Indirect hot water cylinder
An indirect hot water cylinder is a drinking water tank that a coil heats with hot water from a boiler or a heat pump.
What is an indirect hot water cylinder and how does it heat water?
An indirect hot water cylinder is an insulated storage tank for drinking water. A coil heats the water. The coil is a loop of pipe inside the tank. Hot heating water flows through the coil, and the coil passes its heat to the water around it. The heating water comes from a heat pump or from a boiler. Viessmann states that both conventional boilers and heat pumps can be the heat generator.
The defining feature is separation. The heating water runs in its own circuit. Viessmann puts it plainly: the heating water never mixes with the domestic hot water. Hot water for use leaves from the upper section of the tank, where the warmest water collects.
EU Regulation 814/2013 defines a hot water storage tank as a vessel with no heat generator of its own. It allows one or more back-up immersion heaters (Article 2, points 13 and 14). A back-up immersion heater is an electric resistance heater that works only when the external heat source fails.
How does the coil interact with a heat pump?
The coil is the point where the heat source and the stored water meet. Its surface area decides how easily heat crosses over. Caleffi states that an air-to-water heat pump needs an indirect water heater with a larger internal coil heat exchanger. It adds that the greater the surface area of the exchanger, the lower the fluid temperature leaving the heat pump can be. Lower operating temperatures increase the heating capacity and the coefficient of performance of the heat pump. That is why designers size the coil with the heat pump in mind.
The designer should ask the supplier for the coil surface area and for the flow temperature the coil needs. Then the designer checks that both match the heat pump at its design point. The manufacturer data sheet holds these values.
How is an indirect cylinder different from a hot water buffer tank?
This is a common confusion in mechanical design. An indirect cylinder and a hot water buffer tank can look alike, and a heat pump can feed both. They hold different water. Bosch states that a buffer tank stores heating water, while a domestic hot water cylinder stores drinking water.
| Aspect | Indirect hot water cylinder | Hot water buffer tank |
|---|---|---|
| Water stored | Drinking water | Heating water |
| Heat input | Through an internal coil from a boiler or heat pump (Viessmann) | Not covered by the sources opened for this page |
| Supplies taps and showers | Yes | No, it holds heating water |
How large should an indirect cylinder be for a family house?
The cylinder must cover the peak, for example several showers in a row, and not the daily total. A teaching document of the Faculty of Civil Engineering at STU in Bratislava quotes ČSN 06 0320. The table shows the doses it gives. Mixing hot water with cold water gives 1.5 times the volume at 40 °C.
| Use | Dose at 55 °C | Mixed water at 40 °C |
|---|---|---|
| One shower | 40 litres (2.10 kWh) | 60 litres |
| One bath | 80 litres (4.20 kWh) | 120 litres |
The same document gives the volume of the cylinder as V = Vz · (θz - θs) / (θ0 - θs). Vz is the mixed water at temperature θz. θs is the cold water temperature, and θ0 is the temperature in the cylinder.
Take one shower of 60 litres at 40 °C, cold water at 10 °C and a cylinder at 60 °C. The result is 60 · 30 / 50 = 36 litres. Four showers in a row need four times that, which is 144 litres. The blog article on hot water preparation works through the same example. The designer adds losses to the result and checks how fast the source reheats the cylinder.
The STU document says the old STN 06 0320 standard from 1986 gives oversized volumes for storage heating. It points to the revised ČSN 06 0320 from 2006, to DIN 4780 for apartment buildings and to the methods of water heater manufacturers. A larger cylinder also has a larger surface. The US Department of Energy notes that tank surface area rises with tank volume, and that a larger surface raises standby loss.
What is stratification and why does it matter?
Stratification is the layering of water by temperature inside the tank. Warm water is lighter than cold water, so the hottest layer sits at the top. Viessmann states that hot water is drawn from the upper section. The sources opened for this page give no rules for the coil position or the inlet layout. Ask the manufacturer for the intended layout, and do not change the connections of the cylinder on site.
