Sound power level

A sound power level (LwA) is a value in dB that rates the A-weighted sound a source radiates, as shown on the EU label.

What is sound power level?

A sound power level is a value in dB that rates the sound power a source radiates into the air. The EU energy labelling rules for space heaters define it as the A-weighted sound power level, indoors and/or outdoors, in dB. They write it LwA (Regulation (EU) No 811/2013, Article 2, point 23). It describes the machine itself, for example a heat pump outdoor unit.

The same Regulation says the sound power level of a heater can be an important consideration for end-users. It says the labels of space heaters and combination heaters should carry it (recital 9). The heat pump label shows the value for the outdoors. If the unit has an indoor part, it shows that value too (Annex III). The values are rounded to whole dB. The Regulation ties the value to standard rating conditions, which are the operating conditions of the heater under average climate conditions (Article 2, point 7). A label figure is therefore a rating of the unit and not a prediction for your site.

How is sound power level different from sound pressure level?

Sound pressure level, written Lp, is the sound at one point. It depends on distance, reflecting surfaces and the room. Sound power level describes what the source emits. Reading a label figure as the noise at a neighbour's window is a common mistake. The table sets out the differences that matter when you read a product sheet next to a site plan.

PropertySound power level (LwA)Sound pressure level (Lp)
What it describesSound power radiated by the sourceSound level at one point in the air
Changes with distanceNoYes, it falls as the listener moves away
Depends on reflecting surfacesNo, it is a rating of the sourceYes, reflections add to the level at the point
Where it appearsEU energy label and product data sheetsMeasurements at a boundary or inside a room
Comparable between unitsYes, under the same rating conditionsOnly for the same position and installation

Why does distance lower sound pressure but not sound power?

A point source in a homogeneous medium radiates purely spherically. The energy spreads over a growing sphere, so the level measured at a point falls with distance. A technical report from Montana State University gives the standard point-source relation SPL = SWL - 20 log(r) - 11 dB, with r in metres. This is most often described as a 6 dB drop for each doubling of distance. If the ground is very hard and reflective, the report replaces 11 dB with 8 dB, because the reflected waves add to the direct ones. A line source falls more slowly, by 3 dB per doubling.

Here is an illustration with the point-source relation. A unit rated at 65 dB LwA gives about 65 - 14 - 11 = 40 dB at 5 m in open space. Over hard ground the same unit gives about 43 dB. At 10 m the figures are about 34 dB and 37 dB. This is a free-field estimate to show the trend. It is not an assessment under Slovak law, and walls near the unit change the result.

For a heat pump, the practical lesson is simple. A unit placed close to a neighbour's window, or over hard ground, raises the sound pressure there although the label value stays the same. Moving it further away lowers the level at the window without changing the machine.

Do EU rules limit the sound power level of heat pumps?

Yes. Annex II, point 3 of Regulation (EU) No 813/2013 sets maximum sound power levels for heat pumps from 26 September 2015. The limit depends on the rated heat output. The text published in 2013 gives these values.

Rated heat outputMaximum LwA indoorsMaximum LwA outdoors
6 kW or less60 dB65 dB
More than 6 kW up to 12 kW65 dB70 dB
More than 12 kW up to 30 kW70 dB78 dB
More than 30 kW up to 70 kW80 dB88 dB

These are limits on the product, not on the noise at a neighbour's window. A unit that meets them can still exceed a Slovak limit at a close boundary.

Where does Slovak law measure noise from a heat pump?

Slovak noise limits are in Decree of the Ministry of Health 549/2007 Z. z. The decree sets permissible values as equivalent A-weighted sound levels LAeq in dB, by category of area and reference time interval. Day is from 6.00 to 18.00, evening from 18.00 to 22.00 and night from 22.00 to 6.00 (§ 2 letter zh). The decree has no limits on sound power. A product's hladina akustického výkonu therefore cannot be compared with these limits directly. The limits relate to the hladina zvuku at the assessment point.

Section 6 (3) says where noise is assessed. Outdoor noise outside buildings is assessed at 1.5 m ± 0.2 m above the terrain. Outdoor noise in front of the outer wall of a building is assessed 1.5 m ± 0.5 m from the wall. The height is 1.5 m ± 0.2 m above the floor of the storey concerned.

In Table 1 of the annex, category II covers the space in front of the windows of residential rooms in flats and family houses. It also covers outdoor space in residential and recreational areas. For noise from sources other than traffic, category II allows 50 dB for day, 50 dB for evening and 45 dB for night. Category I (spa areas) allows 45, 45 and 40 dB. Category III allows 50, 50 and 45 dB, and category IV allows 70 dB at all times. For tonal or especially disturbing noise, the assessed value is the measured level plus a correction K of 5 dB (Table 2).

