Instantaneous water heater
An instantaneous water heater is a unit that heats water only while it flows through it, so it needs no storage tank.
What is an instantaneous water heater?
An instantaneous water heater, called prietokový ohrievač vody in Slovak, is a unit that heats water only while it passes through the appliance. It has no tank. When a tap opens, cold water enters the heater, a heating element raises its temperature, and hot water leaves at once. The STU lecture notes we opened define the type in the same way: the unit heats water while it flows through. They list gas and electric versions. The product pages we read describe electric units only, so this article covers electric models.
How does an instantaneous water heater work?
The heater starts when water flows. The Czech testing site Testado describes it plainly. The heater warms water only as it flows. Electronic control adjusts the power of the heating coils to the flow and the set temperature. Testado does not state a minimum switch-on flow for the models it lists.
Power and flow depend on each other. For a given temperature rise, the flow a unit can deliver grows with its power. Testado gives a sizing rule: power in kW equals flow in litres per minute, times the temperature rise in kelvin, times 0.07. For example, 5 litres per minute heated by 30 K needs about 10.5 kW. Treat the rule as a check on a product sheet, not as a design value for a specific house.
How much power does an instantaneous heater need?
Power decides whether a house can run one unit at all. The table lists the figures from the pages we opened. Each value is a manufacturer rating for one product, not a general requirement.
| Unit (source) | Rated power | Stated performance |
|---|---|---|
| Fala Sanito (Testado) | 3 to 3.6 kW | Heats water to 60 °C in about five seconds, with a lower flow |
| ELÍZ EHT 5.5 (Testado) | 5.5 kW | Up to 3 litres per minute of hot water |
| ELÍZ ELX 18 (Testado) | 18 kW | Up to 7.2 litres per minute at 35 °C |
| Small electronic unit (CLAGE) | 3.5 kW | Output at a tap flow of 2 litres per minute |
| 27 kW unit (Stiebel Eltron) | 27 kW, three-phase only | Enough for two to six basins, one or two sinks, or one shower or bath |
The electrical supply limits the choice. Testado explains that a socket circuit of 230 V and 16 A gives 3,680 W. Only a small heater up to about 3.7 kW fits, and it loads the whole circuit. The 18 kW unit runs on 3 × 400 V and needs three phases with a 3 × 32 A breaker. The Stiebel Eltron 27 kW unit works only on a three-phase supply. Its 13.2 kW single-phase unit is the biggest single-phase model on that page, and the company does not recommend it for filling a bath.
How is an instantaneous water heater different from an electric storage water heater?
The two types solve the same problem in different ways. A storage heater keeps a full tank hot, and an instantaneous heater keeps nothing hot. The comparison below uses the statements in the pages we opened. For the tank design, see electric storage water heater.
| Feature | Instantaneous heater | Storage heater |
|---|---|---|
| Water held hot | None | A full tank, kept at the set temperature |
| Standby energy | None, according to CLAGE | Uses power every day, whether or not water is drawn, according to CLAGE |
| Flow and temperature | More limited, according to Stiebel Eltron | Better flow and higher temperatures, according to Stiebel Eltron |
| Power input | Larger, according to the STU lecture notes | Smaller, because the tank volume covers the peak draw, according to the STU lecture notes |
| Outlets served | One outlet or a small group | Small unvented units of 5 to 15 litres can supply more than one outlet, according to Stiebel Eltron |
The storage tank also takes space. CLAGE notes that a storage unit under a sink can take up all the space there. It adds that a depleted tank must heat new water again, which can take an hour or longer depending on the unit.
Where does an instantaneous heater make sense?
CLAGE says small instantaneous units work very well on small hand-wash basins. It also says they can provide unlimited hot water, while a depleted storage tank needs time to reheat. That statement describes the supply of hot water, not the flow. Stiebel Eltron says the same units are more limited in flow and temperature than storage heaters. One unit for a whole kitchen and bathroom is therefore a different question.
For a whole house, the sources we opened do not support a single small unit. The Stiebel Eltron 27 kW unit would struggle to run more than one application at the same time, even with a three-phase supply. A whole-house hot water design usually starts from the central system, described in domestic hot water preparation.
How does an instantaneous heater fit a house with a heat pump?
We found no source on how common these units are in Slovak houses with heat pumps, so this article gives no market share. The reasoning that follows is design advice, not a rule. A heat pump can feed a cylinder, as described in indirect hot water cylinder, or a dedicated heat pump water heater. A cylinder stores heat that the heat pump delivers over time. A flow heater needs a larger power input, so adding one to a house that already runs a heat pump means checking the supply. For example, Testado says an 18 kW unit needs three phases and a 3 × 32 A breaker. Ask the electrical installer to check the load before you choose a flow heater for the main supply.
What are common misconceptions about instantaneous heaters?
- Unlimited hot water means unlimited flow. The unit does not run out of hot water. The Testado rule shows that the flow it can heat depends on its power and on the temperature rise.
- A small unit can serve the whole house. The manufacturer examples are single outlets or a small group of basins.
- Any socket can power it. Testado says only a heater up to about 3.7 kW fits a 16 A socket circuit, and the 18 kW unit needs three phases.
Frequently asked questions
- Are instantaneous water heaters more efficient than storage heaters?
- CLAGE states that instantaneous water heaters do not consume standby energy, while storage heaters use standby power every day. The STU lecture notes, however, list higher energy consumption and a larger power input for flow heaters, without figures. The pages we opened give no measured comparison, so the saving depends on how the unit is used.
- How much power does an electric instantaneous water heater need?
- The units we read range from about 3 to 3.6 kW for small models to 18 kW and 27 kW for larger ones. Testado says the 18 kW unit needs three phases (3 × 400 V). Stiebel Eltron says its 27 kW unit works only on a three-phase supply.
- Can one instantaneous heater supply a whole house?
- The manufacturer examples we opened serve one outlet or a small group of basins. Stiebel Eltron says its 27 kW unit would struggle to run more than one application at once. Whole-house supply needs a different design.
- How do I estimate the power for a flow heater?
- Testado gives the rule: power in kW equals flow in litres per minute, times the temperature rise in kelvin, times 0.07. For example, 5 litres per minute heated by 30 K needs about 10.5 kW. Use the rule to check a product sheet, and ask the electrical installer to check the result.
- Can I plug an instantaneous heater into a normal socket?
- Only a small one. Testado says a 230 V socket circuit of 16 A gives 3,680 W. A heater up to about 3.7 kW fits, and it loads the whole circuit. An 18 kW unit needs three phases and a 3 × 32 A breaker.
- Does an instantaneous heater fit a house with a heat pump?
- It can serve a single point of use, but the sources we read do not present it as the main hot water supply. The STU lecture notes we opened say a flow heater needs a larger power input than a storage heater. Check the electrical supply first.
Sources
- Průtokové ohřívače vody · Testado.cz · How it works; power ranges; sizing formula
- Instantaneous vs stored water heaters · Stiebel Eltron UK · FAQ comparison
- Comparison of instantaneous and storage water heaters · CLAGE · Comparison of instantaneous and storage heaters
- Energetický audit a certifikácia budov, modul 2: ohrev teplej vody · Slovenská technická univerzita v Bratislave, Stavebná fakulta · Slides 24 to 25 (flow and storage heater types) and slide 30 (storage heater advantages)