What should a designer check in a Slovak family house?
Start from the heat source. If a heat pump feeds the cylinder, ask the supplier for the coil surface area and for the flow temperature that the coil needs. Check that both match the heat pump at the design point. Next, check the hot water distribution. The layout of the pipes, a circulation loop and the setting of a thermostatic mixing valve all change how the cylinder performs in daily use.
The temperature of the stored water is also a hygiene question. The World Health Organization states that Legionella grows in water systems at 20 to 50 °C, with an optimum near 35 °C. It advises keeping hot water above 50 °C, with water leaving the heating unit at 60 °C or more. The entry on legionella prevention covers the measures. A heat pump runs best at a low flow temperature, so a high storage temperature and a low coil temperature pull in different directions. Ask the designer to state both values.
Compared with an electric storage water heater, an indirect cylinder takes its heat from a central source. A heat pump water heater is a separate appliance with its own heat pump. It is a different choice from an indirect cylinder fed by a central heat pump.
What are the common misconceptions about indirect cylinders?
The first misconception is that a buffer tank and a cylinder are interchangeable. They are not, because one holds heating water and the other holds drinking water. The second is that a bigger cylinder always gives more comfort. A larger tank holds more water, but it also has a larger surface and loses more heat. The third is that the coil size does not matter with a heat pump. Caleffi links the coil surface to the heat pump outlet temperature, so it does matter.
Frequently asked questions
- What is the difference between an indirect hot water cylinder and a buffer tank?
- An indirect hot water cylinder stores drinking water for taps and showers. A buffer tank stores heating water for the heating circuit. Bosch states that a buffer tank holds heating water, unlike a hot water cylinder. A buffer tank does not supply domestic hot water.
- Can a heat pump heat an indirect hot water cylinder?
- Yes. Viessmann states that both conventional boilers and heat pumps can be the heat generator for an indirect cylinder. The heating water flows through the coil, and the coil passes the heat to the drinking water.
- Why does the coil surface area matter for a heat pump?
- A larger coil lets the heat pump run at a lower outlet temperature. Caleffi states that a greater surface area lowers the fluid temperature leaving the heat pump. Lower operating temperatures increase heating capacity and the coefficient of performance.
- Does the heating water mix with the drinking water?
- No. Viessmann states that the heating water never mixes with the domestic hot water. The wall of the coil separates the two circuits.
- How large should an indirect cylinder be?
- The size follows from the peak draw, not from the daily total. For a shower, ČSN 06 0320 as quoted by STU gives 40 litres at 55 °C. That is 60 litres mixed to 40 °C. The designer adds losses and checks how fast the source reheats the cylinder.
- What storage temperature limits Legionella?
- The World Health Organization advises keeping hot water above 50 °C, with water leaving the heating unit at 60 °C or more. Legionella grows between 20 and 50 °C, with an optimum near 35 °C.
Sources
- DHW cylinder: how it works · Viessmann · Indirect cylinder, heat generators, separation, draw-off
- 5 alternatives to heat pump water heaters · Caleffi · Indirect water heater with larger coil
- Zásobník teplé vody pro tepelné čerpadlo · Bosch Home Comfort (Czech) · Opening passage, buffer tank versus hot water tank
- Commission Regulation (EU) No 814/2013 of 2 August 2013, ecodesign requirements for water heaters and hot water storage tanks · European Commission, Official Journal of the European Union L 239 · Article 2, points 13 and 14
- Návrh prípravy teplej vody, Energetický audit a certifikácia budov, 2. modul (Peráčková, 2023) · Faculty of Civil Engineering, Slovak University of Technology in Bratislava · Slides 10 and 11 (ČSN 06 0320 doses), slide 61 (volume formula), slide 62 (standards for storage heating)
- Request for information on energy conservation standards for consumer water heaters (docket EERE-2017-BT-STD-0019) · US Department of Energy, Office of Energy Efficiency and Renewable Energy · Tank volume and surface area discussion
- Legionellosis, fact sheet · World Health Organization · Cause; Prevention