Ribbed vault
A ribbed vault is a stone ceiling whose crossing stone ribs carry its load to a few piers, so the walls can hold windows.
What is a ribbed vault?
A ribbed vault is a stone ceiling in which stone arches called ribs carry the load and thinner panels fill the spaces between them. The Slovak name is rebrová klenba. The Slovak academy encyclopedia Beliana describes it as a cross vault with stone ribs on its edges. These ribs have the main load-bearing role. A cross vault forms where two barrel vaults intersect, and the ribs follow the lines of the edges.
Hanover College's course page on the Gothic rib vault calls the form "a simple combination of diagonal and transverse arches". The ribs also reinforce the thin shell at the creases, where stresses are highest. The same page says the ribs probably served as permanent centring. Centring is the temporary frame that holds a vault during building.
How do the ribs carry the weight of the vault?
Beliana explains that the pressure of each part of the vault passes into the diagonal ribs and down into the corners. The vault then does not need continuous support along its whole edge. Columns or piers at the corners are enough. That leaves open arches between the supports, so the space is lighter and better lit. Hanover College says the arches channel the weight into slender piers. The wall between them is then free for large windows.
A vault also pushes sideways. Beliana describes the pressure of any vault as slanting. A vertical part goes into the ground, and a horizontal part pushes on the walls. Builders usually meet the horizontal part with thick walls, buttress piers or arches (the Gothic buttress system), or with ties. Columbia University's Amiens project adds that the heavy masonry of a Romanesque vault creates considerable outward thrust. Builders therefore thickened the supports and outer walls.
| Element | Role in a ribbed vault | Source |
|---|---|---|
| Diagonal and transverse ribs | Carry the main load and pass it to the corner supports | Beliana, Hanover College |
| Thin panels between the ribs | Fill the vault surface, so the whole vault is lighter | Hanover College, Columbia University |
| Slender piers | Receive the load from the ribs and leave the wall space free | Beliana, Hanover College |
| Pointed arch | Applied to reduce outward thrust | Columbia University |
| Flying buttress | Rigid transverse support outside, for the exposed arches that carry the high vault | Columbia University |
How does a ribbed vault differ from a plain cross vault?
A plain cross vault has no ribs. Beliana notes that its edges carry most of the pressure down to four support points in the corners of the bay. The Romans already built cross vaults of cast masonry and sometimes strengthened them with diagonal ribs, according to the same entry. In a ribbed vault the ribs are separate stone members with the main load-bearing role. Gothic ribs were richly profiled, while Romanesque ribs were simple and mostly prismatic.
So the ribbed vault is not purely Gothic. Columbia University traces the form to Islamic, Roman and Byzantine sources, and Beliana records rib vaults on late Romanesque buildings in Slovakia. Gothic builders combined the ribs with the pointed arch and the flying buttress into one structural system. Read the Romanesque architecture entry for the earlier style.
Where and when did the ribbed vault first appear?
The sources give different starting points, so treat every date as approximate. EBSCO Research Starters says ribbed vaulting appeared in Romanesque buildings of the eleventh century in northern Italy. Beliana says rib vaults appeared in western Europe about 1100.
The abbey church of Saint-Denis near Paris is often named as the first Gothic building. EBSCO says Abbot Suger rebuilt its west front and choir between 1130 and 1144. It adds that the building is generally conceded to be the first definitely Gothic structure, with ribbed vaults among its features. Fordham University's Internet Medieval Sourcebook gives a shorter span. Its editor says Suger started the new choir in 1140 and finished it in 1144. Suger's own text gives 1144 for the completed building and describes it from the crypt to the top of the vaults. It does not use the word rib. This page therefore does not credit Saint-Denis alone with the ribbed vault.
Hanover College says builders perfected the Gothic rib vault in the thirteenth century at Amiens and elsewhere. It dates the Amiens vault to 1233/6.
Where can you see a ribbed vault in Slovakia?
Beliana names the earliest Slovak examples. The table lists them with the dates the sources give.
| Building | Vault | Source |
|---|---|---|
| Parish Church of the Assumption, Banská Štiavnica | One of the first Slovak rib vaults, on a late Romanesque building, first third of the 13th century | Beliana. The Monuments Board shows a 13th-century rib vault here |
| St Martin's Church, Spišská Kapitula | One of the first Slovak rib vaults, on a late Romanesque building, 1220s and 1230s | Beliana |
| Franciscan Church of the Annunciation, Bratislava | Nave vault, before 1297, among the first Gothic cross rib vaults | Beliana |
| Church of St Elisabeth, Banská Štiavnica | Net rib vault | Monuments Board of the Slovak Republic |
Later Gothic vaults used more complex rib patterns. Beliana lists six-part, eight-part, net, star and looped types. The net vault entry explains the net pattern. Beliana also notes that in the late Gothic period some ribs lost their load-bearing role and became only decoration.
