Living wall
A living wall is a vertical planting system in which plants grow in modules on the wall and are fed by automated irrigation.
What is a living wall?
A living wall is a vertical planting system. Its plants grow in modules of growing medium fixed to the wall, not in soil at the foot of the wall. Each module carries its own plants, and the whole panel is fed by an automated irrigation system. Because the plants sit in the wall itself, the Czech methodology Ozelenění fasád (2022) gives vertical gardens an almost immediate effect. It gives climbers rooted in the ground a slow onset of effect. That is the main difference from a green facade with climbing plants.
The Czech methodology calls these systems vertical gardens and splits them into three groups: shelf systems, modular systems and area systems. Check which system a supplier is offering before comparing quotes, because the same name is not always used for the same construction.
How does a living wall differ from a green facade?
Both systems put plants on a vertical surface, but the way the plants are rooted and fed is different. A green facade grows from the ground and climbs a wall or a support. A living wall holds the plants in a substrate on the wall. That substrate has to be supplied with water and nutrients by the building owner or the installer. The table below sets out the practical differences that drive design and maintenance decisions.
| Aspect | Living wall | Green facade with climbers |
|---|---|---|
| Where the plants are rooted | In modules of growing medium on the wall | In soil or planting beds at the foot of the wall |
| Growing medium | Substrate or substitute substrate with no natural nutrients in some systems | Natural soil |
| Irrigation | Automatic, usually drip | The Vienna guide also recommends automatic irrigation for ground-bound greening, where the larger substrate volume stores more water |
| Fertiliser | Usually supplied through the irrigation system | Usually slow-release depot fertiliser in the soil |
| Support | The modules and their fixing system | Climbers attach themselves, or a wire or trellis holds them |
The comparison shows why the two systems should not be priced or specified as one. A living wall is closer to a building service with plants in it. It needs a mechanical irrigation design, a fixing system that is detailed with the facade, and a maintenance routine. A climber facade has fewer components, but it is slower to establish and depends more on the condition of the wall it climbs.
How is a living wall irrigated?
The Vienna guide, Leitfaden Fassadenbegrünung, describes fully automatic systems as the usual case for façade-bound greening. It says the planning of the irrigation has to be specific to the building and the system. It names drip irrigation as the preferred method. Pressure-compensated drip hoses are described as an efficient current method. The guide also shows the trend moving away from recycled water toward demand-based irrigation. The system then delivers only the water the plants will actually use.
Sensors placed in the substrate can measure the moisture of the greening, and the irrigation programme can then be adjusted to match. The guide says such sensors may need calibrating to the system and must be placed where they give meaningful readings. The Vienna maintenance page says automatic irrigation can be controlled by a timer, or by sensors with a data logger. The guide does not compare the two, so the choice is a judgement for the designer and the owner.
| Figure from the Vienna guide | Value as stated |
|---|---|
| Average flow of drip hose | About 3 litres per hour per running metre |
| Water use of façade-bound greening | Up to 4 litres per square metre |
| Optimal operating pressure | 1.5 to 4 bar |
| Pressure loss with height | About 1 bar per 10 metres of height difference |
The figures are the guide's own, for the systems it describes. They are not a sizing rule for a particular house. Water use will depend on the plants, the exposure of the wall and the irrigation design. The numbers are a starting point for a supplier's calculation, not a substitute for one. The guide gives no watering intervals.
How is a living wall fertilised?
On a living wall, fertiliser is usually linked to the automated irrigation system. The Vienna guide says this applies especially where the growing medium is a substitute substrate, because such substrates contain no natural nutrients. The liquid fertiliser is released into the water circuit as the plants need it. A soil-bound planting, by contrast, usually relies on slow-release depot fertiliser in the ground.
This coupling makes the fertiliser dosing part of the irrigation control. If the water supply stops, the nutrient supply stops too, so the two should be checked together. The guide gives no frequency or quantity for fertiliser on façade systems, so the dosing has to come from the manufacturer of the system. The Czech methodology adds that fertiliser in the irrigation water is the only practical way to feed most vertical gardens.
