Carport

A carport is a roof on posts or walls that shelters a parked vehicle. Act 25/2025 treats it as a minor structure up to 50 m² and 5 m.

What is a carport?

A carport is a roof on posts or walls that shelters a parked vehicle. At least some of its sides stay open. Act 25/2025 Z. z. (Stavebný zákon) does not define the word. It lists shelters (prístrešky) and garages (garáže) as examples of minor structures (drobné stavby) in § 2 ods. 4 písm. a). A carport and a garage therefore have the same size limit. This page follows the consolidated text valid from 1 November 2025 to 31 December 2026. A later section describes the changes from 1 January 2027.

Does a carport need a notification or a permit?

Until 31 December 2026 a free-standing carport needs a notification to the building authority if it is a minor structure. Section 18 ods. 3 requires notification for the minor structures in § 2 ods. 4 písm. a) to c), wherever they stand on the plot. The group in písm. a) covers ground-level structures fixed to the ground with a built-up area up to 50 m² and a height up to 5 m. A carport inside these limits needs notification. It is not exempt, whatever its distance from the boundary.

Three figures are often mixed up. The table shows what each one limits.

FigureWhat it limitsProvision
50 m² built-up area and 5 m heightGround-level structures such as carports and garages§ 2 ods. 4 písm. a)
25 m² built-up area and 3 m depthUnderground structures such as cellars, tanks and pools§ 2 ods. 4 písm. b)
2 m from the plot boundaryA notification trigger for other minor structures and works. It is not a permit exemption and not a setback§ 18 ods. 3 písm. b)

A carport above 50 m² or above 5 m, or one with a second floor, leaves the minor structure group. The general rule of § 18 ods. 2 then applies: a decision on building intent, unless the act says otherwise. The minor structure page explains the category.

What does a notification involve?

The notification names the builder, the place and the kind of work. It carries cadastre data that let the authority verify ownership of the plot. The attachments are the project for notification and the binding statements of the affected authorities (§ 63 ods. 2). The authority has 30 days from delivery to verify the project and issue the verifying clause. If it does not, the act presumes that it issued the clause (§ 63 ods. 6 and 7). The notified work may start within three years of the verification (§ 63 ods. 10).

The fee for verifying the project of a minor structure on notification is €50 (act 145/1995 Z. z., položka 59 písm. b) bod 5, version valid from 1 November 2026). A notified carport needs no surveyor to stake it out (§ 42 ods. 1) and no final inspection (§ 66 ods. 1). An owner may build it with their own labour if a qualified person leads the work (§ 26 ods. 3). Building it without a verified project is an offence. The fine is from €30 to €3,000 (§ 79 ods. 2 písm. a and ods. 6 písm. b). To remove a structure built on notification, the owner only notifies the authority of the removal period (§ 63 ods. 11).

How close to the boundary can a carport stand?

The act sets no minimum distance for a carport. The 2 m figure only triggers a notification for a structure on the builder's plot closer than 2 m to the plot boundary. For a setback, decree 532/2002 Z. z. applies. A structure may stand on the plot boundary only if this does not permanently limit the use of the neighbouring plot (§ 6 ods. 2). The decree sets 7 m between houses and 2 m from the common boundary for family houses only (§ 6 ods. 3). All distances must still meet the general requirements, including daylight, sunlight, fire safety and maintenance of the buildings (§ 6 ods. 1). The decree stays in force until 31 March 2027 at the latest (act 25/2025, § 84 ods. 23).

The office can also find that the carport could affect the rights of third persons. It then tells the builder that the work may go ahead only on a decision on building intent (§ 63 ods. 5). Ask the building office before you build next to a boundary.

What if the carport joins the house?

A carport that forms a structural and operational unity with the house is no longer a separate minor structure. An extension (prístavba) is a widening of the footprint of an existing structure that keeps its structural and operational unity (§ 5 ods. 3). An extension is a change to a finished building (§ 5 ods. 1) and needs a decision on building intent (§ 18 ods. 2). The same applies to an integrated garage. The act does not say which details of a roof fixed to the house create that unity. Ask the office how it reads your design.

Does a carport count toward the building coverage ratio?

It can. A municipal land-use plan sets the limits of development, including the manner and intensity of land use (act 200/2022 Z. z., § 22 ods. 3 písm. c). The decree on plans defines the building coverage ratio as a limit on coverage by buildings. It defines built area as the projection of the above-ground floors of a building onto the original terrain (decree 392/2023 Z. z., § 2 písm. v and w). The Building Act defines a building as a roofed structure that can protect people, animals or things (§ 3 ods. 1). A roofed carport can therefore fall under that definition. The act gives no national percentage. Ask the planning authority for the extract of the binding part of the plan and for how it counts carports.

What changes from 1 January 2027?

Act 243/2026 Z. z. amends the Building Act from 1 January 2027 (Art. XV). The table follows the amending text and is not law before that date.

TopicUntil 31 December 2026From 1 January 2027Art. I of act 243/2026
Group of the carportGround-level structures fixed to the ground, up to 50 m² and 5 m, in § 2 ods. 4 písm. a)Ground-level structures or assembled products, up to 50 m² and 5 m, in § 2 ods. 7 písm. a)Points 4, 5 and 7
NotificationAlways for the groups a) to c)Only if a condition of § 18 ods. 3 písm. a) to i) applies. Otherwise neither a decision nor a notification (§ 18 ods. 5 písm. k)Point 59
2 m boundary conditionA structure or a terrain modificationA structure or a building alterationPoint 60

Two conditions matter for a carport. One is a position closer than 2 m to the plot boundary (písm. b). The other is a building fixed to the ground by a solid foundation (písm. d). A roofed carport on a foundation can meet the definition of a building in § 3 ods. 1, so ask the office whether it applies písm. d) to your carport. A carport that meets no condition needs neither a decision nor a notification. The technical rules for a safe structure still apply.

