Power Purchase Agreement (PPA)

A power purchase agreement is a contract in which a buyer takes electricity directly from a producer. EU and Slovak law define it for renewables.

What is a power purchase agreement?

A power purchase agreement (PPA) is a contract in which a buyer agrees to purchase electricity directly from a producer. Directive (EU) 2018/2001 (RED II) defines the "renewables power purchase agreement" in Art. 2 point 17 as a contract under which a natural or legal person agrees to purchase renewable electricity directly from an electricity producer. The word "directly" separates a PPA from a normal supply contract with a supplier that buys on the market.

Is the PPA defined in Slovak law?

Yes. Act No. 309/2009 Z. z. defines the "contract on the purchase of electricity from renewable energy sources" (zmluva o nákupe elektriny z obnoviteľných zdrojov energie) in § 2 ods. 1 písm. q). It is a contract in which an electricity customer agrees to take electricity from renewable sources directly from the producer. The same paragraph defines peer-to-peer trading (partnerské obchodovanie) in písm. r) as a sale of renewable electricity with pre-set conditions for automatic execution and settlement.

The Slovak term covers renewable electricity only. The definition sets no price, contract length or minimum volume. This page gives no typical values for them, because the sources checked contain no official statement on Slovak market practice.

What does EU law require for PPAs?

EU law requires Member States to assess the barriers to long-term PPAs and to remove unjustified ones. RED II Art. 15 ods. 8 says that the agreements must not face disproportionate or discriminatory procedures or charges. It also says that Member States describe their measures in their national energy and climate plans.

RED II Art. 22 ods. 2 písm. a) gives a renewable energy community the right to sell renewable energy through PPAs. Art. 21 ods. 2 písm. a) gives renewables self-consumers the right to sell their surplus renewable electricity through PPAs.

Does a house owner need a PPA for a photovoltaic array?

No. A house owner who uses the electricity from their own photovoltaic array does not need a PPA. See self-consumption. A producer in a local source (lokálny zdroj) is a customer. The customer's metering point is the same as the connection point of the source (§ 4b ods. 1 of Act 309/2009). Such a producer may deliver surplus electricity to a customer under a PPA or through peer-to-peer trading (§ 4b ods. 13). The act keeps the rules on authorisation to do business in energy unchanged (§ 4b ods. 13).

For the usual ways to sell surplus, see feed-in of surplus and net metering.

Frequently asked questions

What is a power purchase agreement (PPA)?
A PPA is a contract in which a buyer agrees to purchase electricity directly from a producer. RED II Art. 2 point 17 defines it for renewable electricity. Slovak Act 309/2009 § 2 ods. 1 písm. q) has the same idea.
What is a PPA called in Slovak law?
The act uses "zmluva o nákupe elektriny z obnoviteľných zdrojov energie". § 2 ods. 1 písm. q) of Act 309/2009 Z. z. defines it as a contract by which a customer takes renewable electricity directly from the producer.
Does EU law regulate PPAs?
RED II Art. 15 ods. 8 requires Member States to assess barriers to long-term renewables PPAs and to remove unjustified ones. The agreements must not face disproportionate or discriminatory procedures or charges.
Can a producer with a rooftop array sell surplus under a PPA in Slovakia?
Yes, a producer in a local source may supply a customer under such a contract or through peer-to-peer trading (§ 4b ods. 13 of Act 309/2009). The rules on authorisation to do business in energy still apply.
Does a house owner need a PPA to use their own solar electricity?
No. Using your own electricity at the same metering point does not need a contract with a buyer. A PPA matters when the electricity goes to another customer.

Sources

  1. Zákon č. 309/2009 Z. z. o podpore obnoviteľných zdrojov energie a vysoko účinnej kombinovanej výroby a o zmene a doplnení niektorých zákonov · Slov-Lex · § 2 ods. 1 písm. q) a r), § 4b ods. 1 a 13
  2. Directive (EU) 2018/2001 of the European Parliament and of the Council of 11 December 2018 on the promotion of the use of energy from renewable sources · Official Journal of the European Union · Art. 2 point 17, Art. 15 ods. 8, Art. 21 ods. 2, Art. 22 ods. 2