Hot water circulation loop

A hot water circulation loop is a pipe loop with a pump that keeps hot water moving so it reaches the tap quickly.

What is a hot water circulation loop?

A hot water circulation loop is a second pipe that runs from the water heater to the far taps and back again. A small pump keeps the water moving around it. The loop is a distribution measure, not a heating measure. The heater makes the hot water, and the loop only decides how quickly that water arrives at the tap. In Slovak the system is called cirkulácia teplej vody.

The US Department of Energy report by Dentz and colleagues explains why loops exist. Hot water must reach spaces that are far from the water heating plant, so loops are more common in larger buildings. Without a pump, residents run the faucet until the cooled, stagnant water leaves the pipe. They waste water in the process.

The cost is that the loop is a permanent heat source to the surrounding air. The pipes keep losing heat even when nobody uses water. The design and control of the loop therefore matter as much as the pump.

How does a circulation loop lose heat when nobody uses water?

The report says that in buildings with intermittent hot water use, a recirculation loop can increase energy use. The supply and return piping lose heat all the time, even when demand is low. The report quotes a study of schools in which 90 % of the system energy input was lost from the distribution piping. It also says distribution losses in multifamily buildings can reach 30 to 50 % of the energy input.

The report cites a California field survey of 32 multifamily and commercial buildings by the Heschong Mahone Group. On average only 35 % of the energy input reached the user. About 33 % was lost in the recirculation loop, 1 % in the branch pipes and about 31 % at the water heater. These figures come from large buildings with long loops. They show the scale of the problem, not what a family house will see.

The report also says that system layout, return pipe size and pipe insulation level affect the energy use of a loop. ENERGY STAR makes the same point. A recirculation system that runs continuously can use more energy than it saves, because of the pump energy and the heat lost from the pipes.

How do timer, temperature and demand controls differ?

The control decides when the pump runs, and that decides how much of the loss the building avoids. The report lists five common control strategies. The table below summarises each one and what the report says about its limits.

ControlWhen the pump runsWhat the report says about it
Continuous (uncontrolled)All the timeThe most common mode in multifamily buildings, used as the baseline for comparison.
TimerDuring peak use times, and off overnightIf a user draws water while the pump is off, the user waits and may waste water.
Temperature (aquastat)When the loop temperature falls below a targetReduces pump electricity only. The piping stays hot even with no demand, so fuel use does not fall.
Timer with temperatureBoth rules togetherThe report groups it with timers and temperature controls as less effective than demand and temperature modulation.
Temperature modulationLowers the hot water set point when demand is expected to be lowThe report lists it as one of the most effective energy savers.
DemandWhen flow shows a tap is open and the return water is coolReduces pump runtime by 99 % or more in the report's four test sites. Costs more than timers or aquastats.

The report quotes control prices from a 2008 US source. Timer, temperature and timer with temperature controls cost $25 to $200. Demand and temperature modulation controls cost $750 to $2,000. Treat these as US prices from 2008, not as a Slovak quote.

The ENERGY STAR page lists button, timer and motion-sensor triggers for demand systems. It says the control turns the pump off when the water reaches the desired temperature. In the report's demand control, the pump runs only when two conditions hold. The makeup water flow sensor shows that a tap is open, and the return water is below a set point of about 38 °C. If the pump has been idle for more than 5 hours, the controller starts it until the return water exceeds about 43 °C. The report gives these set points in degrees Fahrenheit. The values here are converted.

The savings differ between studies. The table shows the fuel savings the report gives against continuous recirculation.

ControlFuel savingWhere the report gets it
Demand15 %One study cited in the report
Simple pump timer9 %The same cited study
Thermostat pump control10 %The same cited study
Demand6 to 7 %The report's own tests at four sites
Temperature modulation2 %The report's own tests at four sites
Demand with temperature modulation15 %The report's own tests at four sites

How is a circulation loop different from Legionella prevention?

A circulation loop is a comfort and efficiency measure. Legionella prevention is a health measure. The two overlap because both depend on water temperature, but they answer different questions. The loop reduces the wait for hot water. Legionella prevention keeps bacteria from growing in the water system.

