. 1). The act lists five ways of firm connection. Three are a solid foundation, fixing by machine parts or welding to a foundation or another structure, and anchoring with piles, ground screws or ropes. The other two are connection to utility networks and placement underground. Posts set in concrete footings meet this test. A frame that stands loose on the ground with no prepared base does not meet it on the text. Ask the building office before you rely on that.
The second question is the size. The act lists ground-level structures fixed to the ground as minor structures (drobné stavby). Their built-up area must not exceed 50 m² and their height 5 m. The examples include shelters (prístrešky) (§ 2 ods. 4 písm. a). The list starts with najmä (in particular), so it is a guide. A pergola inside these limits fits the group. Above 50 m² or 5 m it leaves the group, and the general rule of § 18 ods. 2 applies: a decision on building intent, unless the act says otherwise. The minor structure page explains the category.
Does a pergola need a notification?
Until 31 December 2026 the answer is yes for a pergola in the group above. Section 18 ods. 3 requires notification for the minor structures in § 2 ods. 4 písm. a) to c), wherever they stand on the plot. The minor structure notification page describes the procedure. The authority has 30 days from delivery to verify the project and issue the verifying clause (§ 63 ods. 6). The fee for verifying the project of a minor structure on notification is €50 (act 145/1995 Z. z., položka 59 písm. b) bod 5, version valid from 1 November 2026).
A notified minor structure needs no surveyor to stake it out (§ 42 ods. 1) and no final inspection (§ 66 ods. 1). Building one without a verified project is an offence with a fine from €30 to €3,000 (§ 79 ods. 2 písm. a and ods. 6 písm. b). An open roof is not an exemption. The act sets its limits by area and height.
What if the pergola touches the house?
A pergola fixed to the wall of a house can change the category. An extension (prístavba) is a widening of the footprint of an existing structure that keeps its structural and operational unity (§ 5 ods. 3). An extension is a change to a finished building (§ 5 ods. 1), and a change to a finished building needs a decision on building intent (§ 18 ods. 2). The act does not say where a wall beam turns a pergola into an extension. Ask the office how it reads your design. The covered terrace page covers roofs built out from a facade.
A free-standing pergola is a separate structure. Raise a wall beam fixed into the house wall with the office and with your designer. It also adds load to the wall.
How close to the boundary can a pergola stand?
The 2 m distance in § 18 ods. 3 písm. b) is a notification trigger for a structure on the builder's plot closer than 2 m to the plot boundary. It is not a minimum setback distance. Decree 532/2002 Z. z. says a structure may stand on the plot boundary only if this does not permanently limit the use of the neighbouring plot (§ 6 ods. 2). The decree sets 7 m between houses and 2 m from the common boundary for family houses only (§ 6 ods. 3). It stays in force until 31 March 2027 at the latest (act 25/2025, § 84 ods. 23).
Civil law applies as well. Under § 127 ods. 1 of act 40/1964 Zb. (Občiansky zákonník), an owner must not disturb a neighbour beyond a degree reasonable to the circumstances. The paragraph names shading among the ways to do so. A tall louvred roof close to a boundary is therefore a point to discuss with the neighbour at an early stage.
What changes from 1 January 2027?
Act 243/2026 Z. z. amends the Building Act from 1 January 2027 (Art. XV). The table follows the amending text and is not law before that date.
| Topic | Until 31 December 2026 | From 1 January 2027 | Art. I of act 243/2026 |
|---|---|---|---|
| Group of the pergola | Ground-level structures and assembled products fixed to the ground, up to 50 m² and 5 m, in § 2 ods. 4 písm. a) | Ground-level structures or assembled products, up to 50 m² and 5 m, in § 2 ods. 7 písm. a) | Points 4, 5 and 7 |
| Notification | Always for the groups a) to c) | Only if a condition of § 18 ods. 3 applies, for example a position closer than 2 m to the boundary | Point 59 |
| 2 m boundary condition | A structure or a terrain modification | A structure or a building alteration | Point 60 |
One condition is a building fixed to the ground by a solid foundation (§ 18 ods. 3 písm. d). The act defines a building as a roofed structure that can protect people, animals or things (§ 3 ods. 1). Whether an open pergola counts as a building is a question for the office. If a pergola meets no condition, it needs neither a decision nor a notification (§ 18 ods. 5 písm. k). The technical rules for a safe structure still apply.
What does one manufacturer's technical sheet state?
