Drip irrigation

Drip irrigation is a network of tubing and emitters that delivers small, slow amounts of water straight to a plant's roots.

What is drip irrigation and why do facade plantings use it?

Drip irrigation (kvapková závlaha) is a network of thin tubing with small outlets, called emitters (kapkovače). The outlets release water slowly at the root zone. The Vienna facade greening guide calls it the preferred method for facade-bound systems, because it suits the site conditions best. It rates drip systems as more efficient than spray heads.

The Czech guide Ozelenění fasád (Svaz zakládání a údržby zeleně, 2022) states that irrigation is practically the only water source for vertical gardens. Fertiliser is delivered the same way. The guide calls fertiliser in the irrigation water the only rationally feasible way to feed vertical gardens, with a possible exception for shelf systems. It makes automatic irrigation part of a living wall except in the smallest installations.

Climbers rooted in the ground need it much less, as explained in green facade.

Which parts make up a drip system, and in what order?

The University of Arizona drip guide lists the parts of a system, each with one job. They are the controller or timer, backflow preventer, valves, filter, pressure regulator, pipe, micro-tubing and emitters. The table below describes them with the extra points that matter on a facade.

PartJob in the systemWhy it matters on a facade
Valve and backflow preventerTurns the supply on and off and stops water flowing back into the supplyGives one point where the facade line can be shut off
Timer or controllerOpens the valves on set days, for set times and at set intervalsSets how often and how long the wall is watered
FilterRemoves particles before they reach the emittersThe Czech guide names dirt as the largest threat to a drip system, so filter checks matter
Pressure regulatorReduces the supply pressure to the level the emitters needBrings the supply pressure down to the level a drip system needs. The Vienna guide adds that height changes the pressure along a wall
Mainline and branch linesCarry water from the source to each planting pointRun along the wall, often with the emitters above the substrate or buried in it
EmittersRelease a small, steady flow at the rootsHave small openings that even small particles can block

Emitters are rated for low pressure. The Arizona guide says drip systems need low pressure of about 1.4 bar. A regulator reduces a supply of 3.4 to 5.2 bar. It lists emitter outputs of 0.5, 1, 2 or 4 US gallons per hour, which is about 1.9, 3.8, 7.6 and 15 litres per hour. It also advises moving emitters out to the edge of the canopy as plants grow, where the roots take up water.

How does height change the water pressure in a facade drip line?

Height is the main pressure problem on a wall. The Vienna guide notes that water pressure falls by about 1 bar for every 10 m of height. It gives an optimal flow pressure of 1.5 to 4 bar. On a line fed from the bottom, the top of a 10 m wall therefore gets about 1 bar less than the bottom.

The Czech guide describes the same effect in pipes. Pressure differs across a run because of the weight of the water column and the friction of the pipe. The lower parts get the higher pressure and pressure falls along the length of the pipe. The guide treats the system's ability to even out these differences as the key to a vertical garden working at all. It says this matters most on large walls.

In practice, the pressure at the top and bottom of the run is checked, not only at the source.

How do you control when and how long a facade system waters?

The simplest control is a timer. The Arizona guide says a controller opens the valves automatically on pre-selected days. The Vienna maintenance page says automatic irrigation can be controlled by a timer or by sensors with a data logger. The irrigation page names a simple automatic timer with physical on-site checks as one way to monitor the system.

The alternative is control by soil moisture. Vienna notes that sensors in the substrate, or in the replacement layers that hold it, can measure the moisture of a facade planting. The watering schedule can then follow that reading. The page adds that the sensors may need calibration and that their position matters, especially in edge zones exposed to wind.

The Czech guide goes further for larger installations. It strongly recommends fitting moisture sensors that signal a fault in good time, especially on larger walls. Irrigation failure is the most frequent, if not the only, cause of large plant losses on a vertical garden.

Why do drip systems clog, and how do you keep them working?

Clogging is the most common technical problem. The Arizona guide says even small particles can block the small openings of an emitter and restrict or stop the flow. The Czech guide names dirt as the largest threat to a drip system and calls for frequent, regular checks of the filters.

Maintenance is more than a filter change. The Czech guide recommends flushing the lines with water while the end caps are open. It also recommends raising the operating pressure from time to time to clear debris. It also describes dissolving mineral deposits with 2 % nitric acid or algae with a 4 % salt solution left overnight. It warns that such chemical treatment can harm plants.

