Wire rope trellis
A wire rope trellis is a support of tensioned steel cables or mesh, held off the wall on brackets, that carries climbing plants.
A wire rope trellis is a support for climbing plants made of tensioned steel cables or a cable mesh. It is fixed to the wall on stand-off brackets, so the plants grow in front of the wall and not on it. The Vienna guide on facade greening lists rope constructions as a suitable support for twining climbers, and rope grids for tendril climbers. A trellis is one way to build a green facade with climbers that root in the ground.
What is a wire rope trellis made of?
A wire rope trellis has three parts. Anchors are fixed into the wall. Brackets hold the cables at a set distance from the face. The cables or mesh carry the stems. The Vienna guide says that the loads of the plants, wind, snow and ice pass through the substructure and the anchors into the wall. The Czech facade greening guide describes three ways to carry the structure. You can fix it to the wall, hang it from the main cornice, or build it free-standing on its own foundations. Cable diameters, metal grades and bracket designs vary by manufacturer, so check the data sheet of the system you choose.
Metal needs care outdoors. The Czech guide asks for stainless steel or hot-dip galvanised parts, and says paint alone is not enough protection. It also asks for light colours, because dark parts overheat in the sun and can scorch young shoots. The Vienna guide adds that bare metal supports can cause frost damage to plants in winter, so it advises a plastic coating on the metal.
Which climbers can use a wire rope trellis?
The Vienna guide sorts climbers by how they hold on, and each group needs a different support. Twining climbers wind around a support. Tendril climbers grip thin supports with their tendrils. Scramblers brace themselves against horizontal supports with side shoots or thorns. Self-clinging climbers climb without technical aids.
| Growth habit | How it holds on | Support in the Vienna guide | Example |
|---|---|---|---|
| Twining | Winds around the support | Vertical ropes or rods 30 to 80 cm apart | Chinese wisteria (Wisteria sinensis), evergreen honeysuckle (Lonicera henryi) |
| Tendril | Grips the support with tendrils | Grid with 10 to 20 cm mesh | Grapevine (Vitis vinifera), clematis (Clematis) |
| Scrambler | Braces against the support | Horizontal supports about 40 cm apart | Climbing rose (Rosa) |
| Self-clinging | Roots or pads on the wall | No technical aid needed | Common ivy (Hedera helix) |
The table is a starting point. The species and variety must still suit the light and soil of the spot. The guide shows ivy struggling on a rope construction, so a self-clinging climber needs no trellis. For the habit that suits ropes best, see twining climbers.
The Czech guide adds three details for twiners. Grids and nets suit them badly, because the growing stems deform them. Rope or rod diameters from 4 to 50 mm work. Smooth elements let the plants slip. It suggests knots on ropes and profiled bars in place of smooth rods.
How far should a trellis stand from the wall?
The Vienna guide gives minimum distances between the plant structure and the wall. The distance grows with the thickness and woodiness of the stems. It gives the reason as room for the plant: the right gap prevents crowding and heat build-up behind the plants.
| Plant | Minimum distance from the wall | Reason given |
|---|---|---|
| Clematis | 10 cm | Thin shoots |
| Grapevine | 15 cm | Thicker shoots or more maintenance |
| Wisteria | 20 cm | Strong woody growth and thickening |
The Czech guide uses other figures. It reports 8 to 20 cm as the distance that worked in practice. For twining climbers it gives 15 to 30 cm, because growing shoots need free space to wind. It also says the gap should be at least half the maximum stem thickness at the root collar. No gap behind the trellis should be narrower than the thickest shoot will become. In a narrow gap a thickening shoot flattens and presses on the surfaces with a force of about 10 kN or more. Use the larger figure when the sources differ, and check the species.
Can a wire rope trellis be anchored through ETICS insulation?
An ETICS has its render applied directly to the insulation boards with no air gap in between. The Czech guide says a support on an ETICS wall must be anchored into the load-bearing masonry and pass through the insulation. The anchor must not create a thermal bridge or disturb the layers of the system. Every anchor point must be sealed completely, so that no moisture enters the insulation.
The Vienna guide says some render manufacturers offer ETICS systems with components built to carry plant growth. It gives no method for fixing a plant support through insulation. The Czech guide names two ways to avoid anchoring into the wall: hang the structure from the cornice, or build it free-standing.
Fixings for attachments to ETICS show the principle. The fischer TherMax II system is a product for awnings, canopies, balcony railings and similar loads. According to fischer, a cone of glass-fibre-reinforced plastic interrupts the thermal bridge between the attachment and the anchor in the masonry. An elastic EPDM sealing ring protects the fixing against driving rain. The system bridges insulation from 60 to 300 mm in concrete and up to 250 mm in hollow masonry. The press release does not mention climbing plants. A structural engineer must check the load of a plant support, which includes wind on the foliage.