What should an owner know about an old ribbed vault?
The Monuments Board's methodology on ceilings says the space above a vault is usually filled. The fill stabilises the vault and adds thermal and acoustic insulation. Beliana adds that the fill spreads point loads, for example from furniture and people on the floor above. Changing the fill therefore changes how the vault carries load.
The methodology also says that a structural engineer with the right qualification must carry out a full diagnosis of a ceiling. It separates surface damage from deep damage, which includes damage to the stone load-bearing members. A restoration should remove the cause of the damage and keep interventions into the fabric to a minimum. Where possible it should use traditional materials and methods.
If the building is a cultural monument, Act 49/2002 § 32 ods. 1 counts maintenance, conservation, repair, adaptation and reconstruction as restoration. Under § 32 ods. 2 the owner must apply to the regional monuments office for a decision on the restoration intent before starting. If the owner starts without it, the office opens proceedings and calls on the owner to stop work until it decides. Check the status of the building before you plan any work on its vaults.
What do people commonly get wrong about ribbed vaults?
The first mistake is to call every arched ceiling a ribbed vault. The ribs define the type, and Beliana separates the ribbed cross vault from the plain cross vault and the barrel vault. The second mistake is to treat the ribs as decoration. In most Gothic vaults the ribs carry load, although in late Gothic work some do not. The third is to credit the vault alone with the Gothic look. The Gothic style also depends on the pointed arch and the flying buttress. They deal with the thrust together with the ribs.
Frequently asked questions
- What is a ribbed vault?
- A ribbed vault is a stone ceiling in which stone ribs carry the load and thin panels fill the spaces between them. The ribs pass the load to piers or columns at the corners, so the walls between can hold large windows. The Slovak name is rebrová klenba.
- How is a ribbed vault different from a plain cross vault?
- A plain cross vault has no ribs and its edges carry most of the pressure down to the four corners. In a ribbed vault, stone ribs along the edges carry the main load. The Romans sometimes added diagonal ribs to cross vaults, so ribs are not purely Gothic.
- Why did ribbed vaults need flying buttresses?
- A vault still pushes sideways even when it is light. The Columbia University Amiens project describes flying buttresses as rigid supports outside the wall that hold up the exposed arches carrying the high vault.
- Where can I see a ribbed vault in Slovakia?
- Beliana names the parish church in Banská Štiavnica and St Martin's Church in Spišská Kapitula for the first rib vaults. It lists the nave of the Franciscan church in Bratislava (before 1297) among the first Gothic ones. The Monuments Board also shows a net rib vault in the Church of St Elisabeth in Banská Štiavnica.
- Do all ribs in a Gothic vault carry load?
- No. Beliana says that in the late Gothic period some ribs lost their load-bearing role and became decoration only. An engineer should check which ribs carry load before any work on an old vault.
Sources
- klenba (vault), Encyclopaedia Beliana · Slovenská akadémia vied, Encyclopaedia Beliana · whole entry (published March 2017)
- Metodika princípov rozhodovania Pamiatkového úradu SR, časť 8: Podlahy, stropy a schodiská, 4. časť Stropy · Pamiatkový úrad Slovenskej republiky · 3.4 Klenby, 7 Diagnostika, figures 11, 12, 14
- Amiens Cathedral and the Gothic rib vault (course page) · Hanover College, Department of History
- The Gothic structural revolution (Amiens Cathedral ARTHUM project) · Columbia University, Media Center for Art History (ARTHUM)
- Gothic architecture · EBSCO Research Starters (M. Joseph Costelloe, Karen Gould) · whole article
- Abbot Suger, On What Was Done in His Administration (translated by David Burr) · Fordham University, Internet Medieval Sourcebook (edited by Paul Halsall) · editor's introduction and the text of Suger
- Zákon č. 49/2002 Z. z. o ochrane pamiatkového fondu (consolidated version effective from 1 April 2025) · Slov-Lex (Slovak Republic) · § 32 ods. 1 and 2