Heat pump water heater

A heat pump water heater is a hot water tank with a built-in heat pump. It moves heat from surrounding air into the water and makes no space heating.

What is a heat pump water heater?

A heat pump water heater is a hot water storage tank with a heat pump built in. The heat pump takes heat from the surrounding air and moves it into the water. The unit uses electricity to move heat and not only to make it. The EU ecodesign rules, Regulation 814/2013, define a heat pump water heater (Article 2, point 11). It is a water heater that uses ambient heat from air, water or ground, and or waste heat. The US Department of Energy adds that these units work on the same principle as whole-house air-source heat pumps.

The unit is a different product from a whole-house heat pump. It makes domestic hot water and does not heat rooms. Compare it with an electric storage water heater to see what changes: the heat source changes, and the tank stays.

Where does a compact unit take its heat from?

The Slovak energy agency SIEA describes compact storage units with a built-in heat pump. They take heat from the air in the room, or through an air hose from a shower, a WC or another heat source nearby. The Department of Energy states that the unit pulls heat from the surrounding air into the tank instead of conditioning the home. Regulation 814/2013 also allows water and ground sources, so a unit does not always draw room air.

SIEA also states that a larger hot water storage tank pays off with a heat pump more than with other ways of heating water. Ask the supplier how long the unit needs to reheat the tank after a peak draw.

Where should a heat pump water heater be placed?

Place the unit where the heat it takes from the air is harmless or useful. If a unit takes its heat from room air, that room loses heat. A bedroom, a room that needs its heat or a small unheated space is a poor choice. A utility room or a warm, ventilated space suits the unit better. A unit that takes air through a hose from a shower or WC uses air that the building already extracts.

SIEA advises that an outdoor evaporator should not stand near a bedroom window or a neighbour's house. It adds that a fan that is not loud can still be annoying at night. Check the manufacturer's installation data for the air volume the unit moves, the hose length it allows and the clearance it needs. These limits differ by model.

How is a heat pump water heater different from a whole-house heat pump?

Both move heat from a source into the building, but they serve different loads. The heat pump water heater makes domestic hot water only. A whole-house heat pump heats rooms, and it often also makes hot water. SIEA describes a combined system with one heat pump. It supplies two outlet temperatures, for example about 40 °C for the heating circuit and about 50 °C for hot water. An automatic switching valve connects the two circuits. A stand-alone water heater needs no such valve, because it has one job.

If you want both heating and hot water from one heat source, the seasonal coefficient of performance article is the right starting point. An indirect hot water cylinder fed by a central heat pump is a different design from a stand-alone unit.

How efficient is it, and what does COP mean here?

A US draft specification for electric storage and heat pump water heaters defines the coefficient of performance (COP). It is the heating capacity in kW divided by the power input in kW at a given set of rating conditions. The same document says COP helps compare heat pump water heaters. It does not represent field performance when a second heater tops up the water.

Regulation 814/2013 uses a different measure. It sets a minimum water heating energy efficiency (Article 2, point 15). This is the useful energy that the heater provides, divided by the energy needed to generate it, in %. Annex III sets the standard rating conditions for the test. Heat pump water heaters follow one table of rating conditions, and units that use ventilation exhaust air as the heat source follow another.

FactorEffect on COPSource
Outlet water above 50 °CLowers the COPSIEA
Larger storage tankPays off with a heat pumpSIEA
Rating conditions of the testSet per heat source in Annex IIIRegulation 814/2013

This article quotes no COP figure for a product. Compare two COP values only when the manufacturer states the same test standard and the same air and water conditions.

How loud is it?

Annex II to Regulation 814/2013 sets a maximum sound power level for heat pump water heaters, from 26 September 2015. The limit is higher for outdoor units than for indoor units, and it rises with the rated heat output.

