Net vault

A net vault is a late Gothic rib vault whose crossing ribs form a net of diamond-shaped fields over the vault surface.

A net vault (Slovak sieťová klenba, German Netzgewölbe) is a late Gothic rib vault whose ribs cross to form a net of diamond-shaped fields. The Pitt medieval glossary defines it as a vault on which a complex of ribs gives a net-like appearance (Glossary of Medieval Art and Architecture, net vault).

What is a net vault and where does the name come from?

A net vault belongs to the rib vaults. The Pitt glossary lists it with the fan, quadripartite and sexpartite rib vaults. The Medieval Heritage dictionary says it was introduced at the end of the Gothic period, and that it is usually based on a barrel vault with intersecting ribs forming a diamond mesh (Medieval Heritage, net vault).

The name describes a drawing, not a shape. Georg Barkhausen, writing in 1895, says the star and net vaults take their names from the geometric pattern that the joined rib system makes. He calls the surface fields between the ribs Maschen (meshes) when they look rhombic in plan (Barkhausen, Balkendecken, 1895, art. 286 and 287). This is an old German handbook. This page uses it only for the name and the rib terms, not for dates.

How does a net vault differ from a star vault?

Both come from the multi-part Gothic cross vault. Barkhausen describes that vault as a simple cross vault whose caps are divided by extra ribs. Star and net vaults follow when the rib system becomes richly developed. The table sets out what the same source says about each.

FeatureStar vaultNet vault
Starting pointThe simple Gothic vault with diagonal arches, with more ribs addedThe star vault pattern, in its simplest form without the diagonal arches
Fields between the ribsSmaller caps formed by extra ribsFields that look rhombic in plan, called meshes
Further developmentMany-rayed forms, often just called star vaultsNet vaults with many more ribs, which Barkhausen calls multi-part net vaults

For the basic arrangement of ribs, see ribbed vault. The surrounding style is described under Gothic architecture.

Where are net vaults in Slovakia?

The church of St James in Levoča has net vaults in its porches. The Medieval Heritage page says the interior has cross-rib vaults and that stellar and net vaults were built in the porches. It adds that a wooden ceiling in the northern porch was replaced by a net vault in the first quarter of the 16th century (Medieval Heritage, Levoča, St James Church).

The same page says the southern portal, from around 1380, has a porch with a stellar vault from the 15th century, so the two porches carry different vault types. The parish website of the church agrees about the north porch. It says the north porch first had a beamed ceiling and received a net vault, probably paid for by the then parish priest Ján Henckel, in the first quarter of the 16th century (Chrám sv. Jakuba v Levoči, section Architektúra). Other web pages give slightly different dates for the same porch. This page follows the two sources it opened.

St Elisabeth's Cathedral in Košice also has them. The Medieval Heritage page says a net and stellar-net vault was used in the chancel, and the interior elsewhere is covered with stellar vaults (Medieval Heritage, Košice, St Elisabeth's Cathedral). The page gives no date for this vault.

Where else do net vaults appear?

The Medieval Heritage dictionary names Germany, the Netherlands and Poland as the main areas of use. It gives examples only in Germany, with the dates in its photo captions.

BuildingLocationDate in the caption
St George, DinkelsbühlGermany15th century
Liebfrauenkirche, LienzingenGermany15th century
Maulbronn monastery and churchGermany15th/16th century
St James, Levoča (north porch)SlovakiaFirst quarter of the 16th century

Why did builders choose a net vault?

The sources opened for this page describe the form and where it appears. They do not give a reason for choosing it, so this page gives none. They do show that one church can mix vault types. Levoča has cross-rib vaults inside and net and stellar vaults in the porches. A single vault therefore does not date a whole building.

What should you check before you alter a historic vault?

Start with the register of monuments at Pamiatkový úrad SR. If the building is a cultural monument, Act 49/2002 Z. z. § 32 ods. 1 covers restoration of the monument or a part of it. A vault is such a part. Under § 32 ods. 2 the owner must apply to the regional monuments office before restoration begins (Act 49/2002 Z. z., consolidated version from 1 April 2025).

The same rule covers a vault in a monument that you only plan to repair. Ask the office before you remove or change original ribs or webs. See also pointed arch and tracery, which appear on the same buildings.

Frequently asked questions

Is a net vault the same as a ribbed vault?
No. A ribbed vault is the general family of vaults built with ribs. A net vault is one type in that family. The Pitt medieval glossary lists the net vault as a rib vault whose complex of ribs gives a net-like appearance.
Are there net vaults in Slovakia?
Yes. The north porch of St James in Levoča received a net vault in the first quarter of the 16th century. The parish website and the Medieval Heritage project both say so. The church interior has cross-rib vaults.
Why is it called a net vault?
Barkhausen, in his 1895 handbook, says the names star vault and net vault come from the geometric pattern of the rib system. They do not come from the outer form of the vault.
Does a net vault in my house mean the building is protected?
Not by itself. Protection depends on whether the building is a registered cultural monument or lies in a protected area. Check the register at Pamiatkový úrad SR before you change original vaulting.
How is a net vault related to a star vault?
Barkhausen treats both as developments of the multi-part Gothic cross vault. He describes the simplest net vault as a star vault pattern without the diagonal arches.
Where else are net vaults found?
The Medieval Heritage dictionary says the form was used mainly in Germany, the Netherlands and Poland. It shows 15th-century German examples in Dinkelsbühl and Lienzingen, and one at Maulbronn dated 15th to 16th century.

Sources

  1. Georg Barkhausen, Balkendecken (section on Stern- und Netzgewölbe, articles 286 and 287), Stuttgart 1895 · Digitised by the University of Paderborn library (digital.ub.uni-paderborn.de) · Art. 286 and 287, pp. 416 and 417; passages on Reihungen and Maschen
  2. Glossary of Medieval Art and Architecture: net vault · University of Pittsburgh, Department of History of Art (sites.pitt.edu/~medart)
  3. MedievalHeritage dictionary: net vault · MedievalHeritage project (medievalheritage.eu), heritage dictionary
  4. Levoča, St James Church · MedievalHeritage project (medievalheritage.eu), heritage page for Slovakia
  5. Chrám sv. Jakuba v Levoči, section Architektúra · Parish of St James, Levoča (chramsvjakuba.sk) · Architektúra
  6. Košice, St Elisabeth's Cathedral · Medieval Heritage project (medievalheritage.eu) · Architecture
  7. Zákon č. 49/2002 Z. z. o ochrane pamiatkového fondu (version effective from 1 April 2025) · Slov-Lex (Slovak Republic) · § 32 ods. 1 and 2