Electric storage water heater

An electric storage water heater is an insulated tank that heats and holds a set volume of water with an electric element, ready for use.

What is an electric storage water heater?

An electric storage water heater is an insulated tank that keeps a fixed volume of heated water ready for use. In Slovakia it is called an elektrický bojler. An electric heating element warms the water, and a thermostat stops the heating when the set temperature is reached. The EU ecodesign regulation for water heaters, No 814/2013, calls a heater with electric resistance elements a conventional water heater (Article 2, point 10). The tank is the main difference from an instantaneous water heater. It holds a reservoir of hot water, and the reservoir loses heat while it waits.

How does an electric storage water heater work?

When a tap opens, hot water leaves through the upper part of the tank, and cold mains water enters in the lower part. The element then reheats the stored water, and the thermostat cuts the heating at the set temperature. The Dražice manual for its vertical OKCE and OKHE units describes this principle. It states a single heating element of 2,200 W and a thermostat adjustable from 5 to 75 °C.

Other markets use other layouts. The US Department of Energy describes typical American residential units with two 4.5 kW elements, interlocked so that they never run together. The same guideline calls electric storage units nearly 100 percent efficient at converting input energy to stored heat. The Department of Energy adds that a heat pump water heater can be two to three times more efficient than an electric resistance heater.

Why does a storage tank lose heat when nobody uses hot water?

Standby loss is the energy a tank needs to keep its stored water at temperature. A US Department of Energy specification defines it as the average hourly energy needed to keep the stored water at temperature. It is given as a percentage per hour of the heat content of the stored water. The Department of Energy states that standby losses occur with storage water heaters regardless of hot water demand. An unused tank therefore still draws electricity through the night and through the day.

Two drivers are documented. The Department of Energy notes that tank surface area increases with tank volume. A larger surface raises the rate of heat transfer to the surrounding air. The Dražice manual states that a lower thermostat setting reduces electricity use. The table below turns these points into design advice.

Driver of standby lossWhat is documentedAdvice
Tank surface areaRises with tank volume, and a larger surface loses more heatChoose the smallest tank that covers the household peak draw
Thermostat settingA lower setting reduces electricity use (Dražice manual)Set the temperature only as high as the household needs, and check it against the hygiene section below
Hot water pipesNot covered by the sources opened for this pageKeep the first metres of hot water pipe short and insulated, especially in unheated rooms

Is it worth heating the tank at a cheaper electricity tariff?

It may be, but the sources opened for this page give no saving figure, so this section gives advice only. A cheaper tariff period helps only if the tank holds enough hot water for the rest of the day. The tank still loses heat after the cheap period ends, so timing moves the cost and does not remove the standby loss. Ask your electricity distributor for the hours of the cheaper period. Then compare them with the heating time of the tank, which the manufacturer lists in the manual for each model. Choose the tank size, the timer and the tariff together.

How often does the anode rod need attention?

A Dražice enamelled steel tank carries a magnesium anode rod. The Dražice manual recommends a check, and a replacement if needed, after two years of operation. It states that the calculated life of the anode is two years. The real life changes with the hardness and chemical composition of the local water. The result of the inspection then sets the date of the next replacement. The manual tells the owner to leave cleaning and anode replacement to a service company.

Not every tank has an anode. The US Department of Energy notes that glass-lined steel tanks use an anode rod, while plastic, stainless steel and stone-lined steel tanks do not. Ask the manufacturer for the inspection schedule of your own model.

Is an electric storage heater still sensible in a low-energy house?

In a well-insulated house the space heating demand is small, so hot water takes a larger share of the energy used. The article on domestic hot water preparation explains this. Standby loss from a large tank then matters more in relative terms. In a passive house design, a compact tank close to the main draw points suits a small household. The choice remains a project decision. Check it against the energy calculation for the house, and compare it with a heat pump water heater or an indirect hot water cylinder.

What hygiene limits apply to the stored hot water?

The World Health Organization states that Legionella bacteria grow in water systems at 20 to 50 degrees Celsius. The optimum is near 35 degrees. The WHO advises keeping hot water above 50 degrees, which requires water leaving the heating unit at 60 degrees or more. A higher setpoint means more heat lost every hour, so the setpoint is a design decision. Record it, and review it with the legionella prevention plan for the building.

The Dražice manual lists 60 °C as the recommended hot water temperature. For very hard water, it suggests a setpoint of at most 55 °C to limit scale. The two aims pull in different directions, so ask the installer to weigh scale against hygiene for your water supply.