Rated heat outputIndoors (dB LWA)Outdoors (dB LWA)
6 kW or less6065
Over 6 kW, up to 12 kW6570
Over 12 kW, up to 30 kW7078
Over 30 kW, up to 70 kW8088

Sound power describes the unit itself. The sound a person hears depends on distance and on the room. The same unit can be quiet in a large room and intrusive in a small one. SIEA notes that a compact indoor unit needs soundproofing. Compare the declared sound power on the datasheet with the marketing text, and ask which test standard the manufacturer used.

How does the unit handle Legionella?

The World Health Organization advises keeping hot water above 50 °C, with water leaving the heating unit at 60 °C or more. Legionella grows at 20 to 50 °C. Yet SIEA states that an outlet water temperature above 50 °C lowers the COP of a heat pump. So the storage temperature and the efficiency pull in different directions. As an example, SIEA names a temporary heating of the tank water, for example once a week for 2 hours above 70 °C. The entry on legionella prevention covers the measures for the whole building. Ask the supplier for the schedule and the setpoints of your unit.

What do people commonly get wrong about these units?

Several assumptions cause disappointment after installation. Check each one before you order.

  • It heats the house. It makes hot water only.
  • Any room will do. A unit that takes room air removes heat from that room, so placement changes comfort.
  • A higher COP is always better. A COP is valid at one set of rating conditions.
  • It is silent like an electric cylinder. A heat pump unit has a fan and a compressor, and Annex II limits its sound power.
  • The tank size does not matter. SIEA states that a larger tank pays off with a heat pump.

The instantaneous water heater and the indirect hot water cylinder are the other two common ways to make hot water. A hot water buffer tank stores heating water, not drinking water.

Frequently asked questions

Does a heat pump water heater heat the whole house?
No. It makes domestic hot water only. The EU ecodesign rules define a water heater by the hot water it makes. Heating rooms needs a heat pump heating system, which is a separate product.
Can I put the unit in a bedroom or a cold room?
Avoid it. SIEA, the Slovak energy agency, states that compact units take heat from room air, so the unit removes heat from that room. SIEA also notes that fan noise from an outdoor evaporator can be annoying at night. A utility room suits an indoor unit better.
What does COP mean on a heat pump water heater datasheet?
COP is the heating capacity divided by the electrical power input, at a given set of rating conditions. Compare two COP values only when the manufacturer measured them under the same standard and the same air and water temperatures.
Is a heat pump water heater quieter than an electric cylinder?
No. A heat pump unit has a fan and a compressor, and an electric storage tank has neither. Annex II of Regulation 814/2013 sets a maximum sound power level for heat pump water heaters, for example 60 dB indoors up to 6 kW.
Why does the tank sometimes heat to above 70 °C?
SIEA gives a weekly heating of the tank above 70 °C for about two hours as an example of Legionella protection. The tank water is heated briefly to a higher temperature. Check your own unit's manual for its schedule.
How much more efficient is it than an electric heater?
The US Department of Energy states that a heat pump water heater can be two to three times more efficient than an electric-resistance heater. The manufacturer data sheet gives the figures for each unit.

Sources

  1. Commission Regulation (EU) No 814/2013 of 2 August 2013, ecodesign requirements for water heaters and hot water storage tanks · European Commission, Official Journal of the European Union L 239 · Article 2, points 11, 15 and 16; Article 3
  2. Commission Regulation (EU) No 814/2013, Annex II, ecodesign requirements · European Commission, Official Journal of the European Union L 239 · Annex II, point 1.4
  3. Commission Regulation (EU) No 814/2013, Annex III, measurements · European Commission, Official Journal of the European Union L 239 · Annex III, point 5 and tables 4 and 5
  4. Ako vybrať tepelné čerpadlo · SIEA, Slovak Innovation and Energy Agency · Hot water preparation; compact units; noise; Legionella
  5. Water heaters: heat pumps (energy basics) · US Department of Energy, Building Science Education Solutions Collaborative · Overview
  6. Electric Storage Water Heaters, draft technical specification v1.0 (29 February 2012) · Commercial Building Energy Alliance, Space Conditioning Project Team · Efficiency metrics, coefficient of performance
  7. Legionellosis, fact sheet · World Health Organization · Cause; Prevention