Monobloc heat pump
A heat pump with all parts in one outdoor unit, so the refrigerant stays outside and only water pipes and power cables reach the house.
What is a monobloc heat pump?
A monobloc heat pump is an air-to-water heat pump that has all its components in one outdoor unit. The Joint Research Centre (JRC) of the European Commission describes monoblocks in the same way: single-unit systems with all components integrated into one outdoor unit. Under the EU ecodesign rules the appliance is a heat pump space heater. It takes ambient heat from the air and gives it to a water-based central heating system. It may have a supplementary heater that uses an electric element or burns fuel. The heat leaves the unit as water, so water pipes and power cables connect a monobloc to the house.
One manufacturer's installation manual shows what sits inside the outdoor casing. In the Midea R290 monobloc of that manual, the hydraulic module holds an automatic air purge valve, an expansion vessel and an optional backup heater. Other makers differ, so ask the installer for the manual of the exact unit.
How does a monobloc differ from a split system?
The difference is in the build of the unit. The JRC separates air-to-water units into monoblocks and split units. A split heat pump has a separate outdoor unit and indoor unit, joined by refrigerant lines. The JRC says this gives flexibility in installation and design. A monobloc has no indoor refrigerant part, so no refrigerant line runs between two units.
| Feature | Monobloc | Split |
|---|---|---|
| Main parts | One outdoor unit with all components | Separate outdoor and indoor units |
| Link between the parts | None inside the unit, the heat goes to the house as hot water | Refrigerant lines between the two units |
| Design freedom | Fixed by the design of the unit | The JRC notes flexibility in installation and design |
Why does the monobloc layout change the frost design?
The water circuit of a monobloc runs between the outdoor unit and the building, so part of it is outside. The Midea manual treats this as a design duty. It says the whole water loop, including the outside pipes, must be insulated to prevent freezing of the outside water pipes in winter. It also describes two freeze protection methods. In the first, software uses the heat pump, an electric heating tape or the backup heater to warm the water when it gets cold. In the second, the installer fills the circuit with glycol, and the glycol share depends on the lowest expected outdoor temperature.
The same manual gives two conditions. The software protection works only while the unit has power, so the unit must stay switched on. If the power stays off for a long time, the water in the pipes must be drained. An architect can ask the installer to state the chosen frost protection method in writing before the drawings show the pipe route.
Where does the water from the unit go?
An air-source unit also produces condensate on its outdoor coil, and during a defrost cycle ice on the coil melts. The Midea manual says the condensate must drain to a frost-free area. On soft ground the manual calls for a downpipe into a gravel bed. A self-regulating heating cable in the downpipe stops the condensate from freezing. On a solid base, the pipe goes to a sewer, pump sump or soakaway. For cold climates, the manual strongly recommends a belt heater to avoid damage from drain water that freezes.
Why are monobloc heat pumps growing across the EU?
The JRC 2025 status report gives annual sales of air-to-water monoblocks and split units. It takes the figures from the European Heating Industry association.
| Unit type | Sales 2019 | Sales 2024 | Change |
|---|---|---|---|
| Air-to-water monobloc | 108,000 | 357,000 | 232% |
| Air-to-water split | 315,000 | 374,000 | 19% |
The report links the growth to the F-Gas Regulation. It says the regulation pushed manufacturers from HFC refrigerants toward propane, a natural refrigerant that is more compatible with monobloc systems. The report estimates that propane models were 50% of monobloc sales in 2025. For the refrigerant itself, see R290 refrigerant. The Midea manual marks its R290 unit as containing flammable A3 refrigerant and tells the installer to follow the safety precautions in the manual.
How is efficiency measured for a monobloc unit?
Regulation (EU) No 813/2013 defines the seasonal coefficient of performance (SCOP) of a heat pump space heater. It is the reference annual heating demand divided by the annual energy consumption, representative of the designated heating season. From 26 September 2017 the seasonal space heating energy efficiency of a heat pump space heater must not fall below 110%. For low-temperature heat pumps the minimum is 115% (Annex II, point 1(b)). The declared value comes from standard test conditions, so it describes the unit and not a particular house. For the concept itself see heat pump SCOP.
What does the energy label say about noise?