The World Health Organization (WHO) says Legionella lives and grows in water systems at 20 to 50 degrees Celsius. The optimum is 35 degrees. It identifies artificial water systems in buildings as the most likely sources of disease. The infection route is inhalation of contaminated aerosols. Its advice is to keep hot water above 50 °C and cold water below 25 °C, ideally below 20 °C. It also advises weekly flushing of unused taps to reduce stagnation.

A loop does not replace those measures. If a loop holds water between 20 and 50 °C for long periods, it keeps the water in the range where WHO says Legionella grows. Plan the loop and its control with the WHO advice in mind. In Slovakia, Act 355/2007 Coll. on public health states in § 17e ods. 2 that the hot water temperature at the final consumer's outlet is at least 50 °C and at most 55 °C. The paragraph does not mention loops or return temperatures. The full treatment of the topic is in legionella prevention.

When is a circulation loop worth it in a family house?

The DOE report studies multifamily buildings, where the pipe run is long. A 2009 article by Valášek on the TZB-info site looks at smaller buildings. It recommends a hot water network without a circulation pump for smaller buildings such as family houses. It gives an efficient energy mode for a pipe length up to 10 m. It calls up to 14 m acceptable, with the kitchen sink no more than 3 m from the cylinder. The article says daily heat losses limit the length of a system without circulation. At the limit, they equal the losses of a circulation system including its pump energy.

As design advice, ask whether the house has a pipe run longer than those limits before you add a loop. If you add one, the DOE report highlights the system layout, the return pipe size, the insulation level and the control type. Valášek states that quality insulated pipe should not lose more than 10 W per metre.

The heater type also matters. A storage system keeps a large volume of water hot, and the loop then draws from that store. Examples are an indirect hot water cylinder and a heat pump water heater. An instantaneous water heater at the tap needs no pipe run to the tap at all. A thermostatic mixing valve at the outlet is a separate question: it protects users from scalding and does not control the loop. For the wider picture, see domestic hot water preparation.

Frequently asked questions

What does a hot water circulation loop do?
It keeps hot water moving through a second pipe that returns to the water heater, so hot water reaches the far taps sooner. The US Department of Energy report says this spares users the wait. It also saves the water that would otherwise run to waste.
Does a circulation loop waste energy?
It can. The pipes lose heat all the time, and the pump uses electricity. ENERGY STAR says a loop that runs continuously can use more energy than it saves. The DOE report says distribution losses in multifamily buildings can reach 30 to 50 % of the energy input.
Which control is best for a circulation pump?
The DOE report calls timer and temperature controls less effective than demand and temperature modulation controls. A timer makes users wait when they draw water while the pump is off. A temperature control saves pump electricity only and does not reduce fuel use.
Does a circulation loop prevent Legionella?
No. A loop is a comfort and efficiency measure. WHO says Legionella grows at 20 to 50 °C. It advises hot water above 50 °C, cold water below 25 °C, and weekly flushing of unused taps.
Should I insulate the circulation pipes?
The DOE report says pipe insulation levels and return pipe size affect the energy use of a loop. A 2009 article by Valášek says quality insulated pipe should not lose more than 10 W per metre.
Is a loop needed in a small family house?
Often not. Valášek recommends distribution without a circulation pump for smaller buildings such as family houses. He calls a pipe length up to 10 m efficient. He calls up to 14 m acceptable, with the kitchen sink no more than 3 m from the cylinder.

Sources

  1. Control strategies to reduce energy consumption of central domestic hot water systems · US Department of Energy, Building America (Dentz and colleagues) · Section 1 Introduction; Section 1.1 Background and control list; Section 2.2.2 Demand Control; results summary
  2. Demand hot water recirculating system · ENERGY STAR · Product description and controls
  3. Legionellosis · World Health Organization · Key facts and sections on sources and prevention
  4. Zdôvodnenie návrhu distribučnej siete teplej vody bez alebo s cirkulačným čerpadlom · TZB-info (J. Valášek, 2009) · Conclusion
  5. Zákon č. 355/2007 Z. z. o ochrane, podpore a rozvoji verejného zdravia · Slov-lex · § 17e ods. 2