Arts and Crafts Movement
The Arts and Crafts Movement is a British reform movement of the late 19th century that championed handmade, well-made design against mass production.
What was the Arts and Crafts Movement?
The Arts and Crafts Movement was a British reform movement of the late 19th century. It responded to the damage that industrialisation had done to the decorative arts and to their low status. The V&A dates the recognition of that damage to around 1840, and says new approaches were championed in the 1860s and 1870s. The movement favoured well-made, beautiful objects for everyday use, produced in small workshops rather than by mass manufacture.
The movement took its name from the Arts and Crafts Exhibition Society, founded in London in 1887. The V&A notes that the term 'Arts and Crafts' was not widely used until the early 20th century, so the name came after the movement had already formed.
Who were Ruskin and Morris, and what did they argue?
John Ruskin supplied the argument. The V&A records that he held that separating designing from making was socially and aesthetically damaging. In 1870 he wrote that 'fine art is that in which the hand, the head, and the heart of man go together'.
William Morris turned that argument into practice. Tate ties the movement's origins to Morris's design firm, which grew out of the Pre-Raphaelite circle and which Tate dates to 1861. The firm recruited painters such as Dante Gabriel Rossetti, Ford Madox Brown and Edward Burne-Jones as artist-designers, and Tate describes the key principle as 'raising design to the level of art'. By the 1880s the V&A says Morris was known internationally as a designer and manufacturer.
Morris was not hostile to machines as such. The V&A says he saw the division of labour as a step in the wrong direction because it weakened workers' connection to their work, and he wanted to free people from repetitive tasks so they could enjoy craft from start to finish. Tate adds that his wallpapers and fabrics drew on natural motifs, especially plant forms treated as flat pattern.
| Year | Event | Source |
|---|---|---|
| 1861 | Morris's design firm founded, grown out of the Pre-Raphaelite circle | Tate |
| 1884 | Arts Workers Guild set up as one of the movement's societies | V&A |
| 1887 | Arts and Crafts Exhibition Society founded in London | V&A |
| 1888 | First annual exhibition, showing ceramics, textiles, metalwork and furniture | V&A |
| 1891 to 1896 | Morris becomes actively involved in the Exhibition Society until his death in 1896 | V&A |
How did the movement reach Vienna and Central Europe?
The V&A records that the Vienna Secession, founded in April 1897 by Gustav Klimt and colleagues who broke with the city's arts establishment, looked to recent foreign movements, including British Arts and Crafts, and was inspired by William Morris. In 1900 the Secession invited artists from England, Scotland and France to its 8th Exhibition, which gave British Arts and Crafts its first international platform.
The link continued through the Wiener Werkstätte. Josef Hoffmann and Koloman Moser founded it in 1902 with the aim of 'bringing art into the home', and Hoffmann had visited C. R. Ashbee's Guild of Handicraft in London, which served as its model. The workshop made metalwork, furniture, glass, ceramics and textiles, blending traditional, high-quality production methods with forward-looking aesthetics. The Viennese branch is covered in Vienna Secession, and the wider style in Art Nouveau.
The Hungarian branch is covered separately in Hungarian Secession.
| Feature | Arts and Crafts Movement (Britain) | Vienna Secession and Wiener Werkstätte |
|---|---|---|
| Founding date | Exhibition Society, 1887 | Secession in April 1897, Werkstätte in 1902 |
| Central figures | Ruskin, Morris, Walter Crane (first Exhibition Society president) | Klimt, Hoffmann, Moser |
| Model of production | Small workshops and a return to hand skill | Guild of Handicraft in London, adapted with modern aesthetics |
| View of machines | Morris accepted machines but opposed the division of labour | Werkstätte aimed to combine craft with modern design |
How did continental designers adapt the British model?
German designers adapted the model more readily to industry. The V&A notes that several German artists' colonies modelled themselves on British groups such as the Guild of Handicraft. The best known was at Darmstadt, led by Joseph Maria Olbrich from 1901 to 1914. The V&A also says that German designers generally found the British production model too anti-industrial, and accepted technology as long as quality was maintained.
Continental designers therefore took from the British model the idea that an object could be both artistic and well made, while accepting production methods the British reformers had resisted. The Vienna and German branches show two answers to the same question: how much of the workshop to keep once industry was part of the picture.
What did the Arts and Crafts Movement leave to modern design?
Nikolaus Pevsner's Pioneers of Modern Design: William Morris to Walter Gropius, first published in 1936, treated the movement as a starting point for modern design, a view Tate reports. The V&A says the honesty of expression in Arts and Crafts work helped catalyse the radical forms of Modernism.
In Britain the movement lost momentum after the First World War. The original Exhibition Society merged with the Cambridgeshire Guild of Craftsmen in 1960 to form the Society of Designer Craftsmen, according to the V&A.
How is the Arts and Crafts Movement different from Art Nouveau?
The V&A says Art Nouveau set out to revolutionise the tired historicism of traditional architecture and design, and calls the Vienna Secession Austria's leading Art Nouveau movement. The same museum records that the Secession was inspired by Morris. Art Nouveau is recognised mainly by its flowing line and natural forms. The Arts and Crafts Movement is recognised by its workshop method, its handmade objects and the social argument behind them.
What does the movement mean for a Slovak reader?
Slovak readers mostly meet the movement as background to secesia, the local name for Art Nouveau. The V&A records that the Vienna branch drew on it. The separate entries on Vienna Secession and Hungarian Secession cover the two branches. The decorative work of the period is covered in stained glass, and the ceramic facades in architectural ceramics.
Frequently asked questions
- Who started the Arts and Crafts Movement?
- John Ruskin supplied the philosophy and William Morris led the practical side. Ruskin argued that separating designing from making was socially and aesthetically damaging, and Morris put that argument into practice through his design firm and workshops.
- Where did the name Arts and Crafts come from?
- The name comes from the Arts and Crafts Exhibition Society, founded in London in 1887. The V&A notes that the term was not widely used until the early 20th century.
- Did the Arts and Crafts Movement reach Vienna?
- Yes. The Vienna Secession, founded in April 1897, looked to British Arts and Crafts and was inspired by William Morris. The Wiener Werkstätte, founded in 1902 by Josef Hoffmann and Koloman Moser, applied the same idea of combining craft with modern design.
- Was the Arts and Crafts Movement against machines?
- Not entirely. Morris was not opposed to machines as such, but he regarded the division of labour as harmful because it separated workers from their work. He wanted production that let people make something from start to finish.
- How is Arts and Crafts different from Art Nouveau?
- Art Nouveau is known mainly for its flowing line and natural forms, drawn from flowers, leaves, animals and insects. The Arts and Crafts Movement is known for its workshop method and the social argument behind it, and the V&A calls the Vienna Secession Austria's leading Art Nouveau movement, while also recording its inspiration from Morris.
Sources
- Arts and Crafts: an introduction · Victoria and Albert Museum (V&A) · Origins and key figures; The Arts and Crafts Exhibition Society; Machine production and social aims; Arts Workers Guild; Influence on continental Europe
- Arts and Crafts beyond the UK · Victoria and Albert Museum (V&A) · Austria (Vienna); Germany
- Arts and Crafts (art term) · Tate · Origins; Morris's role; Design approach; Legacy
- Art Nouveau: an international style · Victoria and Albert Museum (V&A) · Whole article