The new § 60 ods. 4 písm. b) covers works done from 1 April 2025 to 31 December 2026 without a verified project. The office may then approve afterwards a minor structure that serves a main building. It names a garage and a shelter as examples, but it refers to § 2 ods. 7 písm. d) to f), which are fences, connections and small traffic elements. Ask the office whether a carport qualifies (Art. I points 58 and 129).

How does rainwater from a carport affect the neighbour?

An open carport gathers rain on its roof and sends it to the edge. Direct the water to your own plot. Under § 127 ods. 1 of act 40/1964 Zb. (Občiansky zákonník), an owner must not endanger a neighbour's building or land by changing the plot without adequate measures to secure them. Gutters, downspouts and a drainage point on your plot are such measures. You can also store the water in a rainwater harvesting system. Find out the soil type and the groundwater depth on your plot before you finalise the drainage design.

Can you mount photovoltaic panels on a carport?

Yes, a carport roof can carry photovoltaic panels. The equipment has its own thresholds in the act. Until 31 December 2026 the act frees renewable equipment up to 50 kW from decision and notification (§ 18 ods. 5 písm. i). This covers electricity, heat and cooling. Solar equipment from 50 kW to 100 kW needs a notification (§ 18 ods. 4 písm. b). That paragraph also names solar equipment integrated into artificial structures, so ask the office how it treats a carport roof.

From 1 January 2027 § 18 ods. 4 is rewritten (point 62). It names electricity equipment from renewable sources of 50 kW to 100 kW when the work is not a building alteration. It names equipment of 50 kW to 300 kW when it is an alteration. Read the amended text before you plan. Design the posts and beams for the wind load and the dead load of the array. Ask the panel supplier for the weight per square metre.

Frequently asked questions

Do I need a building permit for a carport?
Not a permit, but a notification until 31 December 2026. A free-standing carport up to 50 m² built-up area and 5 m high is a minor structure and must be notified (§ 18 ods. 3 of act 25/2025 Z. z.). A larger or taller carport follows § 18 ods. 2, a decision on building intent.
Is a carport up to 25 m² exempt from notification?
No. The 25 m² figure in § 2 ods. 4 písm. b) belongs to underground structures. A carport belongs to písm. a) with a limit of 50 m² and 5 m. Until 31 December 2026 it needs notification at any distance from the boundary.
Does the 2 m distance from the boundary exempt a carport?
No. Section 18 ods. 3 písm. b) uses 2 m as a notification trigger, not as a setback or an exemption. The setbacks come from decree 532/2002 Z. z. (§ 6).
What changes for a carport from 1 January 2027?
Act 243/2026 Z. z. removes the rule that always requires notification for this group (Art. I point 59). A carport then needs notification only if a condition of § 18 ods. 3 applies, for example a position closer than 2 m to the boundary.
Is a carport attached to the house different?
Yes, it can be. A carport that keeps the structural and operational unity of the house is an extension (§ 5 ods. 3) and needs a decision on building intent (§ 18 ods. 2). A free-standing carport is a separate minor structure.
Can I install solar panels on a carport roof?
Yes. Until 31 December 2026, renewable equipment up to 50 kW needs neither a decision nor a notification (§ 18 ods. 5 písm. i). Solar equipment from 50 kW to 100 kW needs a notification (§ 18 ods. 4 písm. b). The carport structure must carry the extra load.

Sources

  1. Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Národná rada Slovenskej republiky, Slov-Lex · § 2 ods. 4 písm. a) and b), § 3 ods. 1, § 5 ods. 1 and 3, § 18 ods. 2 to 5, § 26 ods. 3, § 42 ods. 1, § 63, § 66 ods. 1, § 79, § 84 ods. 23
  2. Zákon č. 243/2026 Z. z., ktorým sa mení a dopĺňa zákon č. 25/2025 Z. z. Stavebný zákon · Národná rada Slovenskej republiky, Slov-Lex · Čl. I body 4, 5, 7, 58, 59, 60, 62, 129; Čl. XV
  3. Vyhláška MŽP SR č. 532/2002 Z. z. o podrobnostiach o všeobecných technických požiadavkách na výstavbu · Ministerstvo životného prostredia SR, Slov-Lex · § 6 ods. 1 to 3
  4. Zákon č. 200/2022 Z. z. o územnom plánovaní · Národná rada Slovenskej republiky, Slov-Lex · § 22 ods. 3 písm. c)
  5. Vyhláška č. 392/2023 Z. z. o podrobnostiach o územnoplánovacej dokumentácii · Ministerstvo dopravy a výstavby SR, Slov-Lex · § 2 písm. v) and w)
  6. Zákon č. 40/1964 Zb. Občiansky zákonník · Národná rada Slovenskej republiky, Slov-Lex · § 127 ods. 1
  7. Zákon č. 145/1995 Z. z. o správnych poplatkoch · Národná rada Slovenskej republiky, Slov-Lex · Sadzobník, Časť V Stavebná správa, položka 59 písm. b) bod 5