How is drip irrigation different from rainwater harvesting?

The two are often confused, but they answer different questions. Rainwater harvesting is about where the water comes from: it captures rain from roofs and stores it. Drip irrigation is about how the water reaches the plant. A tank can feed a drip line. The Czech guide notes that bringing rainwater from roofs and paved areas is one way to improve soil moisture.

The table compares the main ways a facade planting gets water, using only what the sources say.

MethodHow water reaches the plantWhat the sources say
Drip irrigationSlow release from emitters at the root zonePreferred for facade-bound systems in the Vienna guide, and more efficient than spray heads
Spray hose or fog systemSpray or fine mist from the hose or nozzlesLess common in the Vienna guide, which links fog to cooling the building; its effect depends on the weather
Hand wateringWatering can or hose by handThe Czech guide says small installations, such as a few pockets on a wall, are watered by hand

What are the common misconceptions about drip irrigation on walls?

The first misconception is that a drip line makes a wall self-sufficient. It does not: the Czech guide treats irrigation as a running task. The Vienna guide describes sensors and on-site checks that need someone to act on them. The second is that climbers in the ground need irrigation forever. The Czech guide says climbers planted in the ground need sufficient watering for at least one year after planting. Plants need that time to take hold.

The third is that a drip system can be installed once and left alone. The Czech guide says drip irrigation is more demanding to install and maintain, and that its demands on water quality and filtration are high.

Is drip irrigation covered by a building regulation in Slovakia?

None of the sources here is a legal text, and this article cites no Slovak regulation for drip irrigation.

Frequently asked questions

Do climbers on a facade need drip irrigation?
Usually not once they are established, and the Czech guide lists no regular irrigation as an advantage of climbers rooted in the ground. The Czech guide says climbers planted in the ground need sufficient watering for at least one year after planting. The Vienna guide recommends automatic irrigation for ground-bound greening to keep the plant supplied, but it does not give a watering schedule.
What pressure does a drip line need?
The Vienna guide gives an optimal flow pressure of 1.5 to 4 bar for facade systems. It says pressure falls by about 1 bar for every 10 m of height. The Arizona guide, written for US gardens, says drip systems need low pressure of about 1.4 bar. A regulator reduces a supply of 3.4 to 5.2 bar.
What are the typical emitter flow rates?
The Arizona guide lists emitter outputs of 0.5 to 4 US gallons per hour, which is about 1.9 to 15 litres per hour. These are garden figures from a US extension publication, so check the outputs of the emitters you buy against the manufacturer's data sheet.
What part of a drip system clogs most often?
Dirt that blocks the emitters. The Arizona guide says even small particles can plug the small openings of an emitter, so a drip system needs a filter. The Czech guide names dirt as the largest threat to drip irrigation. It recommends regular checks of the filters and flushing with the end caps open.
Can a drip system run from a rainwater tank?
The sources do not give a rule for tank size or pump capacity. The Czech guide notes that bringing rainwater from roofs and paved areas is one way to improve soil moisture. A tank can supply the line, but its water still needs filtering before it reaches the emitters.

Sources

  1. Ozelenění fasád. Metodika (Burian S., Dubský M., Vejvara L.) · Svaz zakládání a údržby zeleně, z.s., Brno, 2022 · p. 27 (watering for at least one year after planting); ch. 7.4 Závlaha vertikálních zahrad (pressure differences, drip emitters, filters, flushing, moisture sensors, irrigation failure, heating cables, fertiliser by irrigation); ch. 2 (watering of living walls); ch. 7 intro and comparison table; ch. 7.4 (fertigation, chemical flushing, shelf-system exception)
  2. Leitfaden Fassadenbegrünung, 4.10 Bewässerung · Stadt Wien – Umweltschutz (MA 22) · 4.10 Bewässerung
  3. Drip Irrigation: The Basics · University of Arizona Cooperative Extension · Delivery to roots, emitter flow, controller, pressure
  4. Leitfaden Fassadenbegrünung, 4.9 Pflegemaßnahmen · Stadt Wien – Umweltschutz · 4.9 Pflegemaßnahmen