Twining climber

A twining climber is a plant that climbs by winding its shoots around thin vertical supports such as ropes, rods or pipes.

What is a twining climber?

A twining climber is a plant that climbs by winding its shoots around a support. It does not hold on to the wall surface. The Vienna city guide for facade greening (Leitfaden Fassadenbegrünung) calls this group Schlinger und Winder. It says they climb with winding shoots and prefer vertical, linear supports. A twiner therefore needs a rope, a rod or a round profile to wind around. This entry covers the twining group only. For plants that hold on to the wall by themselves, see self-clinging climbers.

The Vienna guide names these usual twiners.

  • Wisteria (Wisteria sinensis and Wisteria floribunda).
  • Silver lace vine (Fallopia aubertii).
  • Oriental bittersweet (Celastrus orbiculatus).
  • Hop (Humulus lupulus).
  • Evergreen honeysuckle (Lonicera henryi).
  • Kiwi (Actinidia chinensis).

How does a twining climber hold on to its support?

The shoots coil around the support, and the stem thickens over the years. The Vienna guide describes the thickening of wisteria as particularly strong and shows wisteria wound around a steel beam and around a stainless steel pipe. Thickening is the detail that matters for a building. The guide says growing plant parts can develop enormous forces and widen small gaps. The Czech facade greening guide calls the secondary thickening of stems the biggest design problem for twiners. A thickening stem can deform a structure by pressure and tension. As it shortens a rope, it adds load to the anchors, and the anchors can fail.

Growth speed and height vary widely. The Vienna guide gives Fallopia species as an example of vigorous growth, with 2 m or more a year.

TwinerHeight in the Vienna guide
Wisteria sinensis8 to 30 m, the guide says up to 30 m in optimal conditions
Fallopia aubertii, silver lace vine8 to 15 m
Celastrus orbiculatus, oriental bittersweet12 to 14 m
Actinidia chinensis, kiwi8 to 10 m
Aristolochia macrophylla, Dutchman's pipe8 to 10 m
Lonicera henryi, evergreen honeysuckle6 to 8 m

What support does a twining climber need?

The Vienna guide gives planning figures for the support and its fixings. They describe the support group, not a standard, so check them against the species and the wall in a specific design. The guide names round profiles, rope constructions, pipe constructions and rods as suitable.

Planning item for twinersFigure in the Vienna guideSection
Spacing of vertical supports30 to 80 cm apart3.3 Wuchsformen und Rankhilfen
Diameter of the support0.4 to 5 cm3.3 Wuchsformen und Rankhilfen
Slip-proof fixings along the support0.5 to 2 m apart, depending on twining behaviour, plant strength and surface3.3 Wuchsformen und Rankhilfen
Distance of the construction from the wall for wisteriaAt least 20 cm3.5 Planungsrelevante Pflanzen- und Wuchseigenschaften

The Czech guide adds its own figures. For vigorous species, such as wisteria, it asks for vertical ropes 50 to 70 cm apart at least. For less vigorous species, such as honeysuckle, half that distance is enough. Ropes that stand close together pull the shoots together, and the closer they stand, the larger the forces. It gives 15 to 30 cm as the distance from the wall for twiners, because the growing shoots need free space to wind. Grids and nets suit twiners badly, because they suffer from deformation. Timber battens do not suit wisteria or oriental bittersweet.

The wire rope trellis entry covers how a rope support is usually built.

Why can a twining climber damage a building?

The Vienna guide describes three mechanisms. The first is thickening. Strong twiners can damage building parts through tension, wrapping and growing behind them. The guide says the best prevention is to keep vigorous plants away from such parts with minimum distances and pruning. The second is negative phototropism. Shoot tips of wisteria and of ivy grow away from the light into cracks and gaps, and they widen those openings as they thicken. Young shoots can also grow through small-mesh structures such as grids, perforated metal plates and perforated sheets. Later they die or damage the components as they thicken. The third is location. The guide names gutters, components with joints and glazed surfaces as areas that climbers should not cover.

RiskWhat the guides sayPractical response
Thickening and wrappingPlant parts develop large forces. Damage comes from tension, wrapping and growth behind components.Keep a minimum distance from components and prune regularly
Growth into jointsShoot tips of wisteria and ivy grow into cracks and gapsKeep joints and openings out of the plant's reach
Gutters and downpipesGutters are named among areas climbers should not cover. The Czech guide says oriental bittersweet can crush downpipes.Keep stems and supports away from gutters and downpipes
Ventilated facadeVentilation openings must stay free of growth, and negatively phototropic plants need extra protectionAdd protection, or choose a different planting solution

How does a twining climber differ from a self-clinging climber?

