Stained glass

A stained glass window is a panel of coloured glass pieces joined by lead cames to form a picture or a pattern.

What is stained glass?

Stained glass is a window or panel made of small pieces of coloured glass joined together so that the pieces form a picture or a pattern. The glass is coloured in the melt, so the colour runs through the whole sheet, and the lines between the pieces are part of the design. In Slovak the term is vitráž.

The Victoria and Albert Museum describes the classic method in plain terms: the edges of each piece are fitted into H-shaped strips of lead, called cames, and the cames are soldered together to hold the panel. The museum notes that the cames were an integral part of a window's design, so the lead lines form part of the visual composition, not only a support. Once the leading is complete, putty is worked into the gaps to keep the panel weatherproof, and the finished panels are fixed to iron work set into the window opening.

How is a stained glass window made?

The maker starts with a drawing called a cartoon. The museum's account of the process lists three main steps: cutting solid pieces of coloured glass, decorating textured glass with enamel paints, and using lead strips to hold the separate pieces together as one panel.

Painters also used silver stain. It is a solution based mainly on silver nitrate, applied to the back of the glass, and it fires into the surface to give tones from yellow through to deep orange. Silver stain was introduced in the 14th century.

How did stained glass develop before the 19th century?

Stained glass was especially popular in Europe between 1150 and 1550, mainly in churches and cathedrals, and also in city halls and the homes of the wealthy. Medieval glassmakers mostly used the broad sheet and crown methods to make sheet glass. The early 12th-century treatise On the Various Arts, by Theophilus, is the main source on medieval methods.

Medieval colour came from metallic oxides added to the glass during melting. The result is called pot-metal glass. Where a deep red was needed, glassmakers dipped white glass into molten red to produce flashed glass, a thin red layer on a clear base.

What changed in the 19th-century revival?

At the start of the 19th century stained glass was, in the museum's words, effectively a dead art. Victorian designers revived it partly as a reaction against mass production. Gothic Revival designers relearned medieval methods, including pot-metal glass, and the popularity of the style led to many new churches filled with large, colourful narrative windows. William Morris founded a firm in 1861 that made windows for church interiors and private commissions, and it was instrumental in bringing stained glass back into domestic design.

The museum says Morris opposed pastiche, and that Selwyn Image and Carl Almquist rejected overly literal references to medieval windows. Morris's firm supplied windows as part of wider interior schemes for new churches. The movement itself is covered in the glossary entry on Arts and Crafts movement.

How does Art Nouveau stained glass differ from earlier glass?

Art Nouveau, known in Slovakia as Secesia, used the same craft but changed the source of its forms. Designers drew on flowers, leaves, animals and insects, and on flowing whiplash lines rather than historical ornament. The Victoria and Albert Museum describes Victor Horta's Brussels buildings as total works of art, with organic decoration that extends to iron banisters, stained glass canopies and door handles. It names Émile Gallé for his elegant glassware.

The Vienna Secession, covered in its own glossary entry, is one of the groups the museum names.

How is a leaded panel built and fixed in the window?

A leaded panel has four parts that matter to an owner: the glass, the lead cames, the putty and the iron support. The Victoria and Albert Museum describes how the cames are soldered together, how putty is rubbed into the gaps between glass and lead to make the panel waterproof, and how the finished panel is attached to iron supports set into the window opening. These supports are called the armature or ferramenta.

PartWhat it does
Coloured glass piecesForm the picture or pattern
Lead camesH-shaped strips that hold the glass edges, soldered at the joints, and part of the design
PuttyFills the gaps between glass and lead to keep the panel watertight
Iron armature (ferramenta)Supports the panel in the window opening

The same parts explain a practical point for an owner. Lead lines, putty and iron supports are all original material of a historic window, so a repair plan should say which of them it keeps. This is advice, not a legal requirement.

How is stained glass protected and restored in Slovakia?

The Slovak heritage office, Pamiatkový úrad SR, treats stained glass as one of the artistic parts of architecture. Its methodology lists vitráže alongside painted and stucco decoration, mosaics and sgraffito, and says these parts are protected as an integral part of the national cultural monument they belong to. The office keeps a separate, growing auxiliary database of these elements.

The methodology gives restoration its own category: M6, the restoration of stained glass, within the painting group. When the regional heritage office (KPÚ) decides that a conservation job will be carried out as restoration, the methodology says the work may be done either by the university of fine arts (Vysoká škola výtvarných umení, VŠVU) or by a member of the Chamber of Restorers, who works in their own name and under their own responsibility. The methodology cites act 200/1994 Z. z. on the Chamber of Restorers as the basis for that membership.

Conservation and restoration are different terms in the methodology. Conservation means minimal interventions that stabilise a monument, such as removing unwanted surface deposits. Restoration also interprets the monument through an artistic intervention, such as painted additions to lost parts of a painting. The glossary entry on architectural ceramics covers another protected decorative material with similar questions of authenticity.

Where does stained glass sit among related terms?

Stained glass is a glazing technique, while Art Nouveau is a style. The two terms answer different questions: one names a technique, the other a style. The entry on Neo-Renaissance covers one of the historical revival styles.

PeriodDevelopment in stained glass
Early 12th centuryTheophilus writes the main medieval treatise on the craft
1150 to 1550Peak of popularity in European churches and cathedrals
14th centurySilver stain is introduced
Start of the 19th centuryStained glass is effectively a dead art
19th centuryGothic Revival and Morris firm revive the craft
Around 1900Art Nouveau: Horta's Brussels buildings include stained glass canopies

Frequently asked questions

Is stained glass the same as a vitráž?
Yes. Vitráž is the Slovak term for stained glass. The Slovak heritage office lists vitráže among the artistic parts of architecture that are protected as part of a national cultural monument.
What are cames in a stained glass window?
Cames are H-shaped strips of lead that hold the edges of the glass pieces. They are soldered together, and the Victoria and Albert Museum calls them an integral part of a window's design.
What is silver stain on old glass?
Silver stain is a solution based mainly on silver nitrate that is applied to the back of the glass. It fires into the surface and gives tones from yellow to deep orange. It was introduced in the 14th century.
Who can restore a protected stained glass window in Slovakia?
The Slovak methodology says that when the regional heritage office decides on restoration, the work may be done by the Academy of Fine Arts (VŠVU) or by a member of the Chamber of Restorers. The decision on the method comes from the regional office.
Which natural forms did Art Nouveau glass use?
Art Nouveau designers drew on flowers, leaves, animals and insects, and on flowing whiplash lines, rather than on historical ornament. The Victoria and Albert Museum lists these as the style's sources of form.

Sources

  1. Stained glass: an introduction · Victoria and Albert Museum · Whole article
  2. How was it made? Stained glass · Victoria and Albert Museum · Whole article
  3. Stained glass: Gothic Revival and beyond · Victoria and Albert Museum · 19th-century revival; William Morris and the Arts and Crafts movement
  4. Art Nouveau: an international style · Victoria and Albert Museum · Belgium, France, Germany and Austria-Hungary sections
  5. Metodika princípov rozhodovania Pamiatkového úradu SR vo veciach stavebnotechnického /alebo reštaurátorského/ zásahu, časť B: Reštaurovanie výtvarných súčastí architektúry · Pamiatkový úrad SR · Introduction (artistic parts of architecture, stained glass list), restoration and conservation definitions, restoration category M6, restorer qualification passage