Regulation (EU) No 811/2013 defines the sound power level as the A-weighted sound power level, indoors and/or outdoors, in dB. The label layout for heat pump space heaters has a field for the sound power level, indoors if applicable and outdoors. An architect can therefore compare the outdoor figure of two units from the label or product data before choosing a position. For the term, see sound power level. The label gives the level of the unit, not the level at a neighbour's window.
What should an architect check on a monobloc project?
The checks below come from one manufacturer's manual and the rules above. They do not replace the manual of the unit the installer fits.
- Frost protection of the outside water pipes: insulation, the method chosen and the rule that the unit stays powered.
- Condensate route to a frost-free area, with a heating cable or belt heater in cold climates.
- Base of the unit: the Midea manual allows a foundation with bolts or, without a foundation, anti-vibration pads.
- Snow: in cold climates the manual puts the rear of the unit against a wall and adds a lateral canopy. It also asks for a high pedestal or wall mount, with at least 100 mm clearance from snow.
- Refrigerant and certificates for the installer, as set out for the split heat pump.
In short, a monobloc keeps the refrigerant circuit in one outdoor unit and moves the frost question to the water pipes. Treat the pipe route, the condensate drain and the unit position as early design decisions. Check them against the air-to-water heat pump concept that the rest of the system follows.
Frequently asked questions
- Is a monobloc heat pump the same as an air-to-water heat pump?
- No. Monobloc is a type of air-to-water heat pump. The JRC splits air-to-water units into two kinds. Monoblocks have all components in one outdoor unit. Split units have separate outdoor and indoor units joined by refrigerant lines.
- Does a monobloc heat pump need an indoor unit?
- It needs no indoor refrigerant unit, because all components are in the outdoor unit. A hot water tank or other water side parts can still stand inside the house. The installer joins them with water pipes.
- Why are the water pipes of a monobloc a frost risk?
- The water circuit runs from the outdoor unit to the house, so part of it is outside. One manufacturer manual requires insulation of all water pipes and freeze protection by software or glycol. It also says to leave the power on and to drain the water if the power stays off for long.
- Which refrigerant do monobloc units use today?
- Many newer units use R290 (propane). The JRC 2025 report estimates that propane models were 50% of monobloc sales in 2025. Propane is flammable. The installer must follow the safety rules in the manual.
- Where do I find the noise of a monobloc unit?
- On the energy label and product data. Regulation (EU) No 811/2013 puts a sound power level on the label of heat pump space heaters, outdoors and, if applicable, indoors. It describes the unit, not the level at a neighbour.
- Does a monobloc installer need a certificate?
- Often yes. Regulation (EU) 2024/573 requires certified persons for installation, servicing and repair of heat pumps. It also covers relevant alternatives to fluorinated gases, such as natural refrigerants. Ask the installer to show the certificate.
Sources
- Heat Pumps in the European Union: Status Report on Technology Development, Trends, Value Chains and Markets, 2025 (EUR 40528) · Joint Research Centre, European Commission · Section on hydronic heat pump sales (Figure 7 and the text above it)
- Commission Regulation (EU) No 813/2013 implementing Directive 2009/125/EC with regard to ecodesign requirements for space heaters and combination heaters · Publications Office of the European Union (EUR-Lex, Cellar) · Article 2 points (2) space heater and (17) heat pump space heater, SCOP definition; Annex II point 1(b)
- Commission Delegated Regulation (EU) No 811/2013 supplementing Directive 2010/30/EU with regard to the energy labelling of space heaters, combination heaters, packages of space heater, temperature control and solar device and packages of combination heater, temperature control and solar device · Publications Office of the European Union (EUR-Lex, Cellar) · Article 2 definition of sound power level; Annex III label layout for heat pump space heaters
- Regulation (EU) 2024/573 on fluorinated greenhouse gases · Publications Office of the European Union (Official Journal L 2024/573) · Art. 10(1) and (2)
- Midea ATW Heat Pump Installation Manual (R290 monobloc range M-Thermal Arctic Mono, file MD23IU-047I-EN, PDF modified 21 November 2024) · Midea Group · 2.8 Hydraulic module, 4.3 Drainage, 4.4 In cold climates, 5.5 Water pipe insulation, 5.6 Freeze protection, Safety precautions