PV diverter
A PV diverter is a controller that feeds spare solar power into the immersion heater of a hot water cylinder instead of exporting it.
What is a PV diverter?
A PV diverter is a controller that sends solar electricity, which would otherwise go to the grid, into a heating element. The element is usually the immersion heater in a hot water cylinder. A current clamp on the meter tails detects the export. The diverter then varies its power so that the element uses what is spare. A pv magazine opinion article describes it this way. Sunsave describes the same job: a diverter directs excess solar electricity to an immersion heater to heat water.
How does a diverter decide how much power to send?
The controller reads the export and adjusts the power to the element. The manufacturer myenergi says its eddi decides more often than once a second how to use the generation. Because the element can run at any power level, a diverter can use a small surplus, however small. A heat pump has a minimum power draw and cannot do this. The limit is the sun. When the panels produce nothing spare, the diverter sends nothing and the water gets no heat from it.
The manufacturer Fronius describes its Ohmpilot controller in a similar way. It uses a very small amount of electricity to regulate the heating element in the boiler or storage tank. It uses surplus electricity to keep the water at a constantly high temperature. These are manufacturer statements about the mechanism, not performance data.
How does a diverter compare with a heat-pump boost and a battery?
Three ways exist to use surplus solar output. They differ in what the surplus turns into. The table gives the qualitative picture and contains no prices.
| Option | Where the surplus goes | What you get | Main limit |
|---|---|---|---|
| PV diverter | The electric immersion element in the cylinder. | Hot water. One kWh of electricity gives one kWh of heat in the water, as pv magazine puts it. | Works only while there is export. Cloudy days and winter give little or nothing. |
| Heat-pump hot-water boost | The compressor of a heat pump working in hot-water mode. | Hot water with more heat than the electricity put in. The Electrification of Heat trial measured a median seasonal performance factor of 2.80. It covered 291 UK air source heat pumps. | The compressor has a minimum power draw and works best on longer runs. Summer hot-water runs are less efficient than the annual figure. |
| Home battery | A battery that stores electricity. | Electricity for any later use, as Sunsave notes, while a diverter only heats water. | Sunsave says a diverter is unlikely to be cost-effective if you already have a battery. |
The heat-pump comparison matters only in a house that already has a heat pump or plans one. The pv magazine author is an installer. He argues that a heat pump in hot-water mode beats an immersion element for every kWh of surplus. This holds as long as it delivers more than one kWh of heat per kWh of electricity. The article itself says the annual 2.80 figure overstates summer performance, and it is one author's view. The figure comes from UK air source heat pumps, so check local conditions before relying on it.
When is a PV diverter a good fit?
A diverter fits a house that exports at midday and heats water with electricity. Sunsave says it is only useful if you have an immersion heater. It also states the seasonal limit: in winter or on cloudy days a diverter is not useful, because there is probably no surplus. A cylinder without an electric element gives the diverter nothing to feed, so check that first. Ask the installer to go through the points below before you buy.
| Check | Why it matters |
|---|---|
| Electric element in the cylinder | A diverter needs an electric element to feed. Check that one exists and works. |
| Supply phase and element rating | The diverter and the element have to suit the house supply. Ask the installer to check both. |
| Access to the meter tails | The pv magazine article describes the clamp on the meter tails, so the installer needs to reach them. |
| Export pattern | A diverter helps only if the house exports. Look at a full year of monitoring data, because the pattern changes with the season. |
| Existing battery | Sunsave says a diverter is unlikely to pay off next to a battery. Ask the installer to compare the two for your house. |
How is a PV diverter different from self-consumption?
Self-consumption is a measure: the share of PV output that the building uses on site. A diverter is one way to raise that share, because it moves surplus that would be exported into hot water. Sunsave calls it a budget-friendly way to boost self-consumption. A diverter does not change how much the panels generate or the size of the system. A home battery can raise the share too, because it stores electricity for any later use.
What are the common misconceptions about PV diverters?
The first misconception is that a small surplus is not worth using. A diverter can use any surplus, however small, because it can run the element at any power level. The second is that a diverter keeps water hot through a dark winter. It does not. Sunsave states that in winter and on cloudy days there probably is no surplus. The third is that a diverter replaces the main hot-water system. It only adds heat when there is a surplus, so the water still needs another heat source.
The sources reviewed for this page give no payback period that applies to Slovakia. Sunsave quotes UK prices, and they say nothing about a Slovak house. Do not rely on a payback figure without a calculation for your own house.
Where does a PV diverter sit in Slovak practice?
This page does not add a legal rule. Slovak rules on small sources, support and the active customer are described on the self-consumption page. A diverter is an equipment choice inside a house that already has a PV system. Before buying, ask the installer which hot-water option the house can use. Compare the diverter with a heat-pump water heater and with the existing electric storage water heater.
The blog post on hot water preparation in a family house compares six ways to heat water, including a PV diverter. It also explains why winter needs another heat source.
Frequently asked questions
- What is a PV diverter?
- A PV diverter is a controller that senses solar export and feeds the spare power to an immersion heater in a hot water cylinder. It uses only surplus, so it heats water only while the panels produce more than the house uses.
- Does a PV diverter work on cloudy days?
- Usually not. Without surplus it sends no power to the element. Sunsave, a UK solar advice site, notes that it is not useful in winter or on cloudy days because there is probably no surplus then.
- Is a PV diverter better than a heat pump?
- They are different options. A pv magazine opinion article argues that a heat pump in hot-water mode beats an immersion element per kWh of surplus. It cites a median seasonal performance factor of 2.80 for UK air source heat pumps. A diverter is simpler and works with an element that is already installed.
- Can a PV diverter and a battery share the same surplus?
- Yes, but they compete for it. A battery stores electricity for any later use, while a diverter only heats water. Sunsave says a diverter is unlikely to be cost-effective if you already have a battery.
- Does a PV diverter raise self-consumption?
- Yes. The energy it diverts into hot water is used on site, so the self-consumption share rises. The diverter does not change how much the panels generate or the size of the system.
- Is a small surplus worth diverting?
- Yes. A diverter can run the element at any power level, so it can use any surplus, however small, instead of exporting it.
Sources
- Surplus PV in UK homes: why the heat pump beats the immersion diverter for hot water · pv magazine (opinion article by Adam Dare, published 4 November 2026) · Opinion article
- Solar power diverters: are they worth it? [UK, 2026] · SunSave (UK solar advice site) · Page as last updated 12 November 2026
- Teplá voda: Pomocí fotovoltaiky (Hot water: with photovoltaics) · Fronius International (manufacturer product page, Czech version) · Product page
- eddi power diverter · myenergi (manufacturer) · Product page