How is a wire rope trellis different from a living wall?
Both systems put plants on a vertical surface, but they differ in where the plants root and what carries them.
- A wire rope trellis carries climbers that root in the ground next to the house. The cables only guide the stems.
- A living wall is a facade-bound system. The Vienna guide describes it as a structure fixed to the facade, with no link between the plant carrier and the natural soil.
- The Czech guide says a modular living wall needs automatic irrigation and fertiliser feed, except in the smallest installations. A trellis needs soil at the foot of the wall for the roots.
What should you check before fitting a trellis to an existing wall?
Start with the wall. The Vienna guide asks for a check of the load capacity of the facade and of the condition of the existing wall. It also names wind, snow and ice loads, and it asks for experts to do the structural calculation. Climbing aids with large plants should be designed for the maximum load, including the foundation.
Look at ventilation too. On a ventilated facade, the Vienna guide says the air inlets and outlets must stay free of growth. It advises against negatively phototropic self-climbers there, because they grow into the ventilation gap. Keep windows, ventilation openings, gutters and downpipes clear of the plants as well. The Czech guide says to plan a clear distance from places where plants must not grow, such as downpipes, lightning conductors and windows.
Next, plan for thick stems. As twining stems thicken, they shorten the ropes and load the anchors. The Czech guide says the lower anchors of ropes for twiners must have slip compensators. For vigorous species such as wisteria, it asks for vertical ropes 50 to 70 cm apart at least. Closer ropes let the stems pull them together.
Frequently asked questions
- Does a wire rope trellis damage the wall?
- It can, if the fixings open the wall or let water in. The Czech guide asks for every anchor point in an insulated wall to be sealed fully and to avoid a thermal bridge. The Vienna guide asks for a check of the wall and its load capacity before anything is fixed to it.
- How far should a wire rope trellis stand from the wall?
- The Vienna guide gives minimum distances of 10 cm for clematis with thin shoots and 15 cm for grapevine. For wisteria, which has strong woody growth, it gives 20 cm. The Czech guide gives 15 to 30 cm for twining climbers. Thicker stems need more room.
- Can I fix a trellis through ETICS insulation?
- The Czech guide says a support on an ETICS wall must be anchored into the load-bearing masonry through the insulation. The anchor point must be fully sealed and must not make a thermal bridge. The Vienna guide gives no fixing method. A structural engineer must check the load of the plant support.
- Which climbers suit a wire rope trellis?
- Twining climbers such as wisteria and evergreen honeysuckle suit vertical ropes. Tendril climbers such as grapevine and clematis suit a rope grid. Scramblers such as climbing rose need horizontal supports. Ivy holds on with its own roots and needs no trellis.
- Why do the ropes need slip compensators?
- Stems that thicken shorten the ropes and load the anchors, which can pull an anchor out. The Czech guide asks for slip compensators on the lower rope anchors for twiners. They let the rope slip once a set force is exceeded.
- Is a wire rope trellis the same as a living wall?
- No. A trellis guides climbers that root in the ground next to the house. A living wall is a facade-bound system with no link to the natural soil. The Czech guide says it needs automatic irrigation and fertiliser feed, except in the smallest installations.
Sources
- Leitfaden Fassadenbegrünung, 3.3 Wuchsformen und geeignete Rankhilfen · Stadt Wien – Umweltschutz · 3.3, table Wuchsformen und dafür benötigte Kletterhilfe
- Leitfaden Fassadenbegrünung, 3.5 Planungsrelevante Pflanzen- und Wuchseigenschaften · Stadt Wien – Umweltschutz · 3.5, Wandabstand der Konstruktion; Physikalische Einwirkungen; Negativer Phototropismus
- Leitfaden Fassadenbegrünung, 4.2 Fassadentypen · Stadt Wien – Umweltschutz · 4.2, Typ 1 (WDVS) and Typ 3 (VHF)
- Leitfaden Fassadenbegrünung, 4.3 Statik · Stadt Wien – Umweltschutz · 4.3, Statik; Vertikale Lasten
- Leitfaden Fassadenbegrünung, 4.14 B Fassadengebundene Begrünung · Stadt Wien – Umweltschutz · 4.14
- Ozelenění fasád. Metodika (Burian S., Dubský M., Vejvara L.) · Svaz zakládání a údržby zeleně, z.s., Brno, 2022 · 6.2.1 to 6.2.4, 6.2.5, 6.2.7, 7.1.2
- fischer TherMax II: press release on fastening attachments to ETICS · fischer Fixing Systems (fischer group) · Product description