Self-clinging climber

A self-clinging climber is a plant that attaches itself to a wall with its own aerial roots or adhesive pads, without a separate support frame.

What is a self-clinging climber?

A self-clinging climber is a plant that climbs a wall without technical aids. It holds on with aerial roots or adhesive pads. According to the Vienna guide on facade greening, it makes a green facade possible with few building measures. The guide splits the group in two. Root climbers use aerial roots. Disc climbers use adhesive discs.

The guide lists five usual species.

  • Common ivy (Hedera helix), a root climber.
  • Boston ivy (Parthenocissus tricuspidata), a disc climber that can hold even on smooth surfaces.
  • Virginia creeper (Parthenocissus quinquefolia), which forms discs only in some cases and holds weakly.
  • Climbing hydrangea (Hydrangea petiolaris), a root climber.
  • Trumpet vine (Campsis), which depends on the species.

How do self-clinging climbers attach to a wall?

Ivy produces aerial roots along its stems, and the roots let the plant attach to walls, masonry and fences. According to the RHS, the roots cannot bore into sound masonry. They can enter existing cracks and joints and enlarge them as they grow. The Vienna guide describes the same mechanism from the plant side. The shoot tips and adhesive organs of many climbers grow away from the light into crevices. Thickening plant parts can develop large forces and widen small gaps.

The wall surface decides whether the plant holds. The Vienna guide says ivy climbs without help on a sufficiently rough surface. It adds that a self-climber may fail to hold on unsuitable paint or on a heavily sanding surface. Parts of the plant then fall off the facade. The Czech guide asks for a firm, cohesive surface. It says loose, flaking render must be repaired or removed, and it calls smooth lime stucco entirely unsuitable for root climbers. It also says trumpet vine holds reliably on few walls, because it does not root along the whole shoot. The guide suggests a net mounted 3 to 5 cm above the wall as a safety support.

SpeciesHeight in the Vienna guideAttachment and behaviour
Hedera helix, common ivy25 to 30 mAerial roots along the stems. Shoots grow away from the light into joints.
Parthenocissus tricuspidata, Boston ivy15 to 20 mAdhesive discs. Holds even on smooth surfaces.
Parthenocissus quinquefolia, Virginia creeper10 to 15 m in section 3.5, 15 to 20 m in section 3.4The wild form can form discs in some cases but holds weakly. The Engelmannii form is both a tendril climber and a self-climber.
Hydrangea petiolaris, climbing hydrangea10 to 15 mA big plant can detach from the surface under its own weight. Proper anchoring of the shoots usually lets it grow back on.

Do self-clinging climbers damage walls?

They can, but the damage depends more on the wall than on the plant. The RHS says ivy is often reported to damage walls, but in most cases it does not cause structural problems. Its aerial roots often cause damage only when someone removes them with force. The Vienna FAQ gives the same answer for wild vine (Parthenocissus). On technically sound parts of a building it usually does no harm, but open joints, cracks and gutters must stay free of growth.

Damage appears where the wall already has a defect. The RHS lists four cases.

  • The roots enter existing cracks and joints and enlarge them.
  • A covering of ivy on a house with a damp problem can make it worse, because the walls cannot breathe as well.
  • A dense covering can hide damp and other defects, so they get worse unnoticed.
  • A mature, branching ivy can add considerable weight and may destabilise masonry in windy conditions.

The RHS adds one more risk. Mature ivy close to the base of a house wall could cause subsidence problems. This needs an old house with shallow foundations on clay soil. The RHS also notes studies in which an ivy covering eased the effect of frost on plaster and lime mortar. It also shielded the wall from wind-driven rain.

The Vienna guide puts the planning point more bluntly. Mainly self-climbers, and nearly all strong twiners, can damage a building when nobody manages them properly. Sensitive areas such as windows, ventilation openings and roof transitions need enough growth limitation to stay free.

Which walls suit a self-clinging climber?

Suitability depends on the condition of the wall surface, the wall construction and the exposure. The table is a planning aid for the architect, not a list of set requirements.

Wall situationWhat the sources sayBasis
Sound, well-pointed masonryIvy roots cannot bore inRHS
Open joints or cracksRoots enter and enlarge them, so keep them free of growthRHS; Vienna guide FAQ
Damp or already defective wallGrowth can worsen damp and hide defectsRHS
Flaking render, smooth lime stucco, unsuitable paintRepair or remove loose render. Plants may not hold on these surfaces.Czech guide 6.2.7; Vienna guide 3.4
Ventilated facadeAvoid negatively phototropic self-climbers, which grow into the ventilation gap. Keep air inlets and outlets free of growth.Vienna guide 3.5 and 4.2
Render on insulation (ETICS)Some render makers offer systems with components built to carry growth. Ask the maker.Vienna guide 4.2
Masonry above 42 °CProblematic for self-climbersVienna guide 3.5

Before planting, the Vienna guide asks for a check of the facade plaster, and in particular of its quality and intactness.

How is a self-clinging climber different from a twining climber?

A self-clinging climber climbs without technical aids. A twining climber winds its shoots around a support and prefers vertical, linear supports such as ropes, rods or round profiles. Tendril climbers need a support too, and the Vienna guide says the support must match the plant. A wire rope trellis carries twiners and tendril climbers, and the guide shows ivy struggling on a rope construction.

Is a living wall a self-clinging climber?

No. The Vienna guide describes a facade-bound system, such as a living wall, as a structure mounted on the facade. It has no link between the plant carrier and the natural soil. A self-clinging climber roots in the ground and climbs the wall over the years. The Czech guide says a modular living wall needs automatic irrigation and fertiliser feed, except in the smallest installations. The Vienna guide also lists single troughs on the facade, such as a facade planter, as a point-wise facade-bound solution.

