Flying buttress
A flying buttress is an arch outside a Gothic building that carries a high vault's thrust to a solid support, freeing walls for windows.
What is a flying buttress?
A flying buttress is an arch outside a building that carries the sideways push of a vault across an open space to a solid support. The University of South Florida's ClipArt ETC page says it transmits the horizontal thrust of a vault across an intervening space to a buttress outside the building. That space can be an aisle, a chapel or a cloister. The French name is arc-boutant. In Slovak the buttress system of a Gothic church is the oporný systém. Its arches are oporné oblúky (Beliana).
The same page says that, with a flying buttress, the load-bearing walls can contain cut-outs such as large windows. It adds that the device is usually found on a religious building such as a cathedral.
How does a flying buttress carry the thrust of a vault?
A stone vault pushes outward as well as down. Beliana explains that the pressure of any vault has two parts. A vertical part goes into the ground. A horizontal part pushes on the walls. Builders usually meet the horizontal part with thick walls, buttress piers or arches, or with ties.
The Columbia University project on Amiens Cathedral describes the Gothic solution. It says the exterior supports work as if someone had broken the outer wall into segments and rotated each by 90 degrees. Each segment gives a rigid transverse support to the exposed arches, which are the flying buttresses, and these hold up the high vaults. The same project says builders applied the pointed arch to reduce outward thrust. The pointed arch lowers the push, and the flying buttress takes the rest outside the wall. The table sets out the parts as the sources describe them.
| Element | Role described in the sources | Source |
|---|---|---|
| High vault | Pushes outward as well as down | Beliana, Columbia University |
| Pointed arch | Applied to reduce outward thrust | Columbia University |
| Flying buttress (exposed arch) | Carries the horizontal thrust across an aisle, chapel or cloister to a buttress outside | University of South Florida |
| Buttress pier | Stands on the outer edge of the aisle, receives the thrust and is weighed down by a pinnacle above | ÚÚR (Czech overview) |
| Outer wall | Free to carry large windows, because the thrust goes out through the arches | University of South Florida, EBSCO |
Why did Gothic builders use flying buttresses?
The main reason the sources give is height and light. The Columbia page on Amiens Cathedral says flying buttresses let builders create tall, slender, light-filled structures. EBSCO Research Starters explains the change from earlier building. Roman and Romanesque builders hid their buttress piers behind the outer walls. Gothic builders exposed the framework of piers, arches and flying buttresses. The roof then rested on that skeleton and not directly on the walls, so the walls could be filled with stained glass.
For Amiens, the Columbia page gives a few numbers. Master Thomas de Cormont built the upper nave in the 1230s. The cathedral is 43.3 m high and Beauvais is 46 m. The page also says builders deployed the first flying buttresses some eighty years earlier and learned to exploit them to build ever taller cathedrals. It names no building or date for those first ones, and it does not say which date the eighty years count from. If it means the 1230s nave, the first ones date from about the 1150s. Treat that as approximate.
| Source | What it states | Date given |
|---|---|---|
| Columbia, Amiens page | Upper nave built by Master Thomas de Cormont | 1230s |
| Columbia, Amiens page | First flying buttresses deployed some eighty years earlier | No building or date named |
| University of South Florida | Caption page that cites a 1915 history of architecture | No date for the device |
How is a flying buttress different from a ribbed vault or a pointed arch?
People mix the three up because they appear together in Gothic buildings, but each answers a different question. The ribbed vault is the ceiling, a skeleton of stone ribs with thinner panels between them. The pointed arch is a shape of arch that the Columbia project ties to reducing outward thrust. The flying buttress is the exterior support that takes the remaining push away from the wall.
You can see them apart in a building. A pointed arch or a ribbed vault belongs to the inside of the nave. A flying buttress shows from outside, as an arch against the upper wall.
What does a Gothic buttress system look like in the Czech and Slovak lands?
The sources opened for this page do not name a Slovak building with flying buttresses, so this page gives none. The Czech Institute of Territorial Development (ÚÚR) describes the system in Czech Gothic. The buttress piers stand on the outer perimeter of the aisles and pass the pressure of the main-nave vault through flying buttresses. A Gothic buttress pier differs from a Romanesque one by its stepping, which follows the structural load, and pinnacles weigh it from above. ÚÚR calls the whole group a developed buttress system typical of a Gothic cathedral.
What do people commonly misread about flying buttresses?
The most common misreading is that the flyer is decoration. Columbia says the flying buttresses support the high vaults, so they belong to the load path. A second misreading is that every Gothic building has them. The South Florida page says flying buttresses are often found in Gothic architecture and usually on religious buildings. Those wording choices describe a pattern, not a rule. A third misreading is that a flying buttress is a thick wall. The arrangement is different, because the thrust crosses open space to a separate pier.
Why does a flying buttress matter in Slovakia today?
A flying buttress is rarely a design element in a new family house. A Slovak architect is more likely to meet one in an old church or another historic building. Act 49/2002 on the protection of the monument fund, § 1 ods. 1, sets the conditions for protecting cultural monuments, heritage areas, archaeological finds and archaeological sites. Under § 32 ods. 2, the owner of a cultural monument must apply to the regional monuments office for a decision on the restoration intent before restoring it. The heritage office is Pamiatkový úrad SR.
Treat a historic support as part of the original structure. This is design advice and not a rule from a source. Record how the structure works before you change any part of it. A support that looks redundant may carry a load you cannot see from the ground. See also Gothic architecture and net vault.
Frequently asked questions
- What is a flying buttress in simple terms?
- It is an arch outside a building that carries a high vault's sideways push across the open space to a solid support. Because the arch stands outside the wall, the wall behind it can have openings such as large windows.
- Why do Gothic cathedrals have flying buttresses?
- Stone vaults of tall naves push their walls outward. The Columbia University Amiens project says flying buttresses support the high vaults and let builders create tall, slender, light-filled structures.
- Is a flying buttress the same as an ordinary buttress?
- No. The University of South Florida describes it as a specific type of buttress. The arch crosses an open space, such as an aisle, to reach a buttress outside the building.
- What is the Slovak name for a flying buttress?
- Beliana names the buttress system of a Gothic church the oporný systém, with oporné oblúky (buttress arches) as part of it. The English term is flying buttress and the French term is arc-boutant.
- Did every Gothic church have flying buttresses?
- Not necessarily. The University of South Florida says they are often found in Gothic architecture and usually on religious buildings. Check the building itself before you assume one is present.
Sources
- The Gothic Structural Revolution (Life of a Cathedral: Notre-Dame of Amiens) · Columbia University, Media Center for Art History (ARTHUM project)
- Amiens Cathedral (Life of a Cathedral: Notre-Dame of Amiens) · Columbia University, Media Center for Art History (ARTHUM project)
- Early Gothic Flying Buttress (ClipArt ETC) · University of South Florida, Florida Center for Instructional Technology
- Gothic architecture · EBSCO Research Starters (M. Joseph Costelloe, Karen Gould) · whole article
- klenba (vault), Encyclopaedia Beliana · Slovenská akadémia vied, Encyclopaedia Beliana · whole entry (published March 2017)
- Gotické památky (Gotická architektura v Českých zemích) · Ústav územního rozvoje (Brno) · Konstrukce a architektonický tvar
- Zákon č. 49/2002 Z. z. o ochrane pamiatkového fondu (consolidated version effective from 1 April 2025) · Slov-Lex (Slovak Republic) · § 1 ods. 1, § 32 ods. 1 and 2