Pointed arch

A pointed arch is an arch whose two curves meet at a peak. Gothic builders used it to lower the sideways thrust of vaults.

What is a pointed arch?

A pointed arch is an arch whose two curved sides meet at a peak instead of forming a half circle. In Slovak it is lomený oblúk. The Slovak academy encyclopedia Beliana lists it with the semicircular, elliptical and segmental arch as one of the shapes of a vault arch. It is the usual arch of Gothic architecture.

EBSCO Research Starters says the Romans used only the round arch. A round arch has a fixed height for a given width. A pointed arch does not. EBSCO calls this the more important advantage: the height of the arch is not determined by its width.

How does a pointed arch differ from a round arch?

The table sets the two forms side by side. Each row states only what a named source says.

FeatureRound archPointed archSource
ShapeHalf circleTwo curved sides meeting at a peakBeliana
Outward thrustHigherLower. Builders adopted it to make thrust less powerfulEBSCO, Columbia University, Viollet-le-Duc
Height and widthHeight follows from the widthHeight can be set separately from the widthEBSCO
Use in vaultsUsed by the RomansLets the builder vault bays of any plan with arches of different widthsEBSCO, Viollet-le-Duc

Why does a pointed arch push less to the side?

Every arch pushes outward at its base. Columbia University's Amiens project says builders applied the pointed arch to reduce outward thrust. It notes that the heavy masonry vaults of Romanesque buildings create considerable outward thrust and need thick supports. EBSCO states that the pointed arch generated less lateral thrust than the round arch.

Viollet-le-Duc gives the builders' own motive in his entry on the ogive in the Dictionnaire raisonné. He says that builders feared the thrusts of vaults. They admitted the pointed arch as a means of making those thrusts less powerful. This page does not explain the geometry behind the effect, because the sources only state it.

The pointed arch lowers the thrust but does not remove it. Columbia describes the answer to what remains: rigid transverse supports outside the wall, which hold up the exposed arches that carry the high vaults. These are the flying buttresses. Beliana lists the same options for any vault: thick walls, buttress piers or arches, or ties.

Where and when did the pointed arch first appear?

The pointed arch is older than Gothic architecture. EBSCO says builders in Mesopotamia used it before the Romans. From there it passed to Persia, Armenia, Egypt and Sicily. EBSCO adds that its first use on the European continent was probably in the nave arcades of the abbey church of Cluny. Columbia traces the form to Islamic sources.

Viollet-le-Duc shows that French builders knew the form before the Gothic period. A footnote in his entry dates the transverse arches of Saint-Front in Périgueux to the last years of the eleventh century. He calls them already pointed. He also describes the porch vaults of the abbey church of Vézelay as a reasoned application of the pointed arch to vaults. A pointed arch alone therefore does not date a building to the Gothic period.

EBSCO calls the abbey church of Saint-Denis near Paris the first definitely Gothic structure. Abbot Suger rebuilt its west front and choir between 1130 and 1144. The table gathers the dates in this section.

PlaceWhat the source saysSource
MesopotamiaBuilders used the pointed arch before the RomansEBSCO
Saint-Front, PérigueuxTransverse arches from the last years of the 11th century, already pointedViollet-le-Duc, footnote
Abbey church of ClunyProbably the first European use, in the nave arcades, 1089 to 1131EBSCO
Abbey church of Saint-DenisRebuilt 1130 to 1144, first definitely Gothic structureEBSCO

Why does the pointed arch suit a ribbed vault?

A ribbed vault has diagonal, transverse and longitudinal ribs that meet at the crown. EBSCO explains that a pointed arch lets the builder raise the transverse and longitudinal ribs to the height of the diagonal ribs. It says this mattered most for cruciform churches. Builders could point the diagonal ribs more sharply to reach any safe height.

Viollet-le-Duc makes the same point from the plan. He says Roman builders vaulted oblong bays with intersecting barrel vaults of different diameters, which looked bad. With pointed arches the builder could vault a bay of any plan, with arches of different widths and heights.

Is every pointed arch Gothic, and is every Gothic arch pointed?

Neither. The Czech Institute of Territorial Development (ÚÚR) says Gothic arches are mostly pointed because that is structurally better. Round and segmental arches also occur. It also says the ogee arch of late Gothic is decorative. Beliana adds that the arch of a cross vault can be semicircular or pointed. So the shape of one arch is a clue to the style and not proof of it. Look at the vault, the buttressing and the windows together.

ÚÚR notes that large Gothic church windows end in a pointed arch. It also says the portals of large churches differ from Romanesque ones only by the pointed arch and the figural carving.

How is a pointed arch different from a masonry arch?

A pointed arch is one shape of masonry arch. The masonry arch is the general type, built of stone or brick blocks. The pointed arch is the Gothic answer to a general structural problem, and not a separate structural system.

What should an owner do when an older building has pointed arches?

Treat the arch as part of the load path. This is design advice and not a rule from a source. If you plan to change a wall, pier or opening near an arch, ask a structural engineer first. The Monuments Board's methodology says a qualified structural engineer must carry out the full diagnosis of a load-bearing ceiling. It also says a restoration should remove the cause of damage and keep interventions to a minimum.

Frequently asked questions

What is a pointed arch?
A pointed arch is an arch whose two curved sides meet at a peak instead of forming a half circle. It is the usual arch of Gothic architecture and has the Slovak name lomený oblúk.
Why did Gothic builders use the pointed arch?
Sources describe it as a way to reduce the outward thrust of vaults. EBSCO adds that its height does not depend on its width. Builders could therefore set the height of ribs and arches more freely.
Is every pointed arch Gothic?
No. EBSCO says builders used the pointed arch in Mesopotamia long before. Viollet-le-Duc describes pointed transverse arches in Saint-Front in Périgueux from the late eleventh century. The shape alone does not date a building.
Is every Gothic arch pointed?
No. The Czech Institute of Territorial Development says Gothic arches are mostly pointed, but round and segmental arches also occur. The late Gothic ogee arch is decorative.
Does a pointed arch remove the need for buttresses?
No. It lowers the outward thrust but does not remove it. The Columbia University Amiens project describes flying buttresses as the rigid supports for the arches that carry the high vaults.

Sources

  1. Gothic architecture · EBSCO Research Starters (M. Joseph Costelloe, Karen Gould) · whole article
  2. The Gothic Structural Revolution (Life of a Cathedral: Notre-Dame of Amiens) · Columbia University, Media Center for Art History
  3. Dictionnaire raisonné de l'architecture française du XIe au XVIe siècle, tome VI, article OGIVE · Eugène Viollet-le-Duc, digitised text (Internet Archive) · Article OGIVE, pp. 426 to 429
  4. klenba (vault), Encyclopaedia Beliana · Slovenská akadémia vied, Encyclopaedia Beliana · whole entry (published March 2017)
  5. Gotické památky (Gotická architektura v Českých zemích) · Ústav územního rozvoje (Brno) · Konstrukce a architektonický tvar
  6. Metodika princípov rozhodovania Pamiatkového úradu SR, časť 8: Podlahy, stropy a schodiská, 4. časť Stropy · Pamiatkový úrad Slovenskej republiky · 7 Diagnostika