FigureWhere it appliesQuantityRole
Product labelUnit under standard rating conditionsSound power level LwA in dBCompares units, not a limit on site
Outdoor noise outside buildings1.5 m above the terrainLAeq in dBChecked against Table 1
Outdoor noise at a wall1.5 m from the wallLAeq in dBChecked against Table 1

What should you check on a heat pump data sheet?

The checks below are practical advice based on the definitions above. They are not requirements in a regulation.

  • Check whether the LwA figure is for the indoor unit, the outdoor unit or both.
  • Check the rated heat output of the model against the table above, because the limit depends on it.
  • Do not read the label as the sound level at a neighbour's window. That level needs a distance, a position and the surrounding surfaces.
  • When the unit sits close to a boundary, ask for a calculation or measurement at the neighbour's assessment point.

Does a lower sound power level always mean a quieter neighbourhood?

No. A lower LwA means the source radiates less sound power under the rating conditions, which is a real advantage when you compare two units. It does not fix the sound at a particular window, because that depends on distance and reflections. Sound insulation of the building envelope is a separate matter, covered by STN 73 0532. Inside the house, see room acoustics and airborne sound insulation.

For an air-to-water heat pump, the label figure is the start of the comparison. The sound pressure at the neighbour's assessment point is the figure that decides whether the placement works.

Frequently asked questions

What does LwA mean on a heat pump label?
LwA is the A-weighted sound power level of the unit in dB. The label shows it for the outdoors and, where the unit has an indoor part, for the indoors. It rates the source under standard rating conditions. It is not the sound level a neighbour hears at a particular spot.
Is sound power level the same as the noise I hear?
No. Sound power describes what the source radiates. The noise you hear is the sound pressure at your position, which depends on distance, reflecting surfaces and the room.
Why does the EU label show sound power and not sound pressure?
Regulation 811/2013 says the sound power level of a heater can be an important consideration for end-users and that it should be on the label. A rating of the source can be compared between units. Sound pressure depends on the installation.
Does moving the outdoor unit further away reduce its sound power?
No. Distance changes the sound pressure at a listener, not the sound power the unit radiates. In open space the sound pressure falls by about 6 dB for each doubling of distance, while the label value stays the same.
Which value do Slovak noise limits use?
Decree 549/2007 Z. z. sets permissible values as equivalent A-weighted sound levels at defined assessment points, not as sound power. For noise from sources other than traffic, category II allows 50 dB for day and evening and 45 dB for night.
Do EU rules limit the sound power of a heat pump?
Yes. Annex II of Regulation 813/2013 sets maximum sound power levels from 26 September 2015. For a unit of 6 kW or less the maximum is 60 dB indoors and 65 dB outdoors. Larger units have higher limits, up to 70 kW.

Sources

  1. Commission Delegated Regulation (EU) No 811/2013 supplementing Directive 2010/30/EU with regard to the energy labelling of space heaters, combination heaters, packages of space heater, temperature control and solar device and packages of combination heater, temperature control and solar device · Publications Office of the European Union (EUR-Lex, Cellar) · Recital 9; Article 2, points 7 and 23; Annex III (label content for heat pump space heaters)
  2. Commission Regulation (EU) No 813/2013 implementing Directive 2009/125/EC with regard to ecodesign requirements for space heaters and combination heaters · Publications Office of the European Union (EUR-Lex, Cellar) · Article 2, points 17 and 19; Annex I, points 22, 23, 27, 33, 38, 39, 40; Annex II points 3 and 5 (Table 2); Annex III point 4 and Table 4
  3. Vyhláška Ministerstva zdravotníctva Slovenskej republiky č. 549/2007 Z. z., ktorou sa ustanovujú podrobnosti o prípustných hodnotách hluku, infrazvuku a vibrácií a o požiadavkách na objektivizáciu hluku, infrazvuku a vibrácií v životnom prostredí · Ministerstvo zdravotníctva Slovenskej republiky, via Slov-Lex · § 2 písm. zh, § 6 ods. 3 písm. a) a b), príloha bod 1.1 až 1.3, tabuľky č. 1 a 2
  4. Atmospheric Sound Propagation Considerations for the Birdstrike Project (release version) · Montana State University, R. C. Maher with Z. Chen, 27 July 2004 (technical report) · Section 1, A Simple Model for Sound Propagation