How is an electric storage heater different from an instantaneous heater?

An electric storage heater keeps a reservoir of hot water at all times. It delivers hot water at once and pays for the reservoir in standby loss. An instantaneous water heater heats water only while it flows. A teaching document of the Faculty of Civil Engineering at STU in Bratislava notes that flow heating removes the store. It also removes the multiplication of bacteria in the store. The same document quotes ČSN 06 0320: the hot water flowing to a shower carries 12.0 kW of heat, and a bath 24.6 kW. A 2.2 kW element cannot supply that at the moment of use. A tank covers the peak, and a flow heater needs a much larger power input. An indirect hot water cylinder is a different design again. It stores heat that comes from a boiler or heat pump.

What should an owner check on an electric storage heater?

The table below lists the checks that the manufacturer manual names for the electric tank.

ComponentWhat to checkSource in the Dražice manual
Magnesium anodeCondition after two years of operation, then by the result of that checkMaintenance section
Scale in the tank and on the element sleeveCleaning after one to two years where the water is mineral-richMaintenance section
Thermostat settingSet only as high as the household needsEnergy saving, section 1.2.2
Frost protectionInstall the unit in a room that does not freezeInstallation section

Frequently asked questions

How does an electric storage water heater work?
A thermostat switches an electric heating element in an insulated tank. Hot water leaves from the top, and cold mains water enters at the bottom. When the water reaches the set temperature, the thermostat stops the heating.
Does an electric storage water heater waste energy when nobody uses hot water?
Yes. The US Department of Energy states that standby losses occur with storage water heaters regardless of hot water demand. The tank keeps replacing the heat that escapes through its walls. A larger tank has a larger surface, so it loses more.
Is a night tariff worth it for an electric water heater?
It can be, but this page gives no saving figure. A cheaper tariff only helps if the tank holds enough hot water for the whole day. Ask the electricity supplier for the cheaper hours and compare them with the heating time in the manual.
What is the anode rod and does it need servicing?
The anode is a magnesium rod in the tank of an enamelled-steel unit, and it needs regular checks. One Dražice manual recommends an inspection after two years of operation. The life of the rod depends on the hardness and chemistry of the local water.
What temperature should the hot water have?
The World Health Organization advises keeping hot water above 50 °C, with water leaving the heating unit at 60 °C or more. That limits Legionella growth, which happens between 20 and 50 °C. A higher setpoint also raises standby loss.
Is an electric storage water heater suitable for a passive house?
It can be, in a small household with modest hot water use. In a low-energy house, standby loss is a larger share of the energy used. Check the tank size, setpoint and location against the energy calculation.

Sources

  1. Strategy Guideline: Proper Water Heater Selection (revised April 2015) · Alliance for Residential Building Innovation, for the US Department of Energy Building America programme · Section 1.2 (standby losses); section 1.4.1 (individual water heaters)
  2. Electric Storage Water Heaters, draft technical specification v1.0 (29 February 2012) · Commercial Building Energy Alliance, Space Conditioning Project Team · Performance characteristics, standby loss
  3. Request for information on energy conservation standards for consumer water heaters (docket EERE-2017-BT-STD-0019) · US Department of Energy, Office of Energy Efficiency and Renewable Energy · Tank volume and surface area discussion; item h, grid-enabled water heaters
  4. Water heaters: heat pumps (energy basics) · US Department of Energy, Building Science Education Solutions Collaborative · Overview
  5. Návod k obsluze a instalaci: zásobníkový ohřívač vody pro svislou montáž OKCE, OKHE (dated 8-1-2021) · Dražice (manufacturer instruction manual, Czech) · 1.1 Popis funkce; 1.2.2 Úspory elektrické energie; technical table; 2.8 maintenance; installation notes
  6. Commission Regulation (EU) No 814/2013 of 2 August 2013, ecodesign requirements for water heaters and hot water storage tanks · European Commission, Official Journal of the European Union L 239 · Article 2, point 10
  7. Návrh prípravy teplej vody, Energetický audit a certifikácia budov, 2. modul (Peráčková, 2023) · Faculty of Civil Engineering, Slovak University of Technology in Bratislava · Slide 10 (table 1, ČSN 06 0320 outlet characteristics); slides 38 to 39 (flow heating)
  8. Legionellosis, fact sheet · World Health Organization · Cause; Prevention