How should a self-clinging climber be removed?

Removal can cause more damage than the plant. The RHS says the process can pull away paint and loose mortar. Inspect the wall first, and test a small section to see what condition the wall is in. Then cut and peel the stems away. Start with the outermost stems and work inwards. Avoid pulling large sections off in one go. Leave the main stems attached to their roots in the ground until the end. If you cut them early, the plant is more likely to root into the wall higher up.

Root hairs stay on the wall. The RHS says to remove them with a wire brush, a metal scraper or a pressure washer. Take care not to dislodge paint or mortar. The Vienna guide says adhesive organs can leave remains on the wall after removal. For wild vine, the Vienna FAQ calls the marks a visual effect that does not harm the wall in building physics terms.

To keep ivy out of an area, the RHS reports research on two measures. Two coats of a clear anti-graffiti paint, or a copper or zinc sheet mounted on the wall, completely prevent ivy attachment.

What maintenance does a self-clinging climber need?

The Vienna FAQ asks for one to two maintenance visits a year. For self-climbers such as ivy and wild vine, a visual check for hazards is the base task. Cut the plants back where needed and remove dead parts. Windows, roof structures, gutters and downpipes must stay free of growth. The Vienna guide adds that a mechanical barrier such as an overgrowth strip helps keep the plant away from sensitive areas.

Check the hold of old plants. The Vienna guide warns that hanging or projecting plant mass, which often appears with age, can detach parts of the plant or the whole plant. It shows an ivy that came off under wind, its own weight and poor adhesion.

Can a self-clinging climber stay during a facade renovation?

Yes, with planning. The Vienna guide describes a renovation in the 18th district of Vienna in 2012. The climber was detached from the facade and cut back to the main shoots. During the works it was tied to the scaffold with geotextile and wrapped in a protective cover. Before the end of the works the shoots were anchored to securing points on the facade, so the plant could shoot again and attach.

What mistakes should you avoid with self-clinging climbers?

Check the wall before you plant. Planting on a defective wall or on loose render is the first mistake, because the roots use the defects and the plant may not hold. The second is to leave a dense covering unchecked on a wall with damp, since it can hide the problem. The third is to plant a negatively phototropic self-climber at a ventilated facade. Its growth into the air gap is the real problem there. The fourth is to tear the plant off in large sections, which can pull paint and mortar away with it.

Frequently asked questions

Does ivy damage a brick wall?
Not sound masonry with intact pointing. The RHS says the aerial roots of ivy are unable to bore into sound masonry. They can, however, enter existing cracks and joints and enlarge them as they grow.
Can I grow ivy on a house that already has a damp problem?
It is a risk. The RHS notes that a covering of ivy on a house with a damp problem can make it worse. A dense covering can also hide damp and other defects. Inspect the wall before planting.
How tall does common ivy grow?
The Vienna facade guide gives 25 to 30 m for Hedera helix. Plan for that growth and for the weight of mature stems on the wall. The guide says large self-climbers such as ivy and climbing hydrangea can detach under their own weight.
Can climbing hydrangea grow on a ventilated facade?
The Vienna guide advises against negatively phototropic self-climbers on ventilated facades, because they grow into the ventilation gap. The Czech guide lists climbing hydrangea with the root climbers. It says negative phototropism is most developed in that group. Keep the air inlets and outlets free of growth.
Is removing ivy more damaging than leaving it?
It can be. The RHS warns that removal can pull away paint and loose mortar. Cut and peel the stems from the outside inwards, and do not pull large sections off in one go.
How does a self-clinging climber differ from a twining climber?
A self-clinging climber climbs without technical aids, with aerial roots or adhesive pads. A twining climber winds its shoots around a support, so it needs a rope, rod or round profile to grow on.

Sources

  1. Ivy on buildings and fences · Royal Horticultural Society · Does ivy damage buildings?; What is the easiest way to kill ivy?
  2. Leitfaden Fassadenbegrünung, 3.5 Planungsrelevante Pflanzen- und Wuchseigenschaften · Stadt Wien – Umweltschutz · 3.5: Negativer Phototropismus, Kontrolle und Rückschnitt, Physikalische Einwirkungen, Wuchshöhen
  3. Leitfaden Fassadenbegrünung, 3.4 Eigenschaften und Einsatzmöglichkeiten der verschiedenen Pflanzengruppen · Stadt Wien – Umweltschutz · 3.4, Selbstklimmer
  4. Leitfaden Fassadenbegrünung, 3.3 Wuchsformen und geeignete Rankhilfen · Stadt Wien – Umweltschutz · 3.3, Schlinger, Ranker passages and photo caption
  5. Leitfaden Fassadenbegrünung, 4.2 Fassadentypen · Stadt Wien – Umweltschutz · 4.2, Typ 1 (WDVS) and Typ 3 (VHF)
  6. Leitfaden Fassadenbegrünung, 4.3 Statik · Stadt Wien – Umweltschutz · 4.3
  7. Leitfaden Fassadenbegrünung, 4.12 Sicherung von Kletterpflanzen bei Sanierungsvorhaben · Stadt Wien – Umweltschutz · 4.12
  8. Leitfaden Fassadenbegrünung, 4.14 B Fassadengebundene Begrünung · Stadt Wien – Umweltschutz · 4.14
  9. Fassadenbegrünung. Antworten auf die häufigsten Fragen (2.7 Fünfzehn häufig gestellte Fragen) · Stadt Wien – Umweltschutz · Fragen 3, 14
  10. Ozelenění fasád. Metodika (Burian S., Dubský M., Vejvara L.) · Svaz zakládání a údržby zeleně, z.s., Brno, 2022 · 6.2.1, 6.2.7, 7.1.2