What maintenance does a living wall need?
The Vienna guide lists the maintenance tasks for façade greening. They include checking and servicing the irrigation, fertiliser supply and substrate, refilling the substrate, and replanting or resowing where plants die. The guide recommends at least one visit a year in spring, and preferably two, in spring and autumn or more often. The maintenance interval depends on the type of greening and the appearance the owner wants.
For a living wall the guide recommends a maintenance contract with a specialist firm. That suits an owner who does not want to manage the irrigation controls and the module replacement personally. The guide does not give a lifespan for a living wall or an interval for substrate replacement. These questions belong in the supplier's specification and guarantee, not in the design assumptions.
Where does a living wall suit a family house?
A living wall works best where the owner will accept an irrigation system and a regular maintenance visit as part of the building. It is a poor choice where nobody will check it. A brief for a living wall should settle an accessible water supply, a drainage route and a fixing system anchored to a suitable surface. These are design questions for the architect and the installer, and they are hard to add later.
Our advice is to decide the purpose first. A living wall on a terrace or a sheltered courtyard can justify its cost by the amenity it gives. A large wall on an exposed elevation needs a sound maintenance plan before it is installed. If you only want a planted wall, consider a facade planter at the foot of a wall or a wire rope trellis. Either may need far less equipment to maintain.
How does a living wall fit into urban greening?
Living walls are one form of urban greening that works on a vertical surface where there is no space for planting at ground level. They sit alongside green roofs, which use the flat roof area, and the two can be planned together on the same building. A living wall adds planting to the building envelope, but it does not replace the planting that a site needs at ground level.
Frequently asked questions
- Is a living wall the same as a green facade?
- No. A green facade grows from the ground and climbs a wall or support. A living wall holds the plants in modules of growing medium on the wall and is fed by an automatic irrigation system. Each system needs a different design and maintenance approach.
- Does a living wall need automatic irrigation?
- The Vienna guide describes fully automatic systems as the usual case for façade-bound greening. It also says the irrigation has to be planned for the specific building and system. Drip irrigation is the method the guide names as preferred.
- How much water does a living wall use?
- The Vienna guide gives up to 4 litres per square metre of façade-bound greening. The same guide gives an average drip hose flow of about 3 litres per hour per running metre. Actual use depends on the plants, the exposure and the irrigation design.
- How often does a living wall need maintenance?
- The Vienna guide recommends at least one visit a year in spring, and preferably two. It also lists substrate refilling, fertiliser checks and replanting as regular tasks. A maintenance contract with a specialist firm is recommended.
- Does a living wall need fertiliser?
- Usually yes, and on façade systems the fertiliser is normally supplied through the irrigation system. Substitute substrates contain no natural nutrients, so the feed matters more. The Vienna guide gives no frequency or quantity, so follow the system manufacturer's dosing.
- How long does a living wall last?
- The sources we read give no lifespan for a living wall, and no interval for substrate replacement. Ask the supplier for the lifespan and guarantee terms in writing and check how the substrate is replaced.
Sources
- Leitfaden Fassadenbegrünung, 4.10 Bewässerung · Stadt Wien – Umweltschutz · 4.10 Bewässerung
- Leitfaden Fassadenbegrünung, 4.11 Nährstoffversorgung | Düngung · Stadt Wien – Umweltschutz · 4.11 Nährstoffversorgung | Düngung
- Leitfaden Fassadenbegrünung, 4.9 Pflegemaßnahmen · Stadt Wien – Umweltschutz · 4.9 Pflegemaßnahmen
- Ozelenění fasád. Metodika (Burian S., Dubský M., Vejvara L.) · Svaz zakládání a údržby zeleně, z.s., Brno, 2022 · Kap. 7 intro and comparison table (pages 46 to 47)