Pergola suppliers publish their own figures, and they differ between products. The table shows the figures from the technical sheet of one aluminium pergola with a glass roof (PANOGLASS / PANOLEX, Panorea, version 08 2025). The sheet states that the maker builds the whole pergola from extruded aluminium profiles that do not corrode.
| Item | Value in the sheet |
|---|---|
| Maximum roof load | 110 kg/m². The sheet says aluminium pergolas are tested for this snow load |
| Wind resistance | Up to 100 km/h |
| Roof slope | 5 to 6 degrees |
| Drainage | Up to 57 l/min, integrated in the drip edge and led down through the posts |
| Anchoring of posts | Into concrete footings, a concrete slab or any load-bearing structure of timber or steel |
| Anchoring of the wall beam | Into masonry, concrete or any load-bearing structure of timber or steel |
| Free-standing version | Available |
These are not design values for your site. Snow load depends on the location and the roof shape, so ask the supplier for a static calculation for your area. The same sheet asks owners to remove snow regularly and never to leave the roof loaded for long periods. It also asks owners to clear leaves and dirt from the drip edge so that water can drain.
Which materials do pergolas use?
Makers build pergolas from timber, steel or aluminium. Each material needs its own upkeep, so ask the supplier for the care instructions. Protect timber posts from ground moisture and treat the timber on a regular schedule. Coat or galvanise steel and keep the coating intact. For aluminium, follow the supplier's guide. The sheet above asks for lukewarm water, a soap solution and a soft cloth, and it warns against thinners and other chemical cleaners. The covering of slats, louvres or glass changes the shade and the drainage, so choose it for those needs.
Can climbing plants grow on a pergola?
Yes, but plants add weight and wind load. Ask the supplier for the roof load rating and a static calculation before you plant heavy climbers on a roof of slats or glass. A wire rope trellis can carry climbers on the posts or beams. Raise the extra load with the supplier, because the load rating covers the product as designed.
What do owners misunderstand about pergolas?
- An open roof is exempt. The act sets its limits by built-up area and height. An open roof inside 50 m² and 5 m is still notified until 31 December 2026.
- A pergola adds no load to a house. A wall beam fixed to the wall passes loads into it, and climbers add weight and wind load.
- A pergola and a carport are interchangeable. A car needs clearance and a level, durable surface that a seating pergola rarely provides.
- The supplier's rating is a design value. The sheet figures belong to one product. Your site needs its own calculation.
Before you buy, compare the height and the built-up area against the 5 m and 50 m² limits, and measure the distance to the boundary. See also the building act page.
Frequently asked questions
- Is a pergola the same as a carport?
- No. Plan a carport around a parked vehicle and its access. Plan a pergola for a terrace, a seating area or a grill area. A pergola can stand over a car space, but then the design brief becomes a carport brief.
- Do I need a notification for a pergola in Slovakia?
- Until 31 December 2026, a fixed ground-level pergola up to 50 m² and 5 m fits the minor structure group in § 2 ods. 4 písm. a) of act 25/2025 Z. z. That group needs notification (§ 18 ods. 3). The act does not name a pergola, so ask your building office.
- What height keeps a pergola in the minor structure group?
- The limits are 50 m² of built-up area and 5 m of height. A pergola above either limit leaves the group. Then § 18 ods. 2 applies and it needs a decision on building intent, unless the act says otherwise.
- What changes for a pergola from 1 January 2027?
- Act 243/2026 Z. z. removes the rule that always requires notification for this group (Art. I point 59). A pergola then needs notification only if a condition of § 18 ods. 3 applies, for example a position closer than 2 m to the boundary.
- How much snow can a pergola carry?
- It depends on the product and the site. One manufacturer states a maximum roof load of 110 kg/m² for its aluminium pergola and asks owners to remove snow regularly. Ask the supplier for a static calculation for your location.
- Is a pergola attached to the house a covered terrace?
- The act has no entry for either word. A pergola fixed to the house may be an extension if it keeps the structural and operational unity of the house (§ 5 ods. 3). An extension needs a decision on building intent (§ 18 ods. 2). Ask your office.
Sources
- Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Národná rada Slovenskej republiky, Slov-Lex · § 2 ods. 1 and 4, § 3 ods. 1, § 5 ods. 1 and 3, § 18 ods. 2 to 5, § 42 ods. 1, § 63 ods. 6, § 66 ods. 1, § 79, § 84 ods. 23
- Zákon č. 243/2026 Z. z., ktorým sa mení a dopĺňa zákon č. 25/2025 Z. z. Stavebný zákon · Národná rada Slovenskej republiky, Slov-Lex · Čl. I body 4, 5, 7, 59, 60; Čl. XV
- PANOGLASS / PANOLEX, Hliníková pergola, Technický list (ver. 08 2025) · Panorea (manufacturer technical sheet) · Základné informácie, Údržba pergoly
- Vyhláška MŽP SR č. 532/2002 Z. z. o podrobnostiach o všeobecných technických požiadavkách na výstavbu · Ministerstvo životného prostredia SR, Slov-Lex · § 6 ods. 2 and 3
- Zákon č. 40/1964 Zb. Občiansky zákonník · Národná rada Slovenskej republiky, Slov-Lex · § 127 ods. 1
- Zákon č. 145/1995 Z. z. o správnych poplatkoch · Národná rada Slovenskej republiky, Slov-Lex · Sadzobník, Časť V Stavebná správa, položka 59 písm. b) bod 5