A self-clinging climber climbs without technical aids. The Vienna guide gives it aerial roots or adhesive discs. A twiner needs a support, and its main risk is mechanical: it winds around, thickens and pushes. The guide names both wisteria and ivy as plants with negative phototropism, so both kinds can grow into joints. The Vienna guide also says that mainly self-climbers, and nearly all strong twiners, can damage a building when nobody manages them properly.

What should you check before planting a twining climber by a house?

Start with the building and not with the plant. Check the wall for open joints and loose areas before you fix anything to it. A support is only as sound as its fixing point. With vigorous twiners, the Vienna guide asks for special attention to the stability and fixing of the structure. It also asks for the whole structure to be designed for the maximum load. Keep the stems clear of gutters, downpipes, windows and ventilation openings. On a ventilated facade, the ventilation openings must stay free of growth, so do not train a twiner onto the cladding or near its vents.

Plan the distance by species. The Vienna guide asks for at least 20 cm between the wall and the construction for wisteria. The Czech guide gives 15 to 30 cm for twiners. Other species need their own distances, so check each species before planting. Check the plants every year. The Vienna guide asks for regular checks of climbers with supports, to see early when plants grow over unsuitable areas. Where you plan a green wall instead, the living wall entry describes a different system that needs its own irrigation.

Frequently asked questions

Can a wisteria damage a house?
Yes, according to the Vienna facade greening guide. Strongly thickening stems can develop large forces and wrap around building parts, and wisteria shoots can grow into cracks and joints. The guide's main prevention is a minimum distance from components and regular pruning.
Does a twining climber need a support?
Yes. The Vienna guide says twiners climb by winding their shoots. They prefer vertical, linear supports such as ropes, rods or round profiles. It gives a spacing of 30 to 80 cm for those supports.
How far should a twining climber be from the wall?
The Vienna guide gives at least 20 cm between the construction and the wall for wisteria, which thickens strongly. The Czech guide gives 15 to 30 cm for twiners in general. Check the species before planting.
Can a twining climber grow next to gutters?
The Vienna guide names gutters among the areas that climbers should not cover. The Czech guide says oriental bittersweet can crush downpipes. Keep stems and their supports away from gutters and downpipes, and prune the plant regularly.
Which climbers suit a ventilated facade?
The Vienna guide says that negatively phototropic plants on a ventilated facade need extra protection, and that the ventilation openings must stay free of growth. It does not describe twining climbers on ventilated facades.
What is the difference between a twining and a self-clinging climber?
A twiner winds around a support and can damage a building by winding and thickening. A self-clinging climber holds on with aerial roots or adhesive discs and needs no support. Both kinds can grow into joints.

Sources

  1. Leitfaden Fassadenbegrünung, 3.3 Wuchsformen und geeignete Rankhilfen · Stadt Wien – Umweltschutz · 3.3, table row Schlinger und Winder; Schlinger
  2. Leitfaden Fassadenbegrünung, 3.5 Planungsrelevante Pflanzen- und Wuchseigenschaften · Stadt Wien – Umweltschutz · 3.5 Negativer Phototropismus, Kontrolle und Rückschnitt, Wandabstand, Dickenwachstum, Wuchshöhen
  3. Leitfaden Fassadenbegrünung, 3.4 Eigenschaften und Einsatzmöglichkeiten der verschiedenen Pflanzengruppen · Stadt Wien – Umweltschutz · 3.4, Selbstklimmer; table of usual climbing plants
  4. Leitfaden Fassadenbegrünung, 4.2 Fassadentypen · Stadt Wien – Umweltschutz · 4.2 Typ 3: Vorgehängte hinterlüftete Fassaden
  5. Leitfaden Fassadenbegrünung, 4.3 Statik · Stadt Wien – Umweltschutz · 4.3
  6. Ozelenění fasád. Metodika (Burian S., Dubský M., Vejvara L.) · Svaz zakládání a údržby zeleně, z.s., Brno, 2022 · 6.2.3, 6.2.7, 6.4.3