Tracery

Tracery is the stone pattern in a Gothic window head. Plate tracery cuts openings in solid stone, and bar tracery uses thin ribs that leave room for glass.

What is tracery in Gothic architecture?

Tracery is the openwork pattern of stone that fills the upper part of a window opening. It divides the opening into smaller lights. The Looking at Buildings glossary defines tracery as an openwork pattern of masonry or timber in an opening, especially the upper part. It notes that tracery is most common in Gothic architecture (Looking at Buildings, Gothic windows and tracery).

Tracery belongs to the wider style described under Gothic architecture. The two basic types, plate and bar tracery, are told apart by how much stone and how much glass the window shows. The phases below help to date a window. They come from English examples, so treat them as a guide, not a rule for every country.

How does plate tracery differ from bar tracery?

Plate tracery uses thick areas of stone to separate the glazed areas. The Pitt Glossary of Medieval Art and Architecture says the window may look like a stone infill with small openings cut for the glass. The stone, not the glass, dominates (Glossary of Medieval Art and Architecture, plate tracery).

Bar tracery is made of thin stone elements instead of thick ones. The same glossary says the glass rather than the stone dominates, which gives a more delicate, web-like effect (Glossary of Medieval Art and Architecture, bar tracery). Looking at Buildings adds that intersecting moulded ribwork forms the patterns.

FeaturePlate traceryBar tracery
Stone elementThick areas of stone with openings cut throughThin stone ribs and bars
Dominant material in the windowStoneGlass
Visual effectStone panel with holesDelicate, web-like
Date given by Looking at BuildingsIntroduced c. 1200Introduced c. 1250

When did bar tracery appear?

Looking at Buildings describes plate tracery as the earliest form, introduced about 1200, with shapes cut through solid masonry. It describes bar tracery as introduced about 1250. The same page says bar tracery began in France in the earlier 13th century. England adopted it rapidly from the 1240s (Looking at Buildings, Gothic windows and tracery). It dates the Early English phase of English Gothic to about 1180 to about 1250.

These dates describe England and France. The sources opened for this page give no dates for Slovak windows, so a Slovak window needs its own documentation before you date it by type.

What were the geometric and Decorated phases of tracery?

Geometric tracery uses simple forms, especially circles, chiefly foiled. Looking at Buildings places it in English Gothic of about 1240 to 1290. It calls it a French invention adopted for the east end of Westminster Abbey, begun in 1245. The largest example is the eight-light east window of the Lincoln Cathedral Angel Choir (Looking at Buildings, geometric tracery).

The Decorated phase developed at the end of the 13th century and continued into the later 14th. Bar tracery with uninterrupted flowing curves is called curvilinear tracery and is typical of the 14th century. Looking at Buildings says the north of England particularly favoured it in that century (Looking at Buildings, Decorated tracery).

PhaseDate in English GothicMain form
Plate traceryIntroduced c. 1200Openings cut through solid masonry
Geometric bar traceryc. 1240 to 1290Simple circles, chiefly foiled
Decorated (curvilinear)End of the 13th century into the later 14thUninterrupted flowing curves

Where can you see tracery in Slovakia?

The Medieval Heritage page on St Martin's Cathedral in Bratislava describes large pointed tracery windows with wide grooved frames on the highest floor of the tower. It also describes a trefoil blind tracery in each pointed arch of the chapels by the tower (Medieval Heritage, Bratislava, St Martin's Cathedral). Blind tracery is a pattern applied to a wall, not an opening that holds glass.

The page on St Elisabeth's Cathedral in Košice says the 19th-century work renovated or replaced the cornices, pinnacles, window frames, tracery, gables and portal details (Medieval Heritage, Košice, St Elisabeth's Cathedral). Some tracery on a Gothic church can therefore be younger than the walls around it, as in the neo-Gothic work of that period.

What does the law require before you change tracery on a monument?

If the church is a cultural monument, Act 49/2002 Z. z. on the protection of the monuments fund applies. Section 32 ods. 1 defines restoration as a set of specialised artistic and craft activities on a monument or a part of it. A window head is such a part. Under § 32 ods. 2 the owner must apply to the regional monuments office before restoration begins (Act 49/2002 Z. z., consolidated version from 1 April 2025).

The register of monuments at Pamiatkový úrad SR shows whether a building is listed. For the structure above the window, see pointed arch.

Is tracery the same as a rose window?

No. Tracery is the pattern in a window opening. A rose window is a circular window of patterned tracery in a petal-like formation, as the Pitt glossary defines it (Glossary of Medieval Art and Architecture, rose window). A rose window is therefore one use of tracery, not a separate type. See rose window for the form itself.

Frequently asked questions

What is tracery?
Tracery is the openwork pattern of stone in the upper part of a window opening. It divides the opening into smaller lights and is most common in Gothic architecture.
What is the difference between plate tracery and bar tracery?
Plate tracery uses thick areas of stone, so the stone dominates the window. Bar tracery uses thin stone ribs, so the glass dominates and the effect is more delicate.
When was bar tracery introduced?
Looking at Buildings dates plate tracery to about 1200 and bar tracery to about 1250. It says bar tracery began in France in the earlier 13th century and reached England from the 1240s.
What is geometric tracery?
Geometric tracery is an early phase of bar tracery that uses simple forms, especially circles, chiefly foiled. Looking at Buildings places it in English Gothic of about 1240 to 1290.
Is there tracery in Slovakia?
Yes. The Medieval Heritage page on St Martin's Cathedral in Bratislava describes large pointed tracery windows on the top floor of the tower. It also describes blind tracery in the arches of the chapels beside the tower.
Is tracery the same as a rose window?
No. A rose window is a circular window made of patterned tracery in a petal-like arrangement. Tracery is the pattern, and a rose window is one place where it is used.

Sources

  1. Gothic windows and tracery · Looking at Buildings (lookingatbuildings.org.uk) · Plate tracery c. 1200; bar tracery c. 1250; Early English c. 1180 to c. 1250
  2. Geometric tracery · Looking at Buildings (lookingatbuildings.org.uk) · Geometric tracery
  3. Decorated tracery · Looking at Buildings (lookingatbuildings.org.uk) · Decorated tracery; curvilinear tracery
  4. Glossary of Medieval Art and Architecture: plate tracery · University of Pittsburgh, Department of History of Art and Architecture (sites.pitt.edu/~medart)
  5. Glossary of Medieval Art and Architecture: bar tracery · University of Pittsburgh, Department of History of Art and Architecture (sites.pitt.edu/~medart)
  6. Glossary of Medieval Art and Architecture: rose window · University of Pittsburgh, Department of History of Art and Architecture (sites.pitt.edu/~medart)
  7. Bratislava, St Martin's Cathedral · Medieval Heritage project (medievalheritage.eu) · Current state
  8. Košice, St Elisabeth's Cathedral · Medieval Heritage project (medievalheritage.eu) · Current state
  9. Zákon č. 49/2002 Z. z. o ochrane pamiatkového fondu (version effective from 1 April 2025) · Slov-Lex (Slovak Republic) · § 32 ods. 1 and 2