Rose window
A rose window is a round church window divided by patterned stone tracery and usually filled with stained glass, found in Gothic churches.
What is a rose window?
A rose window is a circular window in a church wall, divided by patterned stone tracery and usually filled with stained glass. The University of Pittsburgh's Glossary of Medieval Art and Architecture defines it as "a circular window composed of patterned tracery arranged in petal-like formation". The stone pattern is what makes the term specific. A round opening with no tracery is round, but it is not a rose window in this sense.
Viollet-le-Duc starts his entry on the rose in the Dictionnaire raisonné de l'architecture française from the same point. He calls the rose a circular opening in the walls of medieval churches. He adds that the stone cut-outs hold the glass the way a wooden or iron frame would. They also resist the pressure of the wind. The stone was therefore part of the window itself.
Where does the rose window come from?
Viollet-le-Duc says the oculus of the early Christian basilica seems to be the origin of the medieval rose. The oculus was a round opening in the gable above the entrance. He stresses that until late in the twelfth century the rose was only a small opening with no stone frame. It measured between 50 cm and 1 m across. French Romanesque architecture used it rarely.
The change came in the second half of the twelfth century. Roses then appear and grow larger until the middle of the thirteenth century. In the Île-de-France, Champagne and Picardy they open under the vaults across the whole width of the nave. In Normandy and Burgundy they appear late, near the end of the thirteenth century.
| Date (Viollet-le-Duc) | What he describes |
|---|---|
| To the late 12th century | Small round openings of 50 cm to 1 m, with no stone frame |
| 1165 to 1170 | Small roses in the choir of Notre-Dame in Paris to light the triforium. One is 2.85 m across, with a frame of eight stone pieces like wheel spokes |
| About 1180 | Roses of this date rarely exceed 5 or 6 m |
| About 1220 | West rose of Notre-Dame in Paris, about 9.6 m across, with 24 divisions in the outer zone and 12 in the inner zone |
| 1257 | Transept roses of Notre-Dame in Paris |
Why is a rose window round?
Viollet-le-Duc gives two structural reasons. In the nave above the triforium, a round opening lightened the wall and braced the piers. At the base of the towers of Laon, builders chose round openings over openings with straight jambs to give the work more solidity.
The third reason concerns the gable wall. Viollet-le-Duc explains that the large rib vaults had pointed transverse arches, but the arch of the gable wall was drawn as a semicircle. The builders then completed the semicircle into a full circle and filled it with a stone frame to hold the glass. The result looked like one huge round window under the arch of the vault. The vault behind that arch is a ribbed vault with pointed arches.
| Place | Why a circle (Viollet-le-Duc) |
|---|---|
| Nave wall above the triforium | A round opening lightened the wall and braced the piers |
| Base of the towers of Laon | A round opening gave more solidity than one with straight jambs |
| Gable wall | The semicircular arch of the gable could hold a full circle, filled with a stone frame for the glass |
How is a rose window built?
Viollet-le-Duc says the main division of the stone frames follows a twelve-sided figure, with a few exceptions. The main compartments form twelve corners and twelve spokes. He describes the stone members as struts that hold the ring of stones together, like the spokes of a wheel hold the rim. The stone pattern is the tracery of the window.
He judges the west rose of Notre-Dame in Paris more skilful than the earlier rose of Mantes. Its designer divided the circle into 24 parts in the outer zone and 12 in the inner zone. He set three stone rings that supported each other. The iron frame for the glass then carried little of the load. Before this, the weight of the stone frame at Mantes rested on only two lower colonnettes, which he calls a danger.
How does a rose window differ from a plain round window?
The difference is the tracery. By the Pittsburgh definition, a rose is a round window divided by patterned stone. A plain circular opening with no pattern is only a round window. Viollet-le-Duc shows how the two relate. Once round openings grew to 3 or 4 m across, he says, they looked bare, especially when unglazed, so builders filled them with cut stone patterns.
Is there a rose window in Slovakia?
The sources opened for this page do not name a Slovak rose window, so this page does not give one. The Czech Institute of Territorial Development (ÚÚR) says a radial rose window occurs on the west side of Gothic cathedrals in the Czech lands. For a Slovak church, ask the regional monuments office or check the heritage register for the building you are working on.
How does Slovak heritage law treat a rose window in a protected church?
Act 49/2002 on the protection of the monument fund covers this, in the version effective from 1 April 2025. Under § 32 ods. 1, restoration includes maintenance, conservation, repair, adaptation and reconstruction of a cultural monument or part of it. Under § 32 ods. 2, the owner of a cultural monument must apply to the regional monuments office for a decision on the restoration intent before starting.
If the owner starts work without that decision, the office opens proceedings and calls on the owner to stop work until it decides. A repair of the stone tracery or a change of the glazing in a monument therefore counts as restoration in the sense of the act. Check the status of the church before you plan any work. If the church is a monument, ask the office first.
What do people commonly get wrong about rose windows?
The first mistake is to call any round church window a rose. The tracery defines the term. The second mistake is to see the rose as glass only. In Viollet-le-Duc's account the stone frame holds the glass and works as a structure. A repair to the stone is therefore a repair to the window. The third mistake is to think roses were always large. His dates run from small unframed openings to roses of 5 or 6 m about 1180 and about 9.6 m by 1220. The large rose belongs to the Gothic period.
Frequently asked questions
- What is a rose window?
- A rose window is a circular window in a church wall, divided by patterned stone tracery and usually filled with stained glass. The stone pattern, not the circle alone, makes a window a rose.
- When did rose windows first appear?
- Viollet-le-Duc says that until the late twelfth century the round opening was only a small hole with no stone frame. From the second half of the twelfth century roses appear and grow larger until the middle of the thirteenth.
- How is a rose window different from a round window?
- A plain round window is a single opening. A rose is a circle divided by stone tracery, and that division is what defines it.
- Does a rose window in a Slovak church need heritage approval?
- If the church is a cultural monument, the owner must apply to the regional monuments office before restoration starts. The act calls the decision the decision on the restoration intent (Act 49/2002 § 32 ods. 2). Restoration includes repair and adaptation (§ 32 ods. 1). Check the status of the church first.
- Why does the stone frame of a rose matter?
- Viollet-le-Duc says the stone cut-outs hold the glass like a wooden or iron frame and resist the wind. In the west rose of Notre-Dame in Paris, he says, the iron frame carried little of the load.
Sources
- Dictionnaire raisonné de l'architecture française du XIe au XVIe siècle, tome VIII, article "Rose" · Eugène Viollet-le-Duc (1854-1868), digitised by the Internet Archive (Getty Research Institute copy) · Article "Rose", pp. 39 to 47 (OCR text, read in full for these pages)
- Glossary of Medieval Art and Architecture: rose window · University of Pittsburgh (Jane Vadnal, Glossary of Medieval Art and Architecture)
- Gotické památky (Gotická architektura v Českých zemích) · Ústav územního rozvoje (Brno) · Konstrukce a architektonický tvar
- Zákon č. 49/2002 Z. z. o ochrane pamiatkového fondu (consolidated version effective from 1 April 2025) · Slov-Lex (Slovak Republic) · § 